| 1 | 1 | Erection Part of HT Line | BI01010001010000000000000515BI0100001114 | | |
|---|
| 2 | 2 | Erection Steel tubularPole 11mtr. Long . | BI01010001010000000000000515BI0100001116 | 23 | Nos. |
|---|
| 3 | 3 | Providing / Erection RCC muff. | BI01010001010000000000000515BI0100001118 | 23 | Nos. |
|---|
| 4 | 4 | Providing / Erection M.S. X-arm (2800x100x50x600mm) mtr.long. | BI01010001010000000000000515BI0100001120 | 24 | Set. |
|---|
| 5 | 5 | Providing / Erection M.S. X-bracing set. | BI01010001010000000000000515BI0100001122 | 12 | Set |
|---|
| 6 | 6 | Providing / Erection Stay set complete. | BI01010001010000000000000515BI0100001124 | 36 | Set. |
|---|
| 7 | 7 | Providing / Erection Stay wire 7/3.15mm @ 10 Kg per set. | BI01010001010000000000000515BI0100001126 | 360 | Kg. |
|---|
| 8 | 8 | Providing / Erection 22KV disc insulator. | BI01010001010000000000000515BI0100001128 | 45 | Set. |
|---|
| 9 | 9 | Providing / Erection 22KV pin insulator. | BI01010001010000000000000515BI0100001130 | 25 | Nos. |
|---|
| 10 | 10 | Providing / Erection GO switch | BI01010001010000000000000515BI0100001132 | 2 | Set. |
|---|
| 11 | 11 | Providing / Erection Eye hook. | BI01010001010000000000000515BI0100001134 | 36 | Nos. |
|---|
| 12 | 12 | Providing / Erection Egg. Insulator. | BI01010001010000000000000515BI0100001136 | 65 | Nos. |
|---|
| 13 | 13 | Providing / Erection M.S. nuts & bolts off size. | BI01010001010000000000000515BI0100001138 | 80 | Kg. |
|---|
| 14 | 14 | Providing / Erection Bend Stapple | BI01010001010000000000000515BI0100001140 | 24 | Set |
|---|
| 15 | 15 | Providing / Erection Line Stapple | BI01010001010000000000000515BI0100001142 | 24 | Set |
|---|
| 16 | 16 | Providing / Erection Aluminum paint. | BI01010001010000000000000515BI0100001144 | 23 | Ltr. |
|---|
| 17 | 17 | Erection ACSR conductor 6/1/3.35mm². | BI01010001010000000000000515BI0100001146 | 5871 | Mtr. |
|---|
| 18 | 18 | Providing / Erection G.I. wire 8 SWG. | BI01010001010000000000000515BI0100001148 | 200 | Kg. |
|---|
| 19 | 19 | Manual Carriage of HT line material up to site of \nwork average distance 2.00 KM | BI01010001010000000000000515BI0100001150 | 1.9 | KM |
|---|
| 20 | 20