Inspection Of Turbine Rotor Assembly Of Lp Air Compressor ( 726-Kt-101 ) And Wgc Lube Oil Pump Turbine ( 701-Lopt-201 ) Of Bxp Unit , Barauni Refinery . , Barauni Refinery-Bihar

Indian Oil Corporation Limited-IOCL has published Inspection Of Turbine Rotor Assembly Of Lp Air Compressor ( 726-Kt-101 ) And Wgc Lube Oil Pump Turbine ( 701-Lopt-201 ) Of Bxp Unit , Barauni Refinery . . Submission Date for this Tender is 14-06-2021. Air Compressor Tenders in Barauni Refinery Bihar. Bidders can get complete Tender details and download the document.




Tender Notice

27843407
Corrigendum : Inspection Of Turbine Rotor Assembly Of Lp Air Compressor ( 726-Kt-101 ) And Wgc Lube Oil Pump Turbine ( 701-Lopt-201 ) Of Bxp Unit , Barauni Refinery .
Open Tender
Indian
Bihar
Barauni Refinery
14-06-2021

Tender Details

Inspection Of Turbine Rotor Assembly Of Lp Air Compressor ( 726-Kt-101 ) And Wgc Lube Oil Pump Turbine ( 701-Lopt-201 ) Of Bxp Unit , Barauni Refinery .

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 22-May-2021 Extension of due date Date 04-06-2021
2 07-Jun-2021 Extension of due date . . Date 14-06-2021

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work : Inspection of Turbine Rotor assembly of LP Air Compressor (726-KT-101) and WGC Lube Oil Pump Turbine (701-LOPT-201) of BXP Unit, Barauni Refinery.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Inspection for 726-KT-101 Turbine Rotor 1
2 1.01 Inspection of SRU 726-KT-101 Turbine Rotor:\n1. Receive the rotor & unload the rotor at vendor's workshop.\n2. Unpack from rotor Box & receiving inspection of rotor.\n3. Water jet cleaning and Grit blasting of the Rotor, if required.\n4. Visual Inspection AND PHOTOGRAPH of the rotor.\n5. Remove the rusty position of shaft by hand for detail inspection.\n6. Remove all preservative from rotor using solvent cleaning only.\n7. Air cleaning and Cleaning of the sensitive areas such as Journal, Seal, Thrust Collar etc.\n8. Dimension & Concentricity check for rotor\n9. Magnetic Particle Inspection for rotor.\n10. Demagnetizing of rotor.\n11. Gauss check of the rotor to below 5 gauss.\n12. Axial and Radial run-out Check of the Rotor.\n13. Furnish report of Initial Inspection.\n14. Low Speed Balance Check as per Elliott standards and Record (If\nconditions of journal areas are good).\nb) OTHER TERMS & CONDITIONS:\n1. The vendor shall be responsible to complete the entire work as per\nschedule of rates and specifications in all respects. Any additional work identified during inspection, as mutually agreed between IOCL and Elliott, shall attract additional price and lead time. Same shall be informed by M/s Elliott to IOCL for Joint Inspection post which Elliott shall submit proposal for additional\nscope of work (if required).\n2. Vendor to start the job immediately just after receipt of rotors at their works and try to complete the job in earliest possible time.\n3. Rotor will be dispatched in the same container as provided by IOCL.\n(c) Submission of following reports by vendor:\n1. Initial Concentricity check report\n2. Initial Dimension check report\n3. Initial Magnetic particle examination report\n4. Initial Low speed balance check report.\nIOCL scope :\n1. Rotor will be sent in well packed condition before shipment.\n2. Loading/Unloading of all rotors at IOCL, BR site.\n3. To & fro transportation including transit insurance for rotor 1 1 LS
3 1.02 Inspection of RFCC 701-LOPT-201 Turbine Rotor:\n1. Receive the rotor & unload the rotor at vendor's workshop.\n2. Unpack from rotor Box & receiving inspection of rotor.\n3. Water jet cleaning and Grit blasting of the Rotor, if required.\n4. Visual Inspection AND PHOTOGRAPH of the rotor.\n5. Remove the rusty position of shaft by hand for detail inspection.\n6. Remove all preservative from rotor using solvent cleaning only.\n7. Air cleaning and Cleaning of the sensitive areas such as Journal, Seal, Thrust Collar etc.\n8. Dimension & Concentricity check for rotor\n9. Magnetic Particle Inspection for rotor.\n10. Demagnetizing of rotor.\n11. Gauss check of the rotor to below 5 gauss.\n12. Axial and Radial run-out Check of the Rotor.\n13. Furnish report of Initial Inspection.\n14. Low Speed Balance Check as per Elliott standards and Record (If\nconditions of journal areas are good).\nb) OTHER TERMS & CONDITIONS:\n1. The vendor shall be responsible to complete the entire work as per\nschedule of rates and specifications in all respects. Any additional work identified during inspection, as mutually agreed between IOCL and Elliott, shall attract additional price and lead time. Same shall be informed by M/s Elliott to IOCL for Joint Inspection post which Elliott shall submit proposal for additional\nscope of work (if required).\n2. Vendor to start the job immediately just after receipt of rotors at their works and try to complete the job in earliest possible time.\n3. Rotor will be dispatched in the same container as provided by IOCL.\n(c) Submission of following reports by vendor:\n1. Initial Concentricity check report\n2. Initial Dimension check report\n3. Initial Magnetic particle examination report\n4. Initial Low speed balance check report.\nIOCL scope :\n1. Rotor will be sent in well packed condition before shipment.\n2. Loading/Unloading of all rotors at IOCL, BR site.\n3. To & fro transportation including transit insurance for rotor 2 1 EA
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail