| 1 | 1.01 | Routine maintenance and attending breakdown of lighting / welding system, Heavy Duty Fuse Switch Units of coal handling plant of 3x210 MW units for proper lighting and welding supply including checking and minor maintenance of associated equipment and switches. (As per scope of work) | BI01010001010000000000000515BI0100001113 | 365 | Per day (24Hrs) |
|---|
| 2 | 1.02 | Operation of hoist (As per scope of work) | BI01010001010000000000000515BI0100001114 | 830 | Per Shift (830) |
|---|
| 3 | 2.01 | Repositioning of entangled steel wire rope, replacement of steel wire rope | 01 Job/Hoist | 25 | 01 Job/Hoist |
|---|
| 4 | 2.02 | Attending fault in the control panel of overhead system including replacement of defective components. | 01 Job/Hoist | 120 | 01 Job/Hoist |
|---|
| 5 | 2.03 | Maintenance of hoist which includes replacement of motors, bearings, cleaning of panels, control circuit, cleaning of monorail & other accessories. | 01 Job/Hoist | 6 | 01 Job/Hoist |
|---|
| 6 | 2.04 | Doing steel wire rope of single/double drum hoists in single rope by removing hook pulley for positioning of conveyor belt and for other works. | 01 Job/Hoist | 15 | 01 Job/Hoist |
|---|
| 7 | 2.05 | Repositioning of steel wire rope with hook pulley in single/double drum hoist after positioning of conveyor belt and other works. | 01 Job/Hoist | 15 | 01 Job/Hoist |
|---|
| 8 | 2.06 | Bringing down the hoist unit from mono-rail of the respective floor for attending the breakdown , complete overhauling and repositioning | Twin Cyl/ Drum Hoist | 4 | Twin Cyl/ Drum Hoist |
|---|
| 9 | 2.07 | Bringing down the hoist unit from mono-rail of the respective floor for attending the breakdown , complete overhauling and repositioning | Single Cyl/ Drum Hoist | 4 | Single Cyl/ Drum Hoist |
|---|
| 10 | 2.08 | Shifting of hook pulley from hoist to another / replacement by new hook pulley. | Job / No. | 15 | Job / No. |
|---|
| 11 | 2.09 | Railing/Travelling hoist Motor Breakdown maintenance(along with Motor alignment) | Job / No. | 6 | Job / No. |
|---|
| 12 | 3.01 | Providing & Installation of 7” x 4” sun mica top wooden board | | 10 | Job / No. |
|---|
| 13 | 3.02 | Providing & Installation of 15A, 240V Anchor make switch socket combined unit with sun mica top wooden board. | | 10 | Job / No. |
|---|
| 14 | 3.03 | Providing & Installation of 15A, 240V Anchor make fuse type switch with sun mica top wooden board. | | 7 | Job / No. |
|---|
| 15 | 3.04 | Providing & Installation of 15A, 240V flush type anchor/ standard quality make switch with three pin socket with sun mica top wooden board. | | 8 | Job / No. |
|---|
| 16 | 3.05 | Installation of Junction box off size | | 8 | Job / No. |
|---|
| 17 | 3.06 | CABLE LAYING / SALVAGING up to 10mm2 | | 700 | Per Mtr. |
|---|
| 18 | 3.07 | CABLE LAYING / SALVAGING Power XLPE Aluminum Cable Above 10 mm2 up to 50 mm2 | | 225 | Per Mtr. |
|---|
| 19 | 3.08 | CABLE LAYING / SALVAGING Power XLPE Aluminum Cable Above 50 mm2 up to 240 mm2 | | 225 | Per Mtr. |
|---|
| 20 | 3.09 | CABLE LAYING / SALVAGING of Power XLPE Aluminum Cable Above 240 mm2 up to 300 mm2 | | 175 | Per Mtr. |
|---|
| 21 | 3.1 | TERMINATION & CABLE GLANDING up to 10mm2 | | 60 | No. |
|---|
| 22 | 3.11 | TERMINATION & CABLE GLANDING of Power XLPE Aluminum Cable above 10 mm2 up to 50 mm2 | | 10 | No. |
|---|
| 23 | 3.12 | TERMINATION & CABLE GLANDING of Power XLPE Aluminum Cable Above 50 mm2 up to 240 mm2 | | 15 | No. |
|---|
| 24 | 3.13 | TERMINATION & CABLE GLANDING of Power XLPE Aluminum Cable Above 240 mm2 up to 300 mm2 | | 5 | No. |
|---|
| 25 | 3.14 | STRAIGHT THROUGH JOINT OF CABLE up to 10 mm2 | | 75 | Per joint |
|---|
| 26 | 3.15 | STRAIGHT THROUGH JOINT OF CABLE above 10 mm2 to 240 mm2 | | 15 | Per joint |
|---|
| 27 | 3.16 | STRAIGHT THROUGH JOINT OF CABLE 240 mm2 to 300 mm2 | | 5 | Per joint |
|---|
| 28 | 4.01 | Attending the fault in the control panel of Oil cooled Suspended Magnets and motors of traveling trolley including replacement of defective components. | | 8 | One job / S.M. |
|---|
| 29 | 4.02 | Maintenance of Suspended Magnets which include cleaning of control panel, Transformers, Complete cleaning of S/M, Monorail, Checking and maintaining of oil level, maintenance of silica Jel etc. | | 8 | One job / S.M. |
|---|
| 30 | 4.03 | Maintenance of motorized trolley, Chain pulley which includes replacement of motors, bearings and other associated works | | 2 | One job / S.M. |
|---|
| 31 | 4.04 | Centrifuging of oil of Suspended magnets | | 1 | One job / S.M. |
|---|
| 32 | 5.01 | Maintenance/ overhauling of PF & TT slip ring assembly, electrical control panel and other associated work. | | 1 | Job |
|---|
| 33 | 5.02 | Fortnightly checking of electrical control panel of PF& TT, slip ring assembly, multi core flexible cable of slip ring assembly DE/DS system, sump pump and other control cable of panel. | | 24 | Job |
|---|
| 34 | 5.03 | Repairing of LDBs/Junction box locating in different places of CHP including fixing of doors, wielding of hinges of doors, repairing/ replacing of door lock system, replacement of burnt aluminum/copper bus bar re lugging and termination of cables and re commissioning. | | 15 | Job |
|---|