Sales : +91-777 804 8217
| Name of Work: Laying of pipe line in uncovered areas and scarcity pockets of ward No. 1 and 4 of Khalikote NAC under state Plan 2020-2021 | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Sinking of 10nos. Production well size 200 x 150mm. Through combination rig | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | LABOUR | BI01010001010000000000000515BI0100001113 | ||
| 3 | 1.02 | Drilling by Mud Rotary Rig | BI01010001010000000000000515BI0100001114 | ||
| 4 | 1.03 | Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level in alluvial soil strata by Mud Rotary Rig drilling as required to suit the site condition as per the direction of Engineer-in-Charge including use of own rigs with its accessories, tools and plant and consumables etc for lowering of finished bore suitable for lowering of 200 mm dia GI/PVC pipes for housing, fitted with socket and with or without well screen as per the necessity for the soft, medium, hard and boulder formation (GI/PVC casing pipes if required by the contractor to prevent collapse of over burden portion) including lower and withdrawing of casing pipe after drilling 200 mm to 450 mm dia in over burden portion. | BI01010001010000000000000515BI0100001115 | 330 | mtr |
| 5 | 1.04 | Supply of all labour & T&P for lowering the following size G.I./PVC pipes with or without slotted pipes as per the necessity from ground level and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and fixing all jointing materials etc. complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above excluding cost of fittings & jointing materials. | BI01010001010000000000000515BI0100001116 | ||
| 6 | 1.05 | Lowering of 200 PVC casing pipes ( Both slotted and normal ) | BI01010001010000000000000515BI0100001117 | 330 | mtr |
| 7 | 1.06 | Drilling by DTH Rig | BI01010001010000000000000515BI0100001118 | ||
| 8 | 1.07 | Labour for drilling a perfectly vertical bore holes of specified diameter for a specified depth below ground level through hard and boulder formation by means for Fast Drilling Sophisticated Rigs as required to suit the site condition as per the direction of Engineer-in-charge including deployment of rig with its accessories, T&P and consumables etc. for a finished bore suitable for lowering of 200x150 mm nominal dia PVC or GI casing pipes fitted with sockets and with or without well screens as per necessity for the soft and hard formations drilled by combination drilling method. | BI01010001010000000000000515BI0100001119 | 1170 | mtr |
| 9 | 1.08 | Cleaning and developing the tube well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of necessary equipment and labour as per direction of the Engineer - in - charge | BI01010001010000000000000515BI0100001120 | 10 | nos |
| 10 | 1.09 | 200mm dia PVC slotted Casing pipes ( ASTM-D-1785/04 Schedule - 80 ) | BI01010001010000000000000515BI0100001121 | 180 | mtr |
| 11 | 1.1 | 200mm dia PVC Casing pipe ( ASTM-D-1785/04 Schedule - 80 ) | BI01010001010000000000000515BI0100001122 | 160 | mtr |
| 12 | 1.11 | washed gravel (size P-6) | BI01010001010000000000000515BI0100001123 | 54.45 | cum |
| 13 | 1.12 | Bentonite powder | BI01010001010000000000000515BI0100001124 | 33 | Qtl |
| 14 | 1.13 | Design , drawing , Construction and commissioning of RCC UGR with piping arrangements upto 5mtr. from external face | BI01010001010000000000000515BI0100001125 | ||
| 15 | 1.14 | Stadium Hill top | BI01010001010000000000000515BI0100001126 | 100000 | lit. |
| 16 | 1.15 | Jagannath Vihar | BI01010001010000000000000515BI0100001127 | 230000 | lit. |
| 17 | 1.16 | Construction of 30000lit. Capacity RCC storage resorvoir at Kathagada and Phulajhara | BI01010001010000000000000515BI0100001128 | ||
| 18 | 1.17 | Supplying all labour and T&P for earth work in all kinds of soil within 50mtr initial lead and 1.5mtr initial lift including rough dressing and breaking of clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3mtr in depth as per direction of Engineer - in - charge | BI01010001010000000000000515BI0100001129 | 72.14 | Cum |
| 19 | 1.18 | Supplying allmaterials , labour and T&P for filling sand in F & P watered and rammed etc. all complete as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001130 | 4.01 | Cum |
| 20 | 1.19 | Supplying allmaterials , labour and T&P for providing PCC ( 1:3:6 ) with 4cm size HG metal in F & P etc. all complete as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001131 | 4.01 | Cum |
| 21 | 1.2 | Supplying allmaterials , labour and T&P for providing R.C.C. ( M - 25 ) with 20mm and downgrade size hard granite chips (CB) including hoisting and laying all complete as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001132 | 22.35 | Cum |
| 22 | 1.21 | Supplying all labour and T&P for cutting , bending , binding and tying ms rods and placing the grills in position including cost of steel and binding wire etc. all complete as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001133 | 17.88 | Qtl |
| 23 | 1.22 | Rigid and smooth steel centering and shuttering at all heights of bridge3 work such as well curb, well steingin,well cap, pier and abutment shaft, pier and abutment cap, wing wall, tie beam, road kerb and dirt wall using required nos of vertical and horizontal supports of scaffolding with joists, N.G. rails and channels and steel shuttering plates including welding, bolting, cost, conveyance, royalty and all other taxes of all materials and cost of scaffolding gang way etc. including cost of conveyance of dismantling and disposing debris clar of work site complete to receive reinforcement grills and concrete as per requirement as directed by Engineer-in-charge. | BI01010001010000000000000515BI0100001134 | 152.05 | sqm |
| 24 | 1.23 | Supplying all labour and T&P for 6 mm thick cement plaster (1:4) to R CC surfaces finished smooth including closed deep chiping and slury treatment as per specification and direction of EIC | BI01010001010000000000000515BI0100001135 | 82.53 | sqm |
| 25 | 1.24 | Supplying all labour, material T&P for providing weather seal coat 2 (two ) coats with any approved paint over one coat of primer etc. all complete including cost of paints and primer conveyances, and royalty of all materials to site as per PW specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001136 | ||
| 26 | 1.25 | Outside | BI01010001010000000000000515BI0100001137 | 22.39 | sqm |
| 27 | 1.26 | Supplying all labour and T&P for refilling the foundation trench with excavated earth including ramming as per direction of Engineer - in - charge | BI01010001010000000000000515BI0100001138 | 55.17 | Cum |
| 28 | 1.27 | Supplying all materials , labour, T&P for fitting and fixing the following specials as per PW specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001139 | ||
| 29 | 1.28 | 100 x 500mm Puddle Collar | BI01010001010000000000000515BI0100001140 | 2 | no |
| 30 | 1.29 | 100mm C.I. Sluice Valve ( PN - 1.6 ) | BI01010001010000000000000515BI0100001141 | 4 | nos |
| 31 | 1.3 | Carriage of extra earth within 5KM lead | BI01010001010000000000000515BI0100001142 | 16.96 | cum |
| 32 | 1.31 | Construction of pump chamber and Watchman shed at Jagannath Vihar and Phulajhara | BI01010001010000000000000515BI0100001143 | ||
| 33 | 1.32 | Supplying all labour and T&P for earth work in excavation of foundation trenches in all kinds of soil within initial lead and lift including rough dressing and leveling the bed etc. all complete as per specification and direction of EIC | BI01010001010000000000000515BI0100001144 | 29.77 | Cum |
| 34 | 1.33 | Supplying allmaterials , labour and T&P for filling sand in F & P watered and rammed etc. all complete as per specification and direction of EIC | BI01010001010000000000000515BI0100001145 | 17.06 | Cum |
| 35 | 1.34 | Supplying allmaterials , labour and T&P for providing PCC ( 1:4:8 ) with 4cm size HG metal in F & P etc. all complete as per specification and direction of EIC | BI01010001010000000000000515BI0100001146 | 5.98 | Cum |
| 36 | 1.35 | Supplying allmaterials , labour and T&P for providing RR Stone masonry work in cm ( 1:6 ) with HG stones in F & P etc. all complete as per specification and direction of EIC | BI01010001010000000000000515BI0100001147 | 19.95 | Cum |
| 37 | 1.36 | Supplying allmaterials , labour and T&P for providing Brick masonry in c.m. (1:6) in SS with FA Bricks having Crushing strength not less than 75kg/cm² etc. all complete as per specification and direction of EIC | BI01010001010000000000000515BI0100001148 | 21.02 | Cum |
| 38 | 1.37 | Supplying allmaterials , labour and T&P for providing R.C.C. ( 1 : 1½ : 3 ) with 12mm and downgrade size hard granite chips (CB) including hoisting and laying as per specification and direction of EIC | BI01010001010000000000000515BI0100001149 | 7.16 | Cum |
| 39 | 1.38 | Supplying all labour and T&P for cutting , bending , binding and tying ms rods and placing the grills in position including cost of steel and binding wire etc. all complete as per specification and direction of EIC | BI01010001010000000000000515BI0100001150 | 5.73 | Qtl |
| 40 | 1.39 | Supplying all labour and T&P for Rigid and smooth centering and shuttering for RCC works including false etc. all complete as per specification and direction of EIC | BI01010001010000000000000515BI0100001151 | ||
| 41 | 1.4 | Plinth bend | BI01010001010000000000000515BI0100001152 | 10.45 | sqm |
| 42 | 1.41 | Lintel | BI01010001010000000000000515BI0100001153 | 4.75 | sqm |
| 43 | 1.42 | Slab | BI01010001010000000000000515BI0100001154 | 50.18 | sqm |
| 44 | 1.43 | Fixing Vertified l floor tiles of premium grade having thickness 8mm to 10 mm confirming to IS: 13756 of size 60cm x 60cm( plain Ivory ) in floors or steps & landing on 25mm. thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing & polishing complete . | BI01010001010000000000000515BI0100001155 | 30.33 | sqm |
| 45 | 1.44 | Supplying all labour and T&P for fixing tiles (glazed tile) in dados skirting and risers of steps on 12mm. thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001156 | 11.7 | sqm |
| 46 | 1.45 | Supplying all labour and T&P for 12mm. thick C.P. in cement mortar (1:6) for brick work as per specification and direction of EIC | BI01010001010000000000000515BI0100001157 | 218.23 | sqm |
| 47 | 1.46 | Supplying all labour and T&P for finishing wals with two coats of water proofing cement paint as per specification and direction of EIC | BI01010001010000000000000515BI0100001158 | 261.81 | sqm |
| 48 | 1.47 | Supplying all fabrication materials, labour, T&P for fabricating, fitting and fixing MS sheet cover with angle iron frame (ISA 25 x 25 x 6mm. )for doors including a coat of primer and two coats of approved paint as per specification and direction of the EIC | BI01010001010000000000000515BI0100001159 | 370.8 | Kg |
| 49 | 1.48 | Providing fitting, fixing of AI door with OEL anodized AI door section of 9202 as verticl member, 9201 as topl member and 9200 as bottom and middle member and 6mm plain glass in top portion with 12mm thick pre-laminated board in bottom portion fixed on door frame by means of tapered clip No.4660 and the frame to be completed by means of jointing angle No.1855 including all cost of labour, T&P, hire charges of drilling machine, labour charges etc complete. as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001160 | ||
| 50 | 1.49 | Door | BI01010001010000000000000515BI0100001161 | 1.71 | sqm |
| 51 | 1.5 | Supplying, fitting, fixing up window (sliding type) made up aluminium Section 151-154, 151 - 155, as windows frame Section No.151-155, 151-153 and 151-167 as shutter frame with 5mm thick black glass as panel lfitted with rubber beading including locking arrangment including all fitting including cost of materials, alll taxes, labour, T&P etc. complete as per direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001162 | ||
| 52 | 1.51 | Window | BI01010001010000000000000515BI0100001163 | 1.62 | sqm |
| 53 | 1.52 | 300KG 9 mtr long PSC pole | BI01010001010000000000000515BI0100001164 | 2 | No |
| 54 | 1.53 | 11KV 'V' Cross Arm (10.20 Kg each) | BI01010001010000000000000515BI0100001165 | 2 | No |
| 55 | 1.54 | Top F Arm | BI01010001010000000000000515BI0100001166 | 2 | No |
| 56 | 1.55 | GI Back Clamp for V cross Arm(11KV)(0.85kgeach ) | BI01010001010000000000000515BI0100001167 | 2 | No |
| 57 | 1.56 | 11 k.v. h.w. Fitting ( T & C) 45 KN | BI01010001010000000000000515BI0100001168 | 3 | nos |
| 58 | 1.57 | 11KV Disc Insulator(T&C) Disc 45KN ( Polymer) | BI01010001010000000000000515BI0100001169 | 3 | Nos |
| 59 | 1.58 | 11KV Pin Insulator ( Polymer) | BI01010001010000000000000515BI0100001170 | 6 | Nos |
| 60 | 1.59 | Earthing of support ( Coil Type ) | BI01010001010000000000000515BI0100001171 | 2 | Nos |
| 61 | 1.6 | 55 mm2 AAA Conductor | BI01010001010000000000000515BI0100001172 | 0.09 | Km. |
| 62 | 1.61 | Concreting of support C.C - 1:3:6, using 40mm BHG metal size - 0.45mtr x 0.45mte x 1.5mtr =0.3037Cum. @ 4158.84 = 0.3037 x 4158.84 = 1263.03 or 1270.00\n | BI01010001010000000000000515BI0100001173 | 2 | No. |
| 63 | 1.62 | Couping with c.c 1:3:6 by using 12mm size hard broken granite chips = 0.3mtr x 0.3mtr x 0.45mte = 0.4405cum @ Rs. 4754.71 /cum = 0.405xRs.4754.51 = Rs. 192.57 or Rs. 193.00 | BI01010001010000000000000515BI0100001174 | 2 | Kg |
| 64 | 1.63 | G.I. Barbed wire anti climbing device 2kg. Per supportb, | BI01010001010000000000000515BI0100001175 | 4 | nos |
| 65 | 1.64 | 100 x 50 x 6mm MS channel 1no for taping point & 1no CP | BI01010001010000000000000515BI0100001176 | 27.6 | kg |
| 66 | 1.65 | Galvanisation of all MS materials | BI01010001010000000000000515BI0100001177 | 27.6 | kg |
| 67 | 1.66 | Guarding for road crossing | BI01010001010000000000000515BI0100001178 | 1 | No |
| 68 | 1.67 | HT Stay Set (complete) | BI01010001010000000000000515BI0100001179 | 1 | set |
| 69 | 1.68 | H.T. Stay Insulator | BI01010001010000000000000515BI0100001180 | 1 | no |
| 70 | 1.69 | HT Stay Clamp ( 1.95 kg/ Pair) | BI01010001010000000000000515BI0100001181 | 1 | pair |
| 71 | 1.7 | 7/10 SWG Stay Wire | BI01010001010000000000000515BI0100001182 | 10 | kg |
| 72 | 1.71 | Cement concreting for stay anchor plate with c.c 1:3:6 by using 4cmsize hard granite metal = 0.45mtr x 0.45mtr x 1.5mtr = 0.3037cum @ 4158.84 = 0.3037 x 4158.84 = 1263.03 or 1270.00 | BI01010001010000000000000515BI0100001183 | 1 | no |
| 73 | 1.72 | Sundries for survey , tree cutting, small size nut bolt, allm. Binding wire, tape & Danger Board 4 nos etc. | BI01010001010000000000000515BI0100001184 | 1 | ls |
| 74 | 1.73 | cost of material of PART - A | BI01010001010000000000000515BI0100001185 | ||
| 75 | 1.74 | PART-B (Installation of 1 x 25KVA 11/0.4KV S/s) | BI01010001010000000000000515BI0100001187 | ||
| 76 | 1.75 | 300KG 9mtr long PSC pole | BI01010001010000000000000515BI0100001188 | 2 | No |
| 77 | 1.76 | Pressure Channel 100 x 50 x 6mm channel (MS) channel each 2.8 mtr. Long( 9.2 K.g. per mtr.)x2 Nos | BI01010001010000000000000515BI0100001189 | 51.52 | K.g. |
| 78 | 1.77 | Transformer mounting channel 100 x 50 x 6mm channel (MS) channel each 2.8 mtr. Long( 9.2 K.g. per mtr.)x2 Nos | BI01010001010000000000000515BI0100001190 | 51.52 | K.g. |
| 79 | 1.78 | AB Swith & HG Fuse, Mounting Channel (GI)75x40x6 - 2.8 mtr. long, 4 nos.(6.8K.g. per mtr.) | BI01010001010000000000000515BI0100001191 | 76.16 | K.g. |
| 80 | 1.79 | Cantilever chhanel (GI) for supporting AB Switch arm, 75x40x6-1 mtr. Long, 2 nos.(6.8 K.g. per mtr.) | BI01010001010000000000000515BI0100001192 | 13.6 | K.g. |
| 81 | 1.8 | Transformer belting angle 50 x 50 x 6mm - 2.8 mtr. Long 2 Nos 4.5Kg/mtr. With side angle, total - 7mtr. | BI01010001010000000000000515BI0100001193 | 31.5 | K.g. |
| 82 | 1.81 | Angle for mounting LT distribution Box 50 x 50 x 6 mm MS Angel (GI) -2.5 mtrs.each Long 2 nos.( 4.5 K.g. per mtr.) | BI01010001010000000000000515BI0100001194 | 22.5 | K.g. |
| 83 | 1.82 | Galvanisation of all MS materials | BI01010001010000000000000515BI0100001195 | 246.8 | K.g. |
| 84 | 1.83 | 11KV AB Switch 3 Pole (200 Amp) | BI01010001010000000000000515BI0100001196 | 1 | Set |
| 85 | 1.84 | 11KV HG Fuse 3 Pole (200 Amp.) | BI01010001010000000000000515BI0100001197 | 1 | No. |
| 86 | 1.85 | 11 KV L.A. ( 9KV , 5KA ) | BI01010001010000000000000515BI0100001198 | 3 | No. |
| 87 | 1.86 | 11KV HW fittings ( B & S ) 70KN | BI01010001010000000000000515BI0100001199 | 3 | No. |
| 88 | 1.87 | 11KV Disc insulator ( B & S ) Disc 70KN ( Polymer ) | BI01010001010000000000000515BI0100001200 | 3 | No. |
| 89 | 1.88 | HT stay set complete | BI01010001010000000000000515BI0100001201 | 2 | set |
| 90 | 1.89 | HT insulator | BI01010001010000000000000515BI0100001202 | 2 | No. |
| 91 | 1.9 | HT stay clamp 1.95kg/pair | BI01010001010000000000000515BI0100001203 | 2 | pair |
| 92 | 1.91 | 7/10 SWG stay wire | BI01010001010000000000000515BI0100001204 | 20 | K.g. |
| 93 | 1.92 | GI pipe earthing 40mm dia. Medium gauge 3mtr. Long | BI01010001010000000000000515BI0100001205 | 5 | No. |
| 94 | 1.93 | Concreting for stay anchor plate with C.C - 1:3:6, using 40mm BHG metal size - 0.45mtr x 0.45mte x 1.5mtr =0.3037Cum. @ 4158.84 = 0.3037 x 4158.84 = 1263.03 or 1270.00\n | BI01010001010000000000000515BI0100001206 | 2 | No. |
| 95 | 1.94 | Concreting of support C.C - 1:3:6, using 40mm BHG metal size - 0.45mtr x 0.45mte x 1.5mtr =0.3037Cum. @ 4158.84 = 0.3037 x 4158.84 = 1263.03 or 1270.00\n | BI01010001010000000000000515BI0100001207 | 2 | No. |
| 96 | 1.95 | Couping with c.c 1:3:6 by using 12mm size hard broken granite chips = 0.3mtr x 0.3mtr x 0.45mte = 0.4405cum @ Rs. 4754.71 /cum = 0.405xRs.4754.51 = Rs. 192.57 or Rs. 193.00 | BI01010001010000000000000515BI0100001208 | 2 | Kg |
| 97 | 1.96 | Materials for Massionary work for Earth Pit,Charcoal, Salt etc including construction of earthing chamber (Size: 2\"x2\") and RCC slab cover | BI01010001010000000000000515BI0100001209 | 5 | No. |
| 98 | 1.97 | 25 x 4mm GI flat | BI01010001010000000000000515BI0100001210 | 30 | kg |
| 99 | 1.98 | 25 x 6mm GI flat for nutral | BI01010001010000000000000515BI0100001211 | 20 | kg |
| 100 | 1.99 | 55mm2 AAAC | BI01010001010000000000000515BI0100001212 | 0.04 | km |
| 101 | 2 | GI Nut , Bolt & Washer | BI01010001010000000000000515BI0100001213 | 25 | kg |
| 102 | 2.01 | 25 KVA, 11/0.4 kv (AL) Transformer BIS Energy Level - II | BI01010001010000000000000515BI0100001214 | 1 | No |
| 103 | 2.02 | L.T. Distribution box with MCCB, Aluminium Busbar for single Bay with kit kat fuse for 25 kva S/S | BI01010001010000000000000515BI0100001215 | 1 | No |
| 104 | 2.03 | 3 1/2 x 50mm2 PVC cable for 63 kva TFR | BI01010001010000000000000515BI0100001216 | 15 | Mtr. |
| 105 | 2.04 | Fencing of S/S ( Size 12' x 8' ) with | BI01010001010000000000000515BI0100001217 | ||
| 106 | 2.05 | 10nos. RCC 8' height barbed wire pillar | BI01010001010000000000000515BI0100001218 | ||
| 107 | 2.06 | GI 2ply 2.5mm. Dia. Barbed wire 76.20mtr. Long | BI01010001010000000000000515BI0100001219 | ||
| 108 | 2.07 | Fixing doubMS gate 1.50m. X 1.50m. Made up of 30 x 30x 6mm. Angle and 25 x 6mm. Flat including primer and enamel painting two coats | BI01010001010000000000000515BI0100001220 | 1 | No. |
| 109 | 2.08 | Metal spreading 2omm. - 40mm. CBHG metal 1.40cum. | BI01010001010000000000000515BI0100001221 | 1 | No. |
| 110 | 2.09 | Sundries for survey, pvc tape, ampire tape, Danger Board, small size nut & Bolt preparation of drawing etc | BI01010001010000000000000515BI0100001222 | 1 | LS |
| 111 | 2.1 | cost of material of PART - B | BI01010001010000000000000515BI0100001223 | ||
| 112 | 2.11 | PART-C (Construction of line DP - 2nos.) | BI01010001010000000000000515BI0100001224 | ||
| 113 | 2.12 | 300KG 9mtr long PSC pole | BI01010001010000000000000515BI0100001225 | 4 | No |
| 114 | 2.13 | 100 x 50 x 6mm channel (MS) channel each 4.5 mtr. Long( 9.2 K.g. per mtr.)x4 Nos | BI01010001010000000000000515BI0100001226 | 165.6 | K.g. |
| 115 | 2.14 | MS Channel 75x40x6 - 4.5 mtr. long, 4 nos.(6.8K.g. per mtr.) | BI01010001010000000000000515BI0100001227 | 122.4 | K.g. |
| 116 | 2.15 | MS Channel 50 x 50 x 6mm - 6.0 mtr. Long 4 Nos 4.45Kg/mtr. With side angle, total - 7mtr. | BI01010001010000000000000515BI0100001228 | 106.8 | K.g. |
| 117 | 2.16 | 100 x 50 x 6mm channel (MS) channel each 4.5 mtr. Long( 9.2 K.g. per mtr.)x4 Nos ( Long insulator mounting channel ) | BI01010001010000000000000515BI0100001229 | 165.6 | K.g. |
| 118 | 2.17 | 100 x 50 x 6mm channel (MS) channel each 1.5 mtr. Long( 9.2 K.g. per mtr.)x2 Nos (Cantilever channel for supporting isolator arm ) | BI01010001010000000000000515BI0100001230 | 55.2 | K.g. |
| 119 | 2.18 | 50 x 50 x 6mm angle for cantilever arrangement for isolator (MS) channel each 1.5 mtr. Long( 4.45K.g. per mtr.)x2 Nos | BI01010001010000000000000515BI0100001231 | 26.7 | K.g. |
| 120 | 2.19 | 75 x 40 x 6mm channel (MS) channel each 1.5 mtr. Long( 6.8 K.g. per mtr.)x1 No.s ( supporting isolator handle) | BI01010001010000000000000515BI0100001232 | 20.4 | K.g. |
| 121 | 2.2 | Galvanisation of all MS materials | BI01010001010000000000000515BI0100001233 | 666.7 | K.g. |
| 122 | 2.21 | Earthing support coil type | BI01010001010000000000000515BI0100001234 | 4 | nos |
| 123 | 2.22 | Clamp for bracing channel | BI01010001010000000000000515BI0100001235 | 8 | nos |
| 124 | 2.23 | 25 x 6mm. G.I. flat | BI01010001010000000000000515BI0100001236 | 90 | K.g. |
| 125 | 2.24 | Concreting with C.C - 1:3:6, using 40mm BHG metal size - 2' x 2' x 5'6\" | BI01010001010000000000000515BI0100001237 | 4 | No. |
| 126 | 2.25 | Concreting for stay anchor plate with C.C - 1:3:6, using 40mm BHG metal size - 0.45mtr x 0.45mte x 1.5mtr =0.3037Cum. @ 4158.84 = 0.3037 x 4158.84 = 1263.03 or 1270.00\n | BI01010001010000000000000515BI0100001238 | 4 | No. |
| 127 | 2.26 | Materials for Massionary work for Earth Pit,Charcoal, Salt etc including construction of earthing chamber (Size: 2\"x2\") and RCC slab cover | BI01010001010000000000000515BI0100001239 | 4 | nos |
| 128 | 2.27 | HT stay set complete | BI01010001010000000000000515BI0100001240 | 8 | set |
| 129 | 2.28 | HT insulator | BI01010001010000000000000515BI0100001241 | 8 | No. |
| 130 | 2.29 | HT stay clamp 1.95kg/pair | BI01010001010000000000000515BI0100001242 | 8 | pair |
| 131 | 2.3 | 7/10 SWG stay wire | BI01010001010000000000000515BI0100001243 | 80 | K.g. |
| 132 | 2.31 | G.I. nut bolt ,washer of different size | BI01010001010000000000000515BI0100001244 | 30 | K.g. |
| 133 | 2.32 | Sundries for survey, pvc tape, ampire tape, Danger Board, small size nut & Bolt preparation of drawing etc | BI01010001010000000000000515BI0100001245 | 1 | LS |
| 134 | 2.33 | PART-A (Three phase service connection) | BI01010001010000000000000515BI0100001246 | ||
| 135 | 2.34 | 35sq. Mm 3 1/2 core PVC Cable | BI01010001010000000000000515BI0100001247 | 20 | mtr. |
| 136 | 2.35 | No.6 GI wire | BI01010001010000000000000515BI0100001248 | 3 | Kg. |
| 137 | 2.36 | Nut & Bolt | BI01010001010000000000000515BI0100001249 | 5 | Kg. |
| 138 | 2.37 | 100 Amp. Kit Kat Fuse | BI01010001010000000000000515BI0100001250 | 3 | No |
| 139 | 2.38 | Sundries | BI01010001010000000000000515BI0100001251 | 1 | LS |
| 140 | 2.39 | 300KG 9 mtr long PSC pole | BI01010001010000000000000515BI0100001252 | 1 | No |
| 141 | 2.4 | 11KV 'V' Cross Arm (10.20 Kg each) | BI01010001010000000000000515BI0100001253 | 1 | No |
| 142 | 2.41 | Top F Arm | BI01010001010000000000000515BI0100001254 | 1 | No |
| 143 | 2.42 | GI Back Clamp for V cross Arm(11KV)(0.85kgeach ) | BI01010001010000000000000515BI0100001255 | 1 | No |
| 144 | 2.43 | Galvanisation of all MS materials | BI01010001010000000000000515BI0100001256 | 13.95 | kg |
| 145 | 2.44 | 11KV Pin Insulator ( Polymer) | BI01010001010000000000000515BI0100001257 | 3 | Nos |
| 146 | 2.45 | 3 x 50 + 1 x 35 + 1 x 16 mm² LT XLPE AB Cable | BI01010001010000000000000515BI0100001258 | 82 | mtr |
| 147 | 2.46 | Couping with c.c 1:3:6 by using 12mm size hard broken granite chips = 0.3mtr x 0.3mtr x 0.45mte = 0.4405cum @ Rs. 4754.71 /cum = 0.405xRs.4754.51 = Rs. 192.57 or Rs. 193.00 | BI01010001010000000000000515BI0100001259 | 1 | no |
| 148 | 2.47 | Suspension clamp \" I \" hook | BI01010001010000000000000515BI0100001260 | 1 | no |
| 149 | 2.48 | Dead end clamp \" I \" hook | BI01010001010000000000000515BI0100001261 | 2 | no |
| 150 | 2.49 | Piercing connector | BI01010001010000000000000515BI0100001262 | 1 | no |
| 151 | 2.5 | Neutral connector | BI01010001010000000000000515BI0100001263 | 1 | no |
| 152 | 2.51 | GI base plate 500 x 500 x 10mm. For PSC pole 20Kg. | BI01010001010000000000000515BI0100001264 | 1 | no |
| 153 | 2.52 | Earthing coil for support | BI01010001010000000000000515BI0100001265 | 1 | no |
| 154 | 2.53 | LT stay set complete | BI01010001010000000000000515BI0100001266 | 1 | set |
| 155 | 2.54 | Stay insulator | BI01010001010000000000000515BI0100001267 | 1 | no |
| 156 | 2.55 | Stay clamp | BI01010001010000000000000515BI0100001268 | 1 | pair |
| 157 | 2.56 | 7/12 GI stay wire | BI01010001010000000000000515BI0100001269 | 8 | Kg |
| 158 | 2.57 | Concreting for stay anchor plate with C.C - 1:3:6, using 40mm BHG metal size - 0.45mtr x 0.45mte x 1.5mtr =0.3037Cum. @ 3867 = 0.3037 x 3867.00 = 1160.10 or 1160.00\n | BI01010001010000000000000515BI0100001270 | 1 | No. |
| 159 | 2.58 | GI Nut , Bolt & Washer | BI01010001010000000000000515BI0100001271 | 1 | kg |
| 160 | 2.59 | Sundries | BI01010001010000000000000515BI0100001272 | 1 | No. |
| 161 | 2.6 | PART-A (Three phase service connection) | BI01010001010000000000000515BI0100001273 | ||
| 162 | 2.61 | 35sq. Mm 3 1/2 core PVC Cable | BI01010001010000000000000515BI0100001274 | 20 | mtr. |
| 163 | 2.62 | No.6 GI wire | BI01010001010000000000000515BI0100001275 | 3 | Kg. |
| 164 | 2.63 | Nut & Bolt | BI01010001010000000000000515BI0100001276 | 5 | Kg. |
| 165 | 2.64 | 100 Amp. Kit Kat Fuse | BI01010001010000000000000515BI0100001277 | 3 | No |
| 166 | 2.65 | Sundries | BI01010001010000000000000515BI0100001278 | 1 | LS |
| 167 | 2.66 | PART-A (Three phase service connection) | BI01010001010000000000000515BI0100001279 | ||
| 168 | 2.67 | 35sq. Mm 3 1/2 core PVC Cable | BI01010001010000000000000515BI0100001280 | 20 | mtr. |
| 169 | 2.68 | No.6 GI wire | BI01010001010000000000000515BI0100001281 | 3 | Kg. |
| 170 | 2.69 | Nut & Bolt | BI01010001010000000000000515BI0100001282 | 5 | Kg. |
| 171 | 2.7 | 100 Amp. Kit Kat Fuse | BI01010001010000000000000515BI0100001283 | 3 | No |
| 172 | 2.71 | Sundries | BI01010001010000000000000515BI0100001284 | 1 | LS |
| 173 | 2.72 | Pumping arrangements from Production wells | BI01010001010000000000000515BI0100001285 | ||
| 174 | 2.73 | Procurement , installation , lowering , testing and commissioning of vertical submersible pumpsets of reputed make ( KSB / CRI / TEXMO / KIRLOSKAR / CROMPTON ) of the following duty for new Production Wells | BI01010001010000000000000515BI0100001286 | ||
| 175 | 2.74 | ( Three phase pumpset , Head - 62m. , Q - 1.4lps ) 2HP | BI01010001010000000000000515BI0100001287 | 15 | sets |
| 176 | 2.75 | Procurement , installation , fixing on walls with testing and commissioning of threer phase Panel Board to run three phase 2HP Submersible Pumpset of reputed make ( BCH / SIEMENS / L & T / HAVELS ) as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001288 | 15 | nos |
| 177 | 2.76 | Installation of Pumpset | BI01010001010000000000000515BI0100001289 | 10 | sets |
| 178 | 2.77 | Supplying all lmaterials , labour T & P for fitting and fixing the following materials and accessories required for commissioning the Production well as per specification and direction of EIC | BI01010001010000000000000515BI0100001290 | ||
| 179 | 2.78 | 50mm HDPE pipe(PE - 63 , PN - 10) for riser pipe of pumpset | BI01010001010000000000000515BI0100001291 | 700 | mtr |
| 180 | 2.79 | 50mm HDPE pipe(PE - 63 , PN - 10) for horizontal laying including earth work | BI01010001010000000000000515BI0100001292 | 800 | mtr |
| 181 | 2.8 | 40mm ASTM pipe ( Sch. - 80) for horizontal laying | BI01010001010000000000000515BI0100001293 | 50 | mtr |
| 182 | 2.81 | 4.00 mm² submersible flat cable | BI01010001010000000000000515BI0100001294 | 245 | mtr |
| 183 | 2.82 | 40mm. SS nipple | BI01010001010000000000000515BI0100001295 | 20 | nos |
| 184 | 2.83 | 40mm. GM FW Valve | BI01010001010000000000000515BI0100001296 | 10 | nos |
| 185 | 2.84 | 40mm. GM NR Valve | BI01010001010000000000000515BI0100001297 | 10 | nos |
| 186 | 2.85 | 40mm. GI Bend | BI01010001010000000000000515BI0100001298 | 8 | nos |
| 187 | 2.86 | 40mm. X 6\"G.I. nipple | BI01010001010000000000000515BI0100001299 | 20 | nos |
| 188 | 2.87 | 40mm. GI Union | BI01010001010000000000000515BI0100001300 | 20 | nos |
| 189 | 2.88 | Steel nut bolt 3/8\" x 4\" long | BI01010001010000000000000515BI0100001301 | 40 | nos |
| 190 | 2.89 | Pumping arrangements from UGR at Jagannath Vihar , Kathagada and Phulajhara | BI01010001010000000000000515BI0100001302 | ||
| 191 | 2.9 | Procurement , installation , lowering , testing and commissioning of Openwell Horizontal pumpsets of reputed make ( KSB / CRI / TEXMO / KIRLOSKAR / CROMPTON ) ( Head - 30m. , Q - 785 lpm) 7.50HP | BI01010001010000000000000515BI0100001303 | 5 | sets |
| 192 | 2.91 | Procurement , installation , fixing on walls with testing and commissioning of threer phase Panel Board ( Star Delta ) to run three phase 7.50HP Submersible Pumpset of reputed make ( BCH / SIEMENS / L & T / HAVELS ) as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001304 | 5 | nos |
| 193 | 2.92 | Installation of Pumpset | BI01010001010000000000000515BI0100001305 | 5 | sets |
| 194 | 2.93 | Supplying all lmaterials , labour T & P for fitting and fixing the following materials and accessories required for commissioning the Production well as per specification and direction of EIC | BI01010001010000000000000515BI0100001306 | ||
| 195 | 2.94 | 50mm dia PVC ASTM Sch. 80 Pipe | BI01010001010000000000000515BI0100001307 | 100 | mtr |
| 196 | 2.95 | 4.00sq.mm. flat Submersible Cable | BI01010001010000000000000515BI0100001308 | 200 | mtr |
| 197 | 2.96 | 50mm dia GM NR Valve | BI01010001010000000000000515BI0100001309 | 1 | no |
| 198 | 2.97 | 50mm dia Brass Fullway Valve | BI01010001010000000000000515BI0100001310 | 1 | no |
| 199 | 2.98 | 50mm. G.I. Bend ( heavy ) | BI01010001010000000000000515BI0100001311 | 20 | nos |
| 200 | 2.99 | 50mm GI Union | BI01010001010000000000000515BI0100001312 | 20 | nos |
| 201 | 3 | 50mm GI Socket | BI01010001010000000000000515BI0100001313 | 40 | nos |
| 202 | 3.01 | 50mm GI Tee | BI01010001010000000000000515BI0100001314 | 20 | nos |
| 203 | 3.02 | 50mm GI Plug | BI01010001010000000000000515BI0100001315 | 20 | nos |
| 204 | 3.03 | 50mm GI Elbow | BI01010001010000000000000515BI0100001316 | 20 | nos |
| 205 | 3.04 | 50mm x 6\" GI nipple | BI01010001010000000000000515BI0100001317 | 20 | nos |
| 206 | 3.05 | LAYING OF PIPELINE IN UNCOVERED AREAS | BI01010001010000000000000515BI0100001318 | ||
| 207 | 3.06 | LABOUR | BI01010001010000000000000515BI0100001319 | ||
| 208 | 3.07 | Supplying all labour and T&P for cutting of the folllowing concrete road including making good to the damages as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001320 | ||
| 209 | 3.08 | Metal road | BI01010001010000000000000515BI0100001321 | 245 | cum |
| 210 | 3.09 | Concrete road | BI01010001010000000000000515BI0100001322 | 73.5 | cum |
| 211 | 3.1 | Asphalt road | BI01010001010000000000000515BI0100001323 | 0.3 | cum |
| 212 | 3.11 | Supplying all labour and T&P for punching PWD road / deposit to the department with encasing for crossing pipeline withoutdisturbing the sub - base including making good to the damages as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001324 | 100 | mtr |
| 213 | 3.12 | Supplying all labour and T&P for earth work in excavation of foundation trenches in all kinds of soil within initial lead and lift including rough dressing and leveling the bed etc. all complete as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001325 | 2205 | cum |
| 214 | 3.13 | Supplying all lmaterials , labour T & P for Laying in trenches Centrifugally Cast (Spun) Ductile Iron pressure, socket and spigot pipes Class K - 7 without cement mortar lining conforming to IS:8329 - 2000 of the following nominal diameter as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001326 | ||
| 215 | 3.14 | 100mm dia DI K - 7 pipe | BI01010001010000000000000515BI0100001327 | 4900 | mtr |
| 216 | 3.15 | Supplying all labour T & P for providing push on joints to DI pipes of the following nominal dia. including testing the joints as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001328 | ||
| 217 | 3.16 | 100mm. dia. Push on joints | BI01010001010000000000000515BI0100001329 | 980 | nos |
| 218 | 3.17 | Supplying all lmaterials , labour T & P for Laying in trenches D.I. specials conforming to IS:1538 - 1993 (Part-x) as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001330 | 31.1 | qtl |
| 219 | 3.18 | Supplying all materials , labour and T&P for cutting , fabricating , grinding , laying and testing of MS pipes and specials of the following nominal dia. Including fabrication , jointing with a coat of primer as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001331 | ||
| 220 | 3.19 | 114.3mm MS pipe 4.50mm. thick | BI01010001010000000000000515BI0100001332 | 220.5 | mtr |
| 221 | 3.2 | Flame cutting to MS pipes | BI01010001010000000000000515BI0100001333 | 34.65 | mtr |
| 222 | 3.21 | Fillet welding at site | BI01010001010000000000000515BI0100001334 | 34.57 | mtr |
| 223 | 3.22 | 100mm. MS flange | BI01010001010000000000000515BI0100001335 | 50 | nos |
| 224 | 3.23 | Supplying all lmaterials , labour T & P forproviding flanged joints to pipes and specialsincluding supply of rubber insertion and nut bolt of the following nominal dia. including testing the joints as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001336 | ||
| 225 | 3.24 | 100mm. dia. Flanged joints | BI01010001010000000000000515BI0100001337 | 54 | nos |
| 226 | 3.25 | 150mm. dia. Flanged joints | BI01010001010000000000000515BI0100001338 | 6 | nos |
| 227 | 3.26 | Supplying all lmaterials , labour T & P for Laying in trenches Sluice valves and Reflux valves conforming to (IS : 14846 - 2000) as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001339 | ||
| 228 | 3.27 | 150mm. dia. C.I. SV ( P.N. - 1.6 ) | BI01010001010000000000000515BI0100001340 | 2 | nos |
| 229 | 3.28 | 100mm. dia. C.I. SV ( P.N. - 1.6 ) | BI01010001010000000000000515BI0100001341 | 8 | nos |
| 230 | 3.29 | 100mm. dia. C.I. NRV ( 1.6 MPA ) | BI01010001010000000000000515BI0100001342 | 2 | nos |
| 231 | 3.3 | 25mm dia D.I. tamper proof Single Air Valve | BI01010001010000000000000515BI0100001343 | 2 | nos |
| 232 | 3.31 | Supplying all lmaterials , labour T & P for filling sand in F & P watered and rammed as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001344 | ||
| 233 | 3.32 | Concrete road | BI01010001010000000000000515BI0100001345 | 36.75 | cum |
| 234 | 3.33 | Supplying all materials , labour and T&P for providing CC ( 1 : 4 : 8 ) with 40mm size CBHG metal etc. all complete as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001346 | ||
| 235 | 3.34 | Concrete road | BI01010001010000000000000515BI0100001347 | 36.75 | cum |
| 236 | 3.35 | Supplying all materials , labour and T&P for providing CC ( 1 : 2 : 4 ) with 12mm size CBHG chips etc. all complete as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001348 | ||
| 237 | 3.36 | Concrete road | BI01010001010000000000000515BI0100001349 | 36.75 | cum |
| 238 | 3.37 | Supplying all materials , labour and T&P for construction of SV Chamber with FA brick and RCC slab as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001350 | ||
| 239 | 3.38 | SV Chamber of size 0.90 x 0.90 x 0.90m. | BI01010001010000000000000515BI0100001351 | 8 | nos |
| 240 | 3.39 | SV Chamber of size 1.20 x 1.20 x 1.20m. | BI01010001010000000000000515BI0100001352 | 1 | nos |
| 241 | 3.4 | SV Chamber of size 0.45 x 0.45 x 0.60m. | BI01010001010000000000000515BI0100001353 | 2 | nos |
| 242 | 3.41 | Supplying all labour and T&P for re filling the pipeline trench with excavated earth in all kinds of soil including laying in layers , watering and ramming as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001354 | 2056.25 | cum |
| 243 | 3.42 | Supplying all labour and T&P for carriage of extra earth by truck load from work site to a distance of 5km. as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001355 | 148.75 | cum |
| 244 | 3.43 | D.I. specials | BI01010001010000000000000515BI0100001356 | 31.1 | qtl |
| 245 | 3.44 | 150mm. dia. C.I. SV ( P.N. - 1.6 ) | BI01010001010000000000000515BI0100001357 | 2 | nos |
| 246 | 3.45 | 100mm. dia. C.I. SV ( P.N. - 1.6 ) | BI01010001010000000000000515BI0100001358 | 8 | nos |
| 247 | 3.46 | 100mm. dia. C.I. NRV ( 1.6 MPA ) | BI01010001010000000000000515BI0100001359 | 2 | nos |
| 248 | 3.47 | 25mm dia D.I. tamper proof Single Air Valve | BI01010001010000000000000515BI0100001360 | 2 | nos |
| 249 | 3.48 | Laying of 90mm. HDPE feeder line | BI01010001010000000000000515BI0100001361 | ||
| 250 | 3.49 | Supplying all labour and T&P forcutting of the folllowing concrete road including making good to the damages as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001362 | ||
| 251 | 3.5 | Metal road | BI01010001010000000000000515BI0100001363 | 45.96 | cum |
| 252 | 3.51 | Supplying all labour and T&P for earth work in excavation of foundation trenches in all kinds of soil within initial lead and lift including rough dressing and leveling the bed etc. all complete as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001364 | 204.7 | cum |
| 253 | 3.52 | Supplying all lmaterials , labour T & P for Laying in trenches High Density Polyethylene Pipes conforming to IS 4984 - 1995 and specials of following outside diameter and Class-4 to Class-5 and jointing by Fusion welding method including testing as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001365 | ||
| 254 | 3.53 | 90mm dia HDPE Pipes PN 8.0 | BI01010001010000000000000515BI0100001366 | 460 | mtr |
| 255 | 3.54 | Supplying all lmaterials , labour T & P for Laying in trenches Sluice valves and Reflux valves conforming to (IS : 14846 - 2000) as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001367 | ||
| 256 | 3.55 | 100mm. dia. C.I. SV ( P.N. - 1.6 ) | BI01010001010000000000000515BI0100001368 | 2 | nos |
| 257 | 3.56 | Supplying all labour and T&P for re filling the pipeline trench with excavated earth in all kinds of soil including laying in layers , watering and ramming as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001369 | 201.77 | cum |
| 258 | 3.57 | Internal Motor line and light point wiring of Pumphouse | BI01010001010000000000000515BI0100001370 | ||
| 259 | 3.58 | Supplying all materials labour , T & P for fitting and fixing the following electrical items for motor line ( for 3nos. - 2HP and 1no. - 7.50 three phase ) and light point wiring of Pump Chamber at Maradsisahi including cutting grooves and holes and making good to the damages with testing of the system as per specification and direction of Engineer - in - charge | BI01010001010000000000000515BI0100001371 | ||
| 260 | 3.59 | Kitkat 63Amp | BI01010001010000000000000515BI0100001372 | 9 | nos. |
| 261 | 3.6 | 63Amp Master Main switch | BI01010001010000000000000515BI0100001373 | 2 | nos. |
| 262 | 3.61 | 16Amp Master Main switch | BI01010001010000000000000515BI0100001374 | 4 | nos. |
| 263 | 3.62 | 63Amp Busbar 6way | BI01010001010000000000000515BI0100001375 | 2 | nos. |
| 264 | 3.63 | 4.0sq.mm. 4core PVC cable | BI01010001010000000000000515BI0100001376 | 75 | mtr |
| 265 | 3.64 | Material for masonary work for earth pit | BI01010001010000000000000515BI0100001377 | 4 | nos. |
| 266 | 3.65 | Charcoal , salt etc. | BI01010001010000000000000515BI0100001378 | 4 | nos. |
| 267 | 3.66 | 40mm. GI Pipe -2.5mtr. Long with one end flange welded | BI01010001010000000000000515BI0100001379 | 4 | nos. |
| 268 | 3.67 | 32AMP. Main Switch | BI01010001010000000000000515BI0100001380 | 2 | nos. |
| 269 | 3.68 | PVC insulated copper cable 2.50mm² | BI01010001010000000000000515BI0100001381 | 32 | mtr. |
| 270 | 3.69 | 3/16 Copper wire for light point wiring | BI01010001010000000000000515BI0100001382 | 36 | mtr. |
| 271 | 3.7 | Fibre Board 1' x 8\" | BI01010001010000000000000515BI0100001383 | 2 | nos |
| 272 | 3.71 | Fibre Board 4\" x 3\" | BI01010001010000000000000515BI0100001384 | 2 | nos |
| 273 | 3.72 | 15AMP. Switch | BI01010001010000000000000515BI0100001385 | 2 | nos |
| 274 | 3.73 | 5AMP. Switch | BI01010001010000000000000515BI0100001386 | 6 | nos |
| 275 | 3.74 | 5AMP. Plug | BI01010001010000000000000515BI0100001387 | 2 | nos |
| 276 | 3.75 | Holder | BI01010001010000000000000515BI0100001388 | 6 | nos |
| 277 | 3.76 | High speed ceiling Fan 18\" | BI01010001010000000000000515BI0100001389 | 2 | nos |
| 278 | 3.77 | Single phase preventor , Censor with timer and autocut arrangement and dry run protection | BI01010001010000000000000515BI0100001390 | 9 | nos |
| 279 | 3.78 | LED Bulb | BI01010001010000000000000515BI0100001391 | 6 | nos |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy