| Name of Work: Developement of Smart Sports Infrastructure in Madan Mohan Malviya stadium and surrounding area managed by Sports Department, Prayagraj | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Kushti arena | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST | BI01010001010000000000000515BI0100001113 | 64.8 | cum |
| 3 | 1.02 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | BI01010001010000000000000515BI0100001114 | 324 | Sqm |
| 4 | 1.03 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:2:4 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST | BI01010001010000000000000515BI0100001115 | 32.4 | cum |
| 5 | 1.04 | RCC work with cement approved coarse sand and 4cm gauge approved stone grit in proportions of 1:2:4 in raft foundations and footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra excluding GST | BI01010001010000000000000515BI0100001116 | 48.6 | Sqm |
| 6 | 1.05 | M.S. (tor steel or plain) in palin work such as RCC or R.B work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST | BI01010001010000000000000515BI0100001117 | 4374 | Kg |
| 7 | 2 | Basket Ball (32 X 19 m) - Synthetic | BI01010001010000000000000515BI0100001118 | ||
| 8 | 2.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor Basket Ball Court- 150 mm thick\nFor Drain | BI01010001010000000000000515BI0100001119 | 130.22 | cum |
| 9 | 2.02 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Drain | BI01010001010000000000000515BI0100001120 | 6.63 | cum |
| 10 | 2.03 | M-150 Brick work in 1 cement and 5 coarse sand (F.M. 1.25) mortarin foundation and plinth including supply of all materials, labour & tools & Plants etc. required for proper completion of the work. Excluding GST \nFor Drain | BI01010001010000000000000515BI0100001121 | 16.065 | cum |
| 11 | 2.04 | 12 mm thick cement plaster with cement & fine sand mortar in proportion of 1:6 complete, Excluding GST\nFor Drain walls | BI01010001010000000000000515BI0100001122 | 142.8 | Sqm |
| 12 | 2.05 | M.S or Iron work of small sizes and section such as holding down bolts, hold fast, tie road grating etc. brought to required from including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Excluding GST\nFor MS Rectangular Flat Section (50 mm X 5 mm)-Drain Grating | BI01010001010000000000000515BI0100001123 | 2040 | Kg |
| 13 | 2.06 | Providing, laying, spreading and compacting graded stone aggregate to wet Mix Macadam specification including premixing the Material with water at OMC by Mix in palce method and carriage of mixed Material by tipper to site, laying in uniform layers with appropriate machinery as per the site conditions in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.\nFor Basket Ball Court- 100 mm thick | BI01010001010000000000000515BI0100001124 | 60.8 | cum |
| 14 | 2.07 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.70 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | BI01010001010000000000000515BI0100001125 | 1216 | Sqm |
| 15 | 2.08 | Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5 percent by weight of total mix and filler, transported to site, laid over a previously prepared surface with hydrostatic paver finisher with sensor control to required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per the MoRTH specification Clause No.507 complete in all respects.\nFor Basket Ball Court - 30 mm | BI01010001010000000000000515BI0100001126 | 18.24 | cum |
| 16 | 2.09 | Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.\nFor Basket Ball Court - 20 mm | BI01010001010000000000000515BI0100001127 | 12.16 | cum |
| 17 | 2.1 | Sports Surfaces\nSupply and Installation of Synthetic Acrylic 8 Layers Surface approved by ITF. \nIncluding Line Marking as per FIBA Specifications and Guidelines. | BI01010001010000000000000515BI0100001128 | 608 | Sqm |
| 18 | 2.11 | Sports Accessories\nSupply and Installation of Fixed Basketball Post,Net as per FIBA Specifications and Guidelines. | BI01010001010000000000000515BI0100001129 | 1 | Pair |
| 19 | 3 | Volley Ball Court (34 X 19 m) - 2 Nos | BI01010001010000000000000515BI0100001130 | ||
| 20 | 3.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor Volley Ball Court - 150 mm thick\nFor Drain | BI01010001010000000000000515BI0100001131 | 274.89 | cum |
| 21 | 3.02 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Drain | BI01010001010000000000000515BI0100001132 | 13.78 | cum |
| 22 | 3.03 | M-150 Brick work in 1 cement and 5 coarse sand (F.M. 1.25) mortarin foundation and plinth including supply of all materials, labour & tools & Plants etc. required for proper completion of the work. Excluding GST \nFor Drain | BI01010001010000000000000515BI0100001133 | 33.39 | cum |
| 23 | 3.04 | 12 mm thick cement plaster with cement & fine sand mortar in proportion of 1:6 complete, Excluding GST\nFor Drain walls | BI01010001010000000000000515BI0100001134 | 296.8 | Sqm |
| 24 | 3.05 | M.S or Iron work of small sizes and section such as holding down bolts, hold fast, tie road grating etc. brought to required from including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Excluding GST\nFor MS Rectangular Flat Section (50 mm X 5 mm)-Drain Grating | BI01010001010000000000000515BI0100001135 | 4240 | Kg |
| 25 | 3.06 | Providing, laying, spreading and compacting graded stone aggregate to wet Mix Macadam specification including premixing the Material with water at OMC by Mix in palce method and carriage of mixed Material by tipper to site, laying in uniform layers with appropriate machinery as per the site conditions in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.\nFor Volley Ball Court- 100 mm thick | BI01010001010000000000000515BI0100001136 | 129.2 | cum |
| 26 | 3.07 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.70 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.\nFor Volley Ball Court | BI01010001010000000000000515BI0100001137 | 1292 | Sqm |
| 27 | 3.08 | Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5 percent by weight of total mix and filler, transported to site, laid over a previously prepared surface with hydrostatic paver finisher with sensor control to required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per the MoRTH specification Clause No.507 complete in all respects.\nFor Volley Ball Court - 30 mm | BI01010001010000000000000515BI0100001138 | 38.76 | cum |
| 28 | 3.09 | Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.\nFor Volley Ball Court - 20 mm | BI01010001010000000000000515BI0100001139 | 25.84 | cum |
| 29 | 3.1 | Sports Surfaces\nSupply and Installation of Synthetic Acrylic 8 Layers from FIFA Preferred producer With Line marking as per IVF guidelines. | BI01010001010000000000000515BI0100001140 | 1292 | Sqm |
| 30 | 3.11 | Sports Accessories\nSupply and Installation of Fixed Volleyball Post,Net as per IVF Specifications and Guidelines. | BI01010001010000000000000515BI0100001141 | 2 | Pair |
| 31 | 4 | Badminton Court - 2 Nos (16.4 X 8.5 m) - Synthetic | BI01010001010000000000000515BI0100001142 | ||
| 32 | 4.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor Badminton Court- 150 mm thick\nFor Drain | BI01010001010000000000000515BI0100001143 | 79.92 | cum |
| 33 | 4.02 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Drain | BI01010001010000000000000515BI0100001144 | 6.474 | cum |
| 34 | 4.03 | M-150 Brick work in 1 cement and 5 coarse sand (F.M. 1.25) mortarin foundation and plinth including supply of all materials, labour & tools & Plants etc. required for proper completion of the work. Excluding GST \nFor Drain | BI01010001010000000000000515BI0100001145 | 15.687 | cum |
| 35 | 4.04 | 12 mm thick cement plaster with cement & fine sand mortar in proportion of 1:6 complete, Excluding GST\nFor Drain walls | BI01010001010000000000000515BI0100001146 | 139.44 | Sqm |
| 36 | 4.05 | M.S or Iron work of small sizes and section such as holding down bolts, hold fast, tie road grating etc. brought to required from including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Excluding GST\nFor MS Rectangular Flat Section (50 mm X 5 mm)-Drain Grating | BI01010001010000000000000515BI0100001147 | 1992 | kg |
| 37 | 4.06 | Providing, laying, spreading and compacting graded stone aggregate to wet Mix Macadam specification including premixing the Material with water at OMC by Mix in palce method and carriage of mixed Material by tipper to site, laying in uniform layers with appropriate machinery as per the site conditions in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.\nFor Badminton Court- 100 mm thick | BI01010001010000000000000515BI0100001148 | 27.88 | cum |
| 38 | 4.07 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.70 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | BI01010001010000000000000515BI0100001149 | 278.8 | Sqm |
| 39 | 4.08 | Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5 percent by weight of total mix and filler, transported to site, laid over a previously prepared surface with hydrostatic paver finisher with sensor control to required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per the MoRTH specification Clause No.507 complete in all respects.\nFor Badminton Court- 30 mm thick | BI01010001010000000000000515BI0100001150 | 8.364 | cum |
| 40 | 4.09 | Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.\nFor Badminton Court- 20 mm thick | BI01010001010000000000000515BI0100001151 | 5.576 | cum |
| 41 | 4.1 | Sports Surfaces\nSupply and Installation of Synthetic Acrylic 8 Layers Surface approved by ITF. \nIncluding Line Marking as per BWF Specifications and Guidelines. | BI01010001010000000000000515BI0100001152 | 278.8 | sqm |
| 42 | 4.11 | Sports Accessories\nSupply and Installation of Removable Badminton Poles,Net as per BWF Specifications and Guidelines. | BI01010001010000000000000515BI0100001153 | 2 | pair |
| 43 | 5 | HandBall Court (44 X 30 m) - 1 No | BI01010001010000000000000515BI0100001154 | ||
| 44 | 5.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor HandBall Court - 150 mm thick\nFor Drain | BI01010001010000000000000515BI0100001155 | 254.61 | cum |
| 45 | 5.02 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST | BI01010001010000000000000515BI0100001156 | 9.62 | cum |
| 46 | 5.03 | M-150 Brick work in 1 cement and 5 coarse sand (F.M. 1.25) mortarin foundation and plinth including supply of all materials, labour & tools & Plants etc. required for proper completion of the work. Excluding GST \nFor Drain | BI01010001010000000000000515BI0100001157 | 23.31 | cum |
| 47 | 5.04 | 12 mm thick cement plaster with cement & fine sand mortar in proportion of 1:6 complete, Excluding GST\nFor Drain walls | BI01010001010000000000000515BI0100001158 | 207.2 | Sqm |
| 48 | 5.05 | M.S or Iron work of small sizes and section such as holding down bolts, hold fast, tie road grating etc. brought to required from including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Excluding GST\nFor MS Rectangular Flat Section (50 mm X 5 mm)-Drain Grating | BI01010001010000000000000515BI0100001159 | 2960 | kg |
| 49 | 5.06 | Providing, laying, spreading and compacting graded stone aggregate to wet Mix Macadam specification including premixing the Material with water at OMC by Mix in palce method and carriage of mixed Material by tipper to site, laying in uniform layers with appropriate machinery as per the site conditions in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.\nFor HandBall Court - 100 mm thick | BI01010001010000000000000515BI0100001160 | 132 | cum |
| 50 | 5.07 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.70 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.\nFor HandBall Court | BI01010001010000000000000515BI0100001161 | 2640 | Sqm |
| 51 | 5.08 | Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5 percent by weight of total mix and filler, transported to site, laid over a previously prepared surface with hydrostatic paver finisher with sensor control to required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per the MoRTH specification Clause No.507 complete in all respects.\nFor HandBall Court - 30 mm | BI01010001010000000000000515BI0100001162 | 39.6 | cum |
| 52 | 5.09 | Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.\nFor HandBall Court - 20 mm | BI01010001010000000000000515BI0100001163 | 26.4 | cum |
| 53 | 5.1 | Sports Surfaces\nSupply and Installation of Synthetic Acrylic 8 Layers Surface approved by ITF. \nIncluding Line Marking as per IHF Specifications and Guidelines. | BI01010001010000000000000515BI0100001164 | 1320 | Sqm |
| 54 | 5.11 | Sports Accessories\nSupply and Installation of Moveable Handball Goal Post as per IHF Specifications and Guidelines. | BI01010001010000000000000515BI0100001165 | 1 | Pair |
| 55 | 6 | Green Tennis Court - 1 No (30 X 15 m) | BI01010001010000000000000515BI0100001166 | ||
| 56 | 6.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor Tennis Court - 200 mm thick\nFor Drain | BI01010001010000000000000515BI0100001167 | 124.43 | cum |
| 57 | 6.02 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Drain | BI01010001010000000000000515BI0100001168 | 5.85 | cum |
| 58 | 6.03 | M-150 Brick work in 1 cement and 5 coarse sand (F.M. 1.25) mortarin foundation and plinth including supply of all materials, labour & tools & Plants etc. required for proper completion of the work. Excluding GST \nFor Drain | BI01010001010000000000000515BI0100001169 | 14.175 | cum |
| 59 | 6.04 | 12 mm thick cement plaster with cement & fine sand mortar in proportion of 1:6 complete, Excluding GST\nFor Drain walls | BI01010001010000000000000515BI0100001170 | 126 | Sqm |
| 60 | 6.05 | M.S or Iron work of small sizes and section such as holding down bolts, hold fast, tie road grating etc. brought to required from including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Excluding GST\nFor MS Rectangular Flat Section (50 mm X 5 mm)-Drain Grating | BI01010001010000000000000515BI0100001171 | 1800 | Kg |
