Public Administrative Department Local Bodies Closing in 0 days TDR #27853121

Providing Rates Of Diesel Based Shavdahini For Municipal Council Washim Providing Rates Of Diesel Based Shavdahini For Municipal Council Washim , Cremation Furnace : Inclusions:M.S. Fabricated Furnace Structure Having Stainless Steel Front Sturcture, St

Issued by Local Bodies · washim, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 May 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
washim → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Providing Rates Of Diesel Based Shavdahini For Municipal Council Washim Providing Rates Of Diesel Based Shavdahini For Municipal Council Washim , Cremation Furnace : Inclusions:M.S. Fabricated Furnace Structure Having Stainless Steel Front Sturcture, Stainless Steel Main Door ( Manual Mechanism ) , M.S Trolley System With Stainless Steel Fork For Lifting, Refractory Lining, Control Panel, Stainless Steel Dead Body Supports, Installation Of Gas Burners-2 Nos. Gas Train, Pressure Regulating Valve, Shut-Off Valve, By-Pass System, Temperature Controller, Temperature Sensor, Main On-Off Valve, Requaird Pressure Gauge, Necessary Piping For Gas Line Etc. Technical Specifications As Below : • Warkingchamber Size : 1Mt. ( W ) X 1Mt. ( H ) X205mt ( 1 ) Approx. • Loading Of The Furnace : Semi Hydraulik Trolley • Maximum Temperature : 1050 Deg. C. • Operating Temperature: 550-700 Deg . C. • Burnesr : Fully Automatic ( Warmetechnologe Make ) 2 Nos. • Gas Train : Gastrain Consisting Of Nan–Return Valve, Pressure Reducing Valve, Safety Valve And Other Safety Accessories. • Insulation :Highly Efficient Insulation Of Proper Thickness Shall Be Provided In Order To Operate The Furnace With Minimum Gas Consumption. • Door : Opening / Closingis Manual. • Air / Gas Line : All The Air And Gas Lines Will Be Flange Mounted And Welded. • Control Panel Shall Consist Of Following Major Items : Supply On / Off Switch, Digital Temperature Controller With Back-Up Control, Motor Starter, Ampere Meter, Fuses, Indicating Lamps , Flame Monitor, Change Over Switch, Mccb Etc. , Gas Monifold: ( Only For Lpg ) / Diesel Storage: ( Fro Diseal Only ) 40 Nos. Gas Cylinders Manifold ( 20+20 ) / Diesel Storge Tank 300 Liters; ( Gas Cylinders / Diesel In Your Scope Of Supply ) ( Commercial Lpg Cylinder ) Non Returns Valves, Ball Valves, Pressure Regulating Valves, Gas / Diesel Filters, Pressure Gauges, Cylinderregulators With Hose Pipe, Main On / Off Valve, Interconnecting Pipe Line ( Flanged Fitted ) Etc. , Technicalspecifications Of Wet Scrubber Wetscrubber Is Specially Designed To Take Load Ofmaximum Of 6 Nos. Cremations In A Day Moc: Wet Scrubber Structure – S.S.; Suction Blower –S.S.; Hi Pressure Air Blower-S.S. 1: Condenses The Smoke Through High-Pressure Cold Air So The Heavy Ash Particles Gets Settle Down In The Chamber And Gases Pass Through Second Stage. 2: Washes The Smoke Through High-Pressure Water Sprinkled Over It And Goes To Third Stage. 3: Excess Carbon Particles Mix With Water And Hot Gases Released Through Chimney. , Technicalspecifications Of Chimney: ( For 30.50.Mt. / 100 Feet Height ) 1. 355Mm Dia.X 6Mm Thick X 20Ft Length Ms Pipe ( 50Ft ) 2. 355Mm Dia. X 8Mm Thick X20ft Length Ms Pipe ( 40Ft ) 3. Ms Cone 900 Mm Base Dia. X 3000Mm Height X 10Mm Thick 4. 1200Mm X 1200Mm X 16Mm Thick Bottom Flange, Double Breast Type. 5. Flanges 355Mm ( I.D ) X 25Mm Thick 6. 22Mm Dia. Half Thread High Tension Nut / Bots With One Spring Washer & Two Plain Washer. 7. Earthing. Red Light Flasher. 8. Foundation Bolts / Nuts 35Mmdia. X 1500M Long 9. Steel Core Wire Rope 10Mm Dia. ( Usha Martin Make ) , Supply, Installation And Commissioning Of Dg Set For Back-Up ( 15 Kva )

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 10-May-2021 Corrigendum Date 14-May-2021

BOQ

Name of Work:rates invited for Diseal Based Crematorium at washim city
Sl. No. Item Description
1CREMATION FURNACE :Inclusions:M.S. Fabricated furnace structure having stainless steel front sturcture, stainless steel main door (manual mechanism), M.S trolley system with stainless steel fork for lifting, refractory lining, control panel, stainless steel dead body supports, installation of gas burners-2 nos. gas train, pressure regulating valve, shut-off valve, by-pass system, temperature controller,temperature sensor, main On-Off valve, requaird pressure gauge, necessary piping for gas line etc.Technical specifications as below :• Warkingchamber size : 1mt. (w) x 1mt. (h)x205mt(1) approx.• Loading of the furnace : semi hydraulik trolley • Maximum temperature : 1050 deg. C. • Operating temperature: 550-700 deg . c. • Burnesr : fully automatic (warmetechnologe make ) 2 Nos. • Gas train : Gastrain consisting of nan–return valve, pressure reducing valve, safety valve and other safety accessories. • Insulation :highly efficient insulation of proper thickness shall be provided in order to operate the furnace with minimum gas consumption. • Door : Opening /closingis manual. • Air / Gas Line : all the air and gas lines will be flange mounted and welded. • Control panel shall consist of following major items : supply on/off switch, digital temperature controller with back-up control, motor starter, ampere meter,fuses, indicating lamps , flame monitor,change over switch, MCCB etc.
2Gas Monifold: (ONLY FOR LPG)/ DIESEL STORAGE: (Fro Diseal Only) 40 NOS. Gas Cylinders manifold (20+20)/ diesel storge tank 300 liters;( gas cylinders / diesel in your scope of supply ) (commercial LPG cylinder) non returns valves, ball valves, pressure regulating valves, Gas / diesel filters, pressure gauges, cylinderregulators with hose pipe, main On/Off valve, interconnecting pipe line (flanged fitted) etc.
3TECHNICALSPECIFICATIONS OF WET SCRUBBER Wetscrubber is specially designed to take load ofmaximum of 6 nos. cremations in a day MOC: wet scrubber structure – S.S.; suction blower –S.S.; Hi pressure Air blower-S.S. 1: condenses the smoke through high-pressure cold air so the heavy ash particles gets settle down in the chamber and gases pass through second stage. 2: Washes the smoke through high-pressure water sprinkled over it and goes to third stage. 3: Excess carbon particles mix with water and hot gases released through chimney.
4TECHNICALSPECIFICATIONS OF CHIMNEY: (For 30.50.Mt./100 feet height ) 1. 355mm Dia.X 6mm thick X 20ft Length MS Pipe (50ft) 2. 355mm Dia. X 8mm thick X20ft Length MS Pipe (40ft) 3. MS Cone 900 mm Base Dia. X 3000mm Height X 10mm thick 4. 1200mm x 1200mm X 16mm thick bottom flange, Double breast type. 5. Flanges 355mm (I.D) X 25mm thick 6. 22mm Dia. Half thread high tension Nut/bots with one spring washer & two plain washer.7. Earthing. Red light flasher.8. Foundation Bolts/nuts 35mmDia. X 1500m long 9. Steel core wire rope 10mm Dia. (Usha Martin Make )
5Supply, installation and commissioning of DG set for Back-up (15 KVA)

