Repair Of Port Main Engine Ins Sagardhwani , quote service charge for repair on port main engine of ins sagardhwani . , pick up and transportation of stock engine from mo kochi to man vadodara , fuel injection pump . remove all unit from engine dismantle , inspect and fit back . , fuel pump drive . remove all unit fuel pump drive , inspect bush and shaft , roller surface condition , renewed worn out parts , remove , dismantle , clean and inspect renew worn out parts fitment back . , inspect fuel linkages and replace bushes where required . lube oil pump . remove & overhaul pressure and scavenging pump , check operating condition . , combined water pump . remove combined water pump , overhaul renew seals , pressure test and box back , fuel injector . remove all unit fuel injectors , overhaul and pressure test . , cylinder head . dismantle , clean , inspect and overhaul , check combustion surface , hydro test of all unit cylinder test . , rocker arm lever . adjust valve clearance , check all unit bush and shaft condition , check roller and shaft condition for free and smooth rotation . , inlet/exhaust valve drive . remove all unit valve drive , inspect bush and shaft , roller surface condition , renewed worn out parts , visual inspection of all unit push rods . , big end bearing . remove all piston with connecting rod each engine , inspect big end bearing shell condition , if defective replace , main bearings and thrust bearings . remove bearing , inspect condition and replace . , piston ring . remove piston rings , inspect groove , measure piston ring clearance , record and boxed back . , cylinder liner . measure all unit cylinder liner bore . , cylinder liner honing - hone cylinder liners insitu with insitu honing machine , pull out cylinder liners in each engine , clean cooling surface , renew orings . , examine cam shaft drive gear for sign of wear . examine all rollers and cams for sign of wear and renew if requried , overhauling of starting air distributor . remove pilot lines and air starting lines to clear the inspec the lines . , air starting v/v . remove all unit air starting valve , dismantled , clean and inspect , overhaul and fitment back , renew worn out parts . , lube oil filter . renew filter elements . , air cooler . chemically clean the air cooler , hydro test at tube side . , exhaust system . clean manifold , visually check the expansion piece condition . , fuel filter . renew filter element . , overhaul of over speed trip and emergency stopping device . , overhaul main engine governor . , loop test of connection between new engine and existing control panel and field instrumentation , controls . calibrations of exhaust sensors , safety and alarm system . , basin trial and sea trials . , other checks on engine frame , crankshaft & vibration damper , vibration damper inspection - check condition of spring pack and replace where required . , remove flywheel , check bolts , ream bolt holes if requried , remove engine frame and check mating surface , remove crankshaft and check trueness and dimension of crankpins and main journal , inspection of bed plate and oil pan , check main bearing pockets for ovality and center line alignement , dp test / cracktest critical areas in engine frame , bedplate , check condition of tie rod , polishing of crankshaft pins & journals , cleaning of cooling water spaces; derusting and minor cold repair where required . , cleaning fo and lo lines , painting engine components & block , pick up and transportation of stock engine from man vadodara to kochi nsry / csl , repair based on condition , line boring of main bearing pockets and skimming of bearing caps - if requried . , liner landing surface on block - repair