| 61 | 6.06 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:2:4 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Tennis Court- 100 mm thick | BI01010001010000000000000515BI0100001172 | 45 | cum |
| 62 | 6.07 | RCC work with cement approved coarse sand and 4cm gauge approved stone grit in proportions of 1:2:4 in raft foundations and footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra excluding GST\nFor Tennis Court- 100 mm thick | BI01010001010000000000000515BI0100001173 | 45 | cum |
| 63 | 6.08 | M.S. (tor steel or plain) in palin work such as RCC or R.B work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST\nFor Tennis Court @ 90 kg/cum | BI01010001010000000000000515BI0100001174 | 4050 | Kg |
| 64 | 6.09 | Sports Surfaces\nSupply and Installation of Synthetic Acrylic 8 Layers Surface approved by ITF. \nIncluding Line Marking as per ITF Specifications and Guidelines. | BI01010001010000000000000515BI0100001175 | 450 | Sqm |
| 65 | 6.1 | Sports Accessories\nSupply and Installation of Removable Tennis Poles, Net as per ITF Specifications and Guidelines. | BI01010001010000000000000515BI0100001176 | 1 | Pair |
| 66 | 6.11 | Orange Tennis Court - 2 Nos (25 X 15 m) | BI01010001010000000000000515BI0100001177 | ||
| 67 | 6.12 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor Tennis Court - 200 mm thick\nFor Drain | BI01010001010000000000000515BI0100001178 | 211.2 | cum |
| 68 | 6.13 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Drain | BI01010001010000000000000515BI0100001179 | 10.4 | cum |
| 69 | 6.14 | M-150 Brick work in 1 cement and 5 coarse sand (F.M. 1.25) mortarin foundation and plinth including supply of all materials, labour & tools & Plants etc. required for proper completion of the work. Excluding GST \nFor Drain | BI01010001010000000000000515BI0100001180 | 25.2 | cum |
| 70 | 6.15 | 12 mm thick cement plaster with cement & fine sand mortar in proportion of 1:6 complete, Excluding GST\nFor Drain walls | BI01010001010000000000000515BI0100001181 | 224 | Sqm |
| 71 | 6.16 | M.S or Iron work of small sizes and section such as holding down bolts, hold fast, tie road grating etc. brought to required from including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Excluding GST\nFor MS Rectangular Flat Section (50 mm X 5 mm)-Drain Grating | BI01010001010000000000000515BI0100001182 | 3200 | Kg |
| 72 | 6.17 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:2:4 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Tennis Court- 100 mm thick | BI01010001010000000000000515BI0100001183 | 75 | cum |
| 73 | 6.18 | RCC work with cement approved coarse sand and 4cm gauge approved stone grit in proportions of 1:2:4 in raft foundations and footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra excluding GST\nFor Tennis Court- 100 mm thick | BI01010001010000000000000515BI0100001184 | 75 | cum |
| 74 | 6.19 | M.S. (tor steel or plain) in palin work such as RCC or R.B work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST\nFor Tennis Court @ 90 kg/cum | BI01010001010000000000000515BI0100001185 | 6750 | Kg |
| 75 | 6.2 | Sports Surfaces\nSupply and Installation of Synthetic Acrylic 8 Layers Surface approved by ITF. \nIncluding Line Marking as per ITF Specifications and Guidelines. | BI01010001010000000000000515BI0100001186 | 750 | Sqm |
| 76 | 6.21 | Sports Accessories\nSupply and Installation of Removable Tennis Poles, Net as per ITF Specifications and Guidelines. | BI01010001010000000000000515BI0100001187 | 2 | Pair |
| 77 | 6.22 | Red Tennis Court - 7 Nos (15 X 8 m) | BI01010001010000000000000515BI0100001188 | ||
| 78 | 6.23 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor Tennis Court - 200 mm thick\nFor Drain | BI01010001010000000000000515BI0100001189 | 291.17 | cum |
| 79 | 6.24 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Drain | BI01010001010000000000000515BI0100001190 | 20.93 | cum |
| 80 | 6.25 | M-150 Brick work in 1 cement and 5 coarse sand (F.M. 1.25) mortarin foundation and plinth including supply of all materials, labour & tools & Plants etc. required for proper completion of the work. Excluding GST \nFor Drain | BI01010001010000000000000515BI0100001191 | 50.715 | cum |
| 81 | 6.26 | 12 mm thick cement plaster with cement & fine sand mortar in proportion of 1:6 complete, Excluding GST\nFor Drain walls | BI01010001010000000000000515BI0100001192 | 450.8 | Sqm |
| 82 | 6.27 | M.S or Iron work of small sizes and section such as holding down bolts, hold fast, tie road grating etc. brought to required from including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Excluding GST\nFor MS Rectangular Flat Section (50 mm X 5 mm)-Drain Grating | BI01010001010000000000000515BI0100001193 | 6440 | Kg |