AI Tender Summary

OUR REF NO 27853121
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 14-05-2021
Authority
Authority Name Directorate Of Municipal Administration
Work Description Providing Rates Of Diesel Based Shavdahini For Municipal Council Washim Providing Rates Of Diesel Based Shavdahini For Municipal Council Washim , Cremation Furnace : Inclusions:M.S. Fabricated Furnace Structure Having Stainless Steel Front Sturcture, Stainless Steel Main Door ( Manual Mechanism ) , M.S Trolley System With Stainless Steel Fork For Lifting, Refractory Lining, Control Panel, Stainless Steel Dead Body Supports, Installation Of Gas Burners-2 Nos. Gas Train, Pressure Regulating Valve, Shut-Off Valve, By-Pass System, Temperature Controller, Temperature Sensor, Main On-Off Valve, Requaird Pressure Gauge, Necessary Piping For Gas Line Etc. Technical Specifications As Below : • Warkingchamber Size : 1Mt. ( W ) X 1Mt. ( H ) X205mt ( 1 ) Approx. • Loading Of The Furnace : Semi Hydraulik Trolley • Maximum Temperature : 1050 Deg. C. • Operating Temperature: 550-700 Deg . C. • Burnesr : Fully Automatic ( Warmetechnologe Make ) 2 Nos. • Gas Train : Gastrain Consisting Of Nan–Return Valve, Pressure Reducing Valve, Safety Valve And Other Safety Accessories. • Insulation :Highly Efficient Insulation Of Proper Thickness Shall Be Provided In Order To Operate The Furnace With Minimum Gas Consumption. • Door : Opening / Closingis Manual. • Air / Gas Line : All The Air And Gas Lines Will Be Flange Mounted And Welded. • Control Panel Shall Consist Of Following Major Items : Supply On / Off Switch, Digital Temperature Controller With Back-Up Control, Motor Starter, Ampere Meter, Fuses, Indicating Lamps , Flame Monitor, Change Over Switch, Mccb Etc. , Gas Monifold: ( Only For Lpg ) / Diesel Storage: ( Fro Diseal Only ) 40 Nos. Gas Cylinders Manifold ( 20+20 ) / Diesel Storge Tank 300 Liters; ( Gas Cylinders / Diesel In Your Scope Of Supply ) ( Commercial Lpg Cylinder ) Non Returns Valves, Ball Valves, Pressure Regulating Valves, Gas / Diesel Filters, Pressure Gauges, Cylinderregulators With Hose Pipe, Main On / Off Valve, Interconnecting Pipe Line ( Flanged Fitted ) Etc. , Technicalspecifications Of Wet Scrubber Wetscrubber Is Specially Designed To Take Load Ofmaximum Of 6 Nos. Cremations In A Day Moc: Wet Scrubber Structure – S.S.; Suction Blower –S.S.; Hi Pressure Air Blower-S.S. 1: Condenses The Smoke Through High-Pressure Cold Air So The Heavy Ash Particles Gets Settle Down In The Chamber And Gases Pass Through Second Stage. 2: Washes The Smoke Through High-Pressure Water Sprinkled Over It And Goes To Third Stage. 3: Excess Carbon Particles Mix With Water And Hot Gases Released Through Chimney. , Technicalspecifications Of Chimney: ( For 30.50.Mt. / 100 Feet Height ) 1. 355Mm Dia.X 6Mm Thick X 20Ft Length Ms Pipe ( 50Ft ) 2. 355Mm Dia. X 8Mm Thick X20ft Length Ms Pipe ( 40Ft ) 3. Ms Cone 900 Mm Base Dia. X 3000Mm Height X 10Mm Thick 4. 1200Mm X 1200Mm X 16Mm Thick Bottom Flange, Double Breast Type. 5. Flanges 355Mm ( I.D ) X 25Mm Thick 6. 22Mm Dia. Half Thread High Tension Nut / Bots With One Spring Washer & Two Plain Washer. 7. Earthing. Red Light Flasher. 8. Foundation Bolts / Nuts 35Mmdia. X 1500M Long 9. Steel Core Wire Rope 10Mm Dia. ( Usha Martin Make ) , Supply, Installation And Commissioning Of Dg Set For Back-Up ( 15 Kva )
Basic Detail
Tender No mcw/co/etender/2021/1
Bidding Type Tender
Location
City washim
State Maharashtra
Key Dates
Publish Date 10 May 2021
Submission Date 14 May 2021
Open Date 15 May 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
64fdfb04-2c9b-4d9a-b06a-17aff74e60d0.html
BOQ_1181821.xls
tdocu.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 10, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
May 14, 2021
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 14, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 15, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

64fdfb04-2c9b-4d9a-b06a-17aff74e60d0.html

xls

BOQ_1181821.xls

pdf

tdocu.pdf

pdf

Tendernotice_1.pdf

TenderDetail
Loading tenders