Dismantling, fabrication and erection boiler no-1 tubes. (a) Roof tubes size 3’’OD x 6 mtr
t2
21
Per tube
3
1.02
(b) side wall tubes 3’’ OD x 8 mtr
t3
38
Per tube
4
1.03
(c) Riser tubes 3” dia x 8 mtr
t4
6
Per tube
5
2.01
Reclamation of drum to drum tubes of boiler no-2 (a) size 2.1/2’’ OD
t5
444
Per tube
6
2.02
(b) size 3’’ OD
t6
105
Per tube
7
3
Dismantling and erection of Economizer coils \nsize 2’’OD of Boiler no. 3 WIL Make\n
t7
18
Per Coil
8
4
Dismantling and erection of Secondary super heater coils size 44.5 OD of Boiler no. 3 WIL Make
t8
16
Per Coil
9
5
Dismantling, and erection of air heater tubes 63.5 mm OD x 18 feet length
t9
480
Per tube
10
6
1. Qty. may very while placing the order.\n2. Supplier should be IBR & approved from Director Boiler Punjab.\n3. It is responsibility of supplier to take permission /passing of job work from Director Boiler Punjab. \n
t10
11
7
(Part-B)
t11
12
8
Fabrication of Economiser coils size 2’’OD of Boiler no. 3 WIL Make as per drawing no. 3BL-07643
t12
18
Per Coil
13
9
Fabrication of Secondary super heater coils size 44.5 OD of Boiler no. 3 WIL Make as per drawing no. 1BL- 03483
t13
16
Per Coil
14
10
Note:\n1. Transportation and material will be arranged by the mill.\n2. Supplier should be IBR & approved from Director Boiler.\n3. It is responsibility of supplier to take permission/passing of job work from Director Boiler\n
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.