| 83 | 6.28 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:2:4 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Tennis Court- 100 mm thick | BI01010001010000000000000515BI0100001194 | 84 | cum |
| 84 | 6.29 | RCC work with cement approved coarse sand and 4cm gauge approved stone grit in proportions of 1:2:4 in raft foundations and footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra excluding GST\nFor Tennis Court- 100 mm thick | BI01010001010000000000000515BI0100001195 | 84 | cum |
| 85 | 6.3 | M.S. (tor steel or plain) in palin work such as RCC or R.B work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST\nFor Tennis Court @ 90 kg/cum | BI01010001010000000000000515BI0100001196 | 7560 | Kg |
| 86 | 6.31 | Sports Surfaces\nSupply and Installation of Synthetic Acrylic 8 Layers Surface approved by ITF. \nIncluding Line Marking as per ITF Specifications and Guidelines. | BI01010001010000000000000515BI0100001197 | 840 | Sqm |
| 87 | 6.32 | Sports Accessories\nSupply and Installation of Removable Tennis Poles, Net as per ITF Specifications and Guidelines. | BI01010001010000000000000515BI0100001198 | 7 | Pair |
| 88 | 7 | Cricket Net Practice | BI01010001010000000000000515BI0100001199 | ||
| 89 | 7.01 | Providing of 50mm G.I Pipe B Class Jindal/J.T.C make with G.I fittings ISI marked and clamps including making goodwalls ceiling and floor including supply of all materials, labour, T&P etc., required for proper completion of the work including supply of materials, labour, T&P etc., and other as directed by engineer-in-charge.\n50 mm G.I Vertical Pipes for Cricket Net Practice | BI01010001010000000000000515BI0100001200 | 75 | Rmt |
| 90 | 7.02 | Fixing of 50mm G.I Pipe B Class Jindal/J.T.C make with G.I fittings ISI marked and clamps including making goodwalls ceiling and floor including supply of all materials, labour, T&P etc., required for proper completion of the work including supply of materials, labour, T&P etc., and other as directed by engineer-in-charge.\n50 mm G.I Vertical Pipes for Cricket Net Practice | BI01010001010000000000000515BI0100001201 | 75 | Rmt |
| 91 | 7.03 | Providing of 40mm G.I Pipe B Class Jindal/J.T.C make with G.I fittings ISI marked and clamps including making goodwalls ceiling and floor including supply of all materials, labour, T&P etc., required for proper completion of the work including supply of materials, labour, T&P etc., and other as directed by engineer-in-charge.\n40 mm G.I Horizontal Pipes for Cricket Net Practice | BI01010001010000000000000515BI0100001202 | 30 | Rmt |
| 92 | 7.04 | Fixing of 40mm G.I Pipe B Class Jindal/J.T.C make with G.I fittings ISI marked and clamps including making goodwalls ceiling and floor including supply of all materials, labour, T&P etc., required for proper completion of the work including supply of materials, labour, T&P etc., and other as directed by engineer-in-charge.\n40 mm G.I Horizontal Pipes for Cricket Net Practice | BI01010001010000000000000515BI0100001203 | 30 | Rmt |
| 93 | 7.05 | Supply & fixing of Standard Cricket Practice knotted nets made from synthetic polymer (Polyethelene) having colour black/ green with mesh size of 50mm and twain diameter of 1.8mm to 2.00mm thick. Net should be UV stabilized and rot proof. Net will be fixed to GI poles with suitable clips and accessories etc complete as per directions of the Engineer-in-charge. Rate includes cost of net of standard size, required accessories, conveyance charges, labour charges for fixing, over heads & contractor's profit etc., complete.\nFor Sides of Cricket Net Practice \nFor Top Cricket Net Practice \nFor Back side Cricket Net Practice | BI01010001010000000000000515BI0100001204 | 622.88 | sqm |
| 94 | 8 | Kho Kho Court | BI01010001010000000000000515BI0100001205 | ||
| 95 | 8.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor Kho Kho Court - 200 mm thick | BI01010001010000000000000515BI0100001206 | 93 | cum |
| 96 | 8.02 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | BI01010001010000000000000515BI0100001207 | 620 | sqm |
| 97 | 8.03 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:2:4 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Kho Kho Court - 200 mm thick | BI01010001010000000000000515BI0100001208 | 93 | cum |
| 98 | 8.04 | Supply and fixing of Kho Kho Poles as per the specifications and as directed by the Engineer incharge. | BI01010001010000000000000515BI0100001209 | 1 | pair |
| 99 | 9 | Shot Put Throwing Circle - 2 Nos | BI01010001010000000000000515BI0100001210 | ||
| 100 | 9.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST | BI01010001010000000000000515BI0100001211 | 2.75 | cum |
| 101 | 9.02 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST | BI01010001010000000000000515BI0100001212 | 0.11 | cum |
| 102 | 9.03 | RCC work with cement approved coarse sand and 4cm gauge approved stone grit in proportions of 1:2:4 in raft foundations and footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra excluding GST | BI01010001010000000000000515BI0100001213 | 1.65 | cum |
| 103 | 9.04 | M.S. (tor steel or plain) in palin work such as RCC or R.B work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST | BI01010001010000000000000515BI0100001214 | 297 | Kg |
| 104 | 10 | Combined Discuss and Hammer Throw Cage - 1 Nos | BI01010001010000000000000515BI0100001215 | ||
| 105 | 10.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST | BI01010001010000000000000515BI0100001216 | 1 | cum |
| 106 | 10.02 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST | BI01010001010000000000000515BI0100001217 | 0.04 | cum |
| 107 | 10.03 | RCC work with cement approved coarse sand and 4cm gauge approved stone grit in proportions of 1:2:4 in raft foundations and footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra excluding GST | BI01010001010000000000000515BI0100001218 | 0.6 | cum |
| 108 | 10.04 | M.S. (tor steel or plain) in palin work such as RCC or R.B work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST | BI01010001010000000000000515BI0100001219 | 54 | Kg |
| 109 | 11 | 400 mts, 8 lane IAAF approved, Synthetic Athletic Track, FULL PUR System, minimum thickness of 15 mm | BI01010001010000000000000515BI0100001220 | ||
| 110 | 11.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST | BI01010001010000000000000515BI0100001221 | 1817.2 | cum |
| 111 | 11.02 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | BI01010001010000000000000515BI0100001222 | 4244 | Sqm |
| 112 | 11.03 | Providing, laying, spreading and compacting graded stone aggregate to wet Mix Macadam specification including premixing the Material with water at OMC by Mix in palce method and carriage of mixed Material by tipper to site, laying in uniform layers with appropriate machinery as per the site conditions in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | BI01010001010000000000000515BI0100001223 | 848.8 | cum |
| 113 | 11.04 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.70 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | BI01010001010000000000000515BI0100001224 | 8488 | Sqm |
| 114 | 11.05 | Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5 percent by weight of total mix and filler, transported to site, laid over a previously prepared surface with hydrostatic paver finisher with sensor control to required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per the MoRTH specification Clause No.507 complete in all respects.\nFor Athletic Track - 50 mm | BI01010001010000000000000515BI0100001225 | 212.2 | cum |
| 115 | 11.06 | Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.\nFor Athletic Track - 30 mm | BI01010001010000000000000515BI0100001226 | 127.32 | cum |
| 116 | 11.07 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Inner Drainage\nFor Outer Drainage | BI01010001010000000000000515BI0100001227 | 59.5 | cum |
| 117 | 11.08 | RCC work with cement approved coarse sand and 4cm gauge approved stone grit in proportions of 1:2:4 in raft foundations and footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra excluding GST\nFor Drain raft and walls | BI01010001010000000000000515BI0100001228 | 193.38 | cum |
| 118 | 11.09 | M.S. (tor steel or plain) in palin work such as RCC or R.B work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Excluding GST\nFor drainage | BI01010001010000000000000515BI0100001229 | 17403.8 | kg |
| 119 | 11.1 | Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as per direction of Engineer-in-charge.\nFor drainage | BI01010001010000000000000515BI0100001230 | 850 | Nos |
| 120 | 11.11 | Providing and laying of WORLD ATHLETICS (IAAF) approved synthetic athletic track FULL PUR of minimum thickness of 15mm, including all marking on the surface and installation of all equipments as per WORLD ATHLETICS (IAAF) rules and standard etc. complete. The track to be got certified for class-II WORLD ATHLETCS (IAAF) Certificate and as per Norms of IAAF, specifications, detailed Drawings etc complete. as per the instructions of the engineer in- charge\nNormal Stress Area with a minimum thickness of 15mm of finished track surface | BI01010001010000000000000515BI0100001231 | 4244 | Sqm |
| 121 | 12 | Kota-Gravel Pathway | BI01010001010000000000000515BI0100001232 | ||
| 122 | 12.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST | BI01010001010000000000000515BI0100001233 | 52.425 | cum |
| 123 | 12.02 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST | BI01010001010000000000000515BI0100001234 | 34.95 | cum |
| 124 | 12.03 | Supply and fixing of Kota stone in flooring 20 mm thick and joint filled with 1:2 cement and coarse sand with approved colouring materials to be given and even shade with 12 mm base coat (bedding) of 1:2 cement and coarse sand mortar and polished by hand or machine and finally finished with french manson polish or other approved polish including supply of all materials, labour T&P etc. required for proper completion of the work excluding base concrete. Excluding GST | BI01010001010000000000000515BI0100001235 | 345 | sqm |
| 125 | 12.04 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | BI01010001010000000000000515BI0100001236 | 287.5 | cum |
| 126 | 13 | Decking | BI01010001010000000000000515BI0100001237 | ||
| 127 | 13.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor Kerb stone | BI01010001010000000000000515BI0100001238 | 35.25 | cum |
| 128 | 13.02 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Kerb stone | BI01010001010000000000000515BI0100001239 | 141 | cum |
| 129 | 13.03 | Providing and laying at or near ground level factory made kerb stone of M-25 grad ecement concrete in position to the required line, level and curvature, jointed with cement mortar1:3 (1cement:3coarsesand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in- charge (length of finished kerb edging shallbe measured for payment). (Precast C.C.ker bstone shallbe approved by Engineer-in-charge).(DAR 16.69)\nFor Kerb stone | BI01010001010000000000000515BI0100001240 | 940 | Rmt |
| 130 | 13.04 | M.S or Iron work of small sizes and section such as holding down bolts, hold fast, tie road grating etc. brought to required from including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Excluding GST\nFor MS Rectangular Hollow Section (100 mm X 75 mm)\nFor MS Squre Hollow Section (25 mm X 25 mm) | BI01010001010000000000000515BI0100001241 | 16732 | kg |
| 131 | 13.05 | Supply and Fixing of Fibre cement cncrete Planks (240mmX20mm) | BI01010001010000000000000515BI0100001242 | 750 | sqm |
| 132 | 13.06 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.\nFor Percolation | BI01010001010000000000000515BI0100001243 | 82.25 | cum |
| 133 | 13.07 | Yoga Zone | BI01010001010000000000000515BI0100001244 | ||
| 134 | 13.08 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST | BI01010001010000000000000515BI0100001245 | 14.73 | cum |
| 135 | 13.09 | Cement concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:3:6 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST | BI01010001010000000000000515BI0100001246 | 9.82 | cum |
| 136 | 13.1 | Providing & laying coloured and textured imprinted cast in place concrete flooring, applying finishing the top surface, in accordance with sprinkling of colour hardener at the rate of 2.7 kg./sq.mt. Floating the surface application of release agent, stamping the concrete with stamping tools, cleaning the surface with water jet and application of acrylic based sealer (Bomanite or equivalant) for finishing complete as per directions of the engineer-in-charge. The work includes providing and Laying av. 100 mm thick M25 grade BMC / RMC concrete including well compaction, necessary finishing top surface, side supports, leveling, ;pumping, curing, compound etc. complete. Treatment of Construction Joints by Groove cutting of size 4 mm x 20 mm in panel size approximately 3mtr x 3 mtr all complete as per approved design, pattern & direction of Engineer in charge. (AR)-Stamp Concrete(Residential Entrances) | BI01010001010000000000000515BI0100001247 | 4.91 | sqm |
| 137 | 13.11 | Benches | BI01010001010000000000000515BI0100001248 | ||
| 138 | 13.12 | Supply and Fixing of cast iron antique style bench having weight of sides not less than 72 kg (36 kg each) fitted with MS rectangular Pipe. Length of Bench should not be less than 6 ft 9 inches (end to end of cast iron support) with following specifications. \na) MS Pipe as per IS 4923/1997: 50 mm X 25 mm, thickness of pipe should not be less than 2.9mm and weight should not be less than 2.98 kg/meter. Pipe will be fixed with Nut and Bolt and by flattening the extra length of bolt end smoothened at the end as per direction of Engineer In-charge. \nb) All pipes will be welded at the centre with support of a flat iron not less than 5 mm thick and 25 mm wide with full welding and grinding as per direction of Engineer In-charge. \nc) A decorative head made of Mild steel of size not less than 12 inches long and 6 inches high will be provided with the strong support of flat Iron and top MS rectangular Pipe at the centre of the bench at the back as per direction of Engineer In-charge. \n\nd) Fixing of the benches at site with top quality spray painting will be done with the help of clamp not less than 1.5 ft height and made of 20mm*5mm flat iron with provision of hold fast at the end. The clamp will be grouted in the ground in a hole of 6inches *6 inches with concrete of grade M200. | BI01010001010000000000000515BI0100001249 | 95 | Nos |
| 139 | 13.13 | Cladding | BI01010001010000000000000515BI0100001250 | ||
| 140 | 13.14 | Dismantling C.C/Brick/Granolithic floors including stacking of dismantled materials with in 60 m distance as directed by Engineer incharge. | BI01010001010000000000000515BI0100001251 | 534 | sqm |
| 141 | 13.15 | Cartage of ballast, kankar, coal, grit or sand etc, including loading and unloading but excluding stackins on pucca roads.\nDistance 5 km | BI01010001010000000000000515BI0100001252 | 72 | cum |
| 142 | 13.16 | 12 mm thick cement plaster with cement & fine sand mortar in proportion of 1:4 complete, Excluding GST\nFor Treads of the Stadia beside Handball Court\nFor Risers of the Stadia beside Handball Court | BI01010001010000000000000515BI0100001253 | 534 | Sqm |
| 143 | 13.17 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush.\nRed sand stone\nFor Risers of the Stadia beside Handball Court\nFor Risers of the Stadia beside Handball Court | BI01010001010000000000000515BI0100001254 | 444 | Sqm |
| 144 | 13.18 | Site Clearance | BI01010001010000000000000515BI0100001255 | ||
| 145 | 13.19 | Clearing jungle including of rank vegetations, grass, bush, wood trees and saplings of girth upto 30 cm. Measred at a height of 1.00 mtr. Above groun level & removal of rubbish upto a distance of 50 mtr. Outside the periphery of area cleared. Excluding GST | BI01010001010000000000000515BI0100001256 | 9000 | Sqm |
| 146 | 13.2 | Supply and fixing of Dustbins made up of Iron having PVC bucket for Wet and Dry garbage combined | BI01010001010000000000000515BI0100001257 | 10 | Nos |
| 147 | 14 | Fencing | BI01010001010000000000000515BI0100001258 | ||
| 148 | 14.01 | Exacavation in ordinary soil(Loam caly or sand) including lift upto 1.5m and lead upto 30mtr. Including filling,watering and ramming of excavated earth into the trenches of into the space between the building and the sides of the structure and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the structures.Excluding GST\nFor Fencing foundation | BI01010001010000000000000515BI0100001259 | 26.25 | cum |
| 149 | 14.02 | Cement concrete with 20 mm gauge approved stone ballast, coarse sand and cement in proportions of 1:1.5:3 including supply of all materials, labour, tools & plant ec reuired for proper completion of the work. Excluding GST\nFor Fencing foundation | BI01010001010000000000000515BI0100001260 | 26.25 | cum |
| 150 | 14.03 | M-150 Brick work in 1 cement and 5 coarse sand (F.M. 1.25) mortarin foundation and plinth including supply of all materials, labour & tools & Plants etc. required for proper completion of the work. Excluding GST\nFor Fencing foundation | BI01010001010000000000000515BI0100001261 | 196.875 | cum |
| 151 | 14.04 | 12 mm thick cement plaster with cement & fine sand mortar in proportion of 1:6 complete, Excluding GST\nFor Fencing foundation | BI01010001010000000000000515BI0100001262 | 875 | Sqm |
| 152 | 14.05 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001263 | 6125 | Sqm |
| 153 | 14.06 | M.S or Iron work of small sizes and section such as holding down bolts, hold fast, tie road grating etc. brought to required from including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Excluding GST | BI01010001010000000000000515BI0100001264 | 25520.8 | kg |
| 154 | 15 | Operation and Maintanance - 5 Years | BI01010001010000000000000515BI0100001265 | ||
| 155 | 15.01 | charges for Security Staff (3 shifts per day) | BI01010001010000000000000515BI0100001266 | 720 | Month |
| 156 | 15.02 | charges for Gardener - 2 Nos | BI01010001010000000000000515BI0100001267 | 120 | Month |
| 157 | 15.03 | charges for Sweeper - 2 Nos | BI01010001010000000000000515BI0100001268 | 120 | Month |
| 158 | 15.04 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture | BI01010001010000000000000515BI0100001269 | 15380 | Sqm |