Tender For Providing Supply Of Power To Lwss Of Jal Shakti Vibhag From Machada Khad To Khaneuli Group Of Village In Gram Panchyat Devnagar Under Electrical Section Bahli Under Esd Hpsebl Taklech .
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 May 2021
0 days left
EMD
45000
Bank guarantee accepted
Document Fee
2240
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Taklech → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Providing Supply Of Power To Lwss Of Jal Shakti Vibhag From Machada Khad To Khaneuli Group Of Village In Gram Panchyat Devnagar Under Electrical Section Bahli Under Esd Hpsebl Taklech .
BOQ
| Name of Work: Tender fort providing supply of power to LWSS of Jal Shakti Vibhag from Machada Khad to Khaneuli group of village in Gram Panchyat Devnagar under electrical section Bahli under ESD HPSEBL Taklech. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Erection Part of HT Line | BI01010001010000000000000515BI0100001114 | ||
| 2 | 2 | Erection Steel tubularPole 11mtr. Long . | BI01010001010000000000000515BI0100001116 | 23 | Nos. |
| 3 | 3 | Providing / Erection RCC muff. | BI01010001010000000000000515BI0100001118 | 23 | Nos. |
| 4 | 4 | Providing / Erection M.S. X-arm (2800x100x50x600mm) mtr.long. | BI01010001010000000000000515BI0100001120 | 24 | Set. |
| 5 | 5 | Providing / Erection M.S. X-bracing set. | BI01010001010000000000000515BI0100001122 | 12 | Set |
| 6 | 6 | Providing / Erection Stay set complete. | BI01010001010000000000000515BI0100001124 | 36 | Set. |
| 7 | 7 | Providing / Erection Stay wire 7/3.15mm @ 10 Kg per set. | BI01010001010000000000000515BI0100001126 | 360 | Kg. |
| 8 | 8 | Providing / Erection 22KV disc insulator. | BI01010001010000000000000515BI0100001128 | 45 | Set. |
| 9 | 9 | Providing / Erection 22KV pin insulator. | BI01010001010000000000000515BI0100001130 | 25 | Nos. |
| 10 | 10 | Providing / Erection GO switch | BI01010001010000000000000515BI0100001132 | 2 | Set. |
| 11 | 11 | Providing / Erection Eye hook. | BI01010001010000000000000515BI0100001134 | 36 | Nos. |
| 12 | 12 | Providing / Erection Egg. Insulator. | BI01010001010000000000000515BI0100001136 | 65 | Nos. |
| 13 | 13 | Providing / Erection M.S. nuts & bolts off size. | BI01010001010000000000000515BI0100001138 | 80 | Kg. |
| 14 | 14 | Providing / Erection Bend Stapple | BI01010001010000000000000515BI0100001140 | 24 | Set |
| 15 | 15 | Providing / Erection Line Stapple | BI01010001010000000000000515BI0100001142 | 24 | Set |
| 16 | 16 | Providing / Erection Aluminum paint. | BI01010001010000000000000515BI0100001144 | 23 | Ltr. |
| 17 | 17 | Erection ACSR conductor 6/1/3.35mm². | BI01010001010000000000000515BI0100001146 | 5871 | Mtr. |
| 18 | 18 | Providing / Erection G.I. wire 8 SWG. | BI01010001010000000000000515BI0100001148 | 200 | Kg. |
| 19 | 19 | Manual Carriage of HT line material up to site of \nwork average distance 2.00 KM | BI01010001010000000000000515BI0100001150 | 1.9 | KM |
| 20 | 20 | LT LINE | BI01010001010000000000000515BI0100001152 | ||
| 21 | 21 | Erection Steel tubular pole 9 mtr. long. | BI01010001010000000000000515BI0100001154 | 5 | Nos. |
| 22 | 22 | Providing / Erection RCC muff. | BI01010001010000000000000515BI0100001156 | 5 | Nos. |
| 23 | 23 | Erection ACSR conductor 6/1/2.59mm. | BI01010001010000000000000515BI0100001158 | 1236 | Mtr. |
| 24 | 24 | Providing / Erection Shackle insulator with D-iron. | BI01010001010000000000000515BI0100001160 | 24 | Nos. |
| 25 | 25 | Providing / Erection LT stay set. | BI01010001010000000000000515BI0100001162 | 5 | Nos. |
| 26 | 26 | Providing / Erection Stay wire 7/3.15mm@ 6kg per set | 30 | Kg. | |
| 27 | 27 | Providing / Erection Egg insutlator. | 5 | Nos. | |
| 28 | 28 | Providing / Erection Eye hook. | 6 | Nos. | |
| 29 | 29 | Providing / Erection Aluminum paint. | 5 | Ltr. | |
| 30 | 30 | Providing / Erection M.S. nuts & bolts off size. | 10 | Kg. | |
| 31 | 31 | Providing / Erection M.S. GI wire 8SWG | 32 | Kg. | |
