Public Administrative Department Local Bodies Closing in 0 days TDR #27866913

Construction Work Of Funeral Site Located In Ward Ranilakshmibai Nagar Of Nagar Panchayat

Issued by Local Bodies · Executive Officer Nagar Panchayat Kabrai Mahoba, Uttar Pradesh
Tender Value
24.99 Lakhs
Estimated cost
Bid Submission
17 May 2021
0 days left
EMD
2.49 Lakhs
Bank guarantee accepted
Document Fee
2950
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Executive Officer Nagar Panchayat Kabrai Mahoba → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction work of funeral site located in Ward Ranilakshmibai Nagar of Nagar Panchayat

BOQ

Name of Work: ??? ?????? ???? ?? ????? ??????????????? ??? ??? ????? ????????????? ????? ?? ??????? ??????
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11samsan ghat Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches.BI01010001010000000000000515BI0100001113109.5cum
22Stone dust/local sand filling in plinth including supply of necessary quantity from the side of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants, etc. required for proper completion of the work. (as per S.I. No. 255)13.6cum
33Concrete with 4cm. (1½\") guage stone ballast, fine local sand of 1.25 F.M. and cement in proportion of 1;612 in foundations, including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I.No. 281)27.3cum
44R.C.C. work with cement approved coarse sand and 2cm. (3/4\") gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding s/o reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I. wire. An including necessary cantreing and shuttring etc. and also including supply of all material, labour T&P etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost.(as per S.I. No. 283)8.5cum
55Same as above but R.C.C. for slabs (S.I. No. 284)21.4cum
66Same as above but R.C.C. in the lighter beams i.e. having spans upto 6 m (20') (S.I. No. 285)4.3cum
77as in item no 283 above but in Rcc raft foundation and footing with 4 cm gauge approved stone ballast7.2cum
88As in item (283) above but in RCC columns in 1.1.5.3 (SI.No.289)7.7cum
99Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work.106.6cum
1010Mild steel of iron in plain work such as reinforced concrete /brick work (when not including in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. (as per S.I. No. 504)38.5Qtl
111112 mm thick plaster on with mix 1:4brick work minimum thickness not less than 10 mm with cement and find sand of 1.25 fineness modules. (as per S.I. No. 580)525.3sqm
1212Finishing walls with water proof cement paint or approved make and quality on new work with two coats to give an even shade including supply of all material, labour T&P etc. required for proper completion of the work. (as per S.I. No. 660)326.2sqm
1313One priming coat and two coat of oil distemper on new work including supply of all material, labour and T&P etc. required for proper completion of the work. (as per S.I. No. 649140sqm
1414Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in Super structure including supply of all materials, labour and tools and plants etc. Required for proper completion of the work.3.1cum
1515Earth work in cutting or in embankment in ordinary soil,excavtion to be it the from of regular pits not exceeding 1/2 meter (20'') in depth earth work in embankment to be in 20cm (8'') layers including 1.5meter (5ft) lifts and 30m (100ft) lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30m (100ft) distance as directed by the Engineer-in-charge.(S.I. NO. 253) 1 km .extra cartage983.6cum
1616Cement concrete with 2cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.11.2cum
1717Construction of B.W. Excavation in foundation in soil mix with gravel and boulderincluding lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches.86.6cum
1818Sand filling in plinth including supply of necessary quantity of coarse sand/Stone dust from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. (as per S.I. No. 255)8.4cum
1919Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 12 : 6 : 1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (as per S.I. No. 273)9.3cum
2020Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. (as per S.I. No. 303)6.7cum
2121Class -150 brick work in super stucture As in item (309) above but walls of one brick thick add for extra labour to the rate of item (309)54.1cum
2222RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in slab,lintel beam, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost.30.5cum
2323Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. (as per S.I. No. 504)24Qtl
242412mm thick plaster with cement and fine sand in 1:4 including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I.No. 584)547.2sqm
2525Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.547.2sqm
2626On Struction of Interlocking Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches.7.5cum
2727Earth work in filling with Material Obtained from Borrow Pits (Carted earth)\nConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical specification clause 301.537.5cum
2828Coarse sand filling in plinth including supply of necessary quantity of coarse sand/moorum from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. (as per S.I. No. 255)8.7cum
2929Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 12:6:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (as per S.I. No. 273)1.8cum
3030Granular Sub-base with Well Graded Material (Table 400.1) By Mix in Place Method (G.S.B.) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.11.2cum
3131Class-150 brick work in 1:4 cement and find sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. (as per S.I. No. 305)7.3cum
3232Providing and laying in cement concrete 4:2:1 (4 graded stone grit 20 mm nominal size : 2 sand : 1 cement) and curing complete including supply of all material, labour T&P etc. required for proper completion of the work as directed by Engineer-in-charge. (in 50mm & 25mm thick) (S.I. No. 279a)1.1cum
3333Interlocking Concrete Block Pavement Providing and laying of Rubble moulded Zig Zag Interlocking Concrete Block Payments having thikness 80mm as per drawing and technical specification clause 1504 {Chp-6 S.I. No. 6.7 (i)}150sqm
343412mm thick plaster with cement and fine sand in 1:4 including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I.No. 584)20sqm
3535Construction of Hand pUmp Including all cost of materials labour T& P etc.1jobs

AI Tender Summary

OUR REF NO 27866913
AUTHORITY Local Bodies
TENDER VALUE 24.99 Lakhs
LAST DATE 17-05-2021
Authority
Authority Name Nagar Panchayat
Work Description Construction work of funeral site located in Ward Ranilakshmibai Nagar of Nagar Panchayat
Basic Detail
Tender No 1088/NPK/NIVIDA SUCHANA/2021-22 Date 07-05-2021
Bidding Type Tender
Location
City Executive Officer Nagar Panchayat Kabrai Mahoba
State Uttar Pradesh
Key Dates
Publish Date 10 May 2021
Submission Date 17 May 2021
Open Date 18 May 2021
Finance
Tender Value 24.99 Lakhs
Tender Fee 2950
EMD 2.49 Lakhs
Exemption Not Available
Document List
BOQ_900400.xls
Tendernotice_1.pdf
8B234E89-5F34-43D8-8594-FAA984435180.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 10, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
May 17, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 18, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_900400.xls

pdf

Tendernotice_1.pdf

html

8B234E89-5F34-43D8-8594-FAA984435180.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender