| 1 | 1 | Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House at OGR/ESR site and construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as DI, UPVC,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of valve chamber, public stand post, individual house hold connection , storage tank,Laying of Infiltration gallary pipe line ( Both plain and slotted ), construction of CC prottection wall,construction of RCC cover for IW/OW,RCC step,Walk way bridge,Barbed wire fencing etc installation of submersible pump with motor in Intake well & OGR etc.(including supply of stand by pump motor), internal wiring of Pump house & installation of Servo Stabilizer etc. as per supplied Drawing in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and in (Annexure-A, B, C, D, E, F,G & H ) of Village ANDALPURI All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system . | BI01010001010000000000000515BI0100001113 | 1 | No |
|---|