| 32 | 32 | Manual Carriage of LT line material up to site of \nwork average distance 2.70 KM | 0.3 | Km | |
| 33 | 33 | SUB-STATION | |||
| 34 | 34 | Erection Steel tubular pole 11mtr. Long. | 2 | Nos. | |
| 35 | 35 | Providing / Erection RCC muff. | 2 | Nos. | |
| 36 | 36 | Providing / Erection C.I. (3000X100X50) mm for X-arm transformer \nbase main channel. | 4 | Nos. | |
| 37 | 37 | Providing / Erection C.I. (700X100X50x6) mm for supporting main channel of transformer. | 5 | Nos. | |
| 38 | 38 | Transformer belting | |||
| 39 | 39 | Providing / i) Angle iron for (460x50x50)mm. for transformer belt with clamp. | 2 | Nos. | |
| 40 | 40 | Providing / Erection C.I. (3000X75X40)mm for fuse unit GO switch and DO fuse. | 4 | Nos. | |
| 41 | 41 | Providing / Erection A.I. X-arm (3000X50X50)mm\n lighting arrestor. | 2 | Nos. | |
| 42 | 42 | Providing / . 22KV G.O. switch complete. | 1 | Set. | |
| 43 | 43 | Providing / Erection Lightning arrestor. | 1 | Set. | |
| 44 | 44 | Providing / Erection D.O. fuse. | 1 | No. | |
| 45 | 45 | Providing / Erection 22KV disc insulator. | 3 | Set. | |
| 46 | 46 | Providing / Erection 22KV pin insulator with pin. | 3 | Nos. | |
| 47 | 47 | Providing / Erection Stay set complete. | 4 | Set. | |
| 48 | 48 | Providing / Erection Stay wire 7/3.15mm\n @ 10Kg per stay set. | 40 | Mtr. | |
| 49 | 49 | Providing / Erection Pipe earthing. | 3 | Set. | |
| 50 | 50 | Providing / Erection PVC cable 3.5 core185mm. | 40 | Mtr. | |
| 51 | 51 | Providing / Erection LT distribution panel box with MCCB. | 1 | Set. | |
| 52 | 52 | Providing / Erection Aluminium thimble. | 16 | Nos. | |
| 53 | 53 | Providing / Erection Lead tin solder 60-40 | 0.75 | Kg. | |
| 54 | 54 | Providing / Erection Solder flux. | 1 | Tin. | |
| 55 | 55 | Providing / Erection Painting of transformer structure \n(Aluminium paint) | 4 | Nos. | |
| 56 | 56 | Providing / Erection Danger plate 22000 Volt. | 1 | Nos. | |
| 57 | 57 | Providing / Erection 100 kVA transformer | 1 | Each | |
| 58 | 58 | Providing / Erection LTCT Trivictor meter 100/5Amp. | 1 | Nos. | |
| 59 | 59 | Providing / Erection Barbed wire. | 15 | Kg. | |
| 60 | 60 | Providing / Erection M.S.nuts & bolts off size | 25 | Kg. | |
| 61 | 61 | Construction of Transformer Bed | 1 | Job | |
| 62 | 62 | Manual Carriage of Sub-station material up to site of \nwork average distance 2.50 KM | 1 | No | |
| 63 | 63 | FENCING AROUND THE SUB-STATION | |||
| 64 | 64 | Excavation in foundations trenches etc. in earth work, lift upto 1.50 meters stacking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stacked soil 15 cm layers. When required in the plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 meters. | 0.97 | Cum | |
| 65 | 65 | Providing & Laying cement concrete 1:3:6 ( 1 cement : 3 sand : 6 graded stone aggregate 20 mm nominal size ) and curing complete excluding of the centering and shuttering. | 0.97 | Cum | |
| 66 | 66 | Steel works welded in built up sections, trusses and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint in beams joists channels, angles, tee, flats with connecting plats or angle and cross beams hip and jack rafters, purlins connected to common rafter and the like in grating framed guard bars, ladders railing, brackets and similar work.. | 2.68 | Qtl | |
| 67 | 67 | Supplying and fixing expended metal to wood or steel members in partitions etc. weight not exceeding 3 Kg. per square meter. | 30 | Sqm | |
| 68 | 68 | Painting two coats (excluding priming coat) on new steel and other matel surfaces with ready mixed paint, brushing to give and even shade including cleaning the surfaces of all dirt, dust and other foreign matter other than white. Enamel paint other than white. | 30 | Sqm |
AI Tender Summary
Tender Timeline
May 06, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedMay 21, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMay 22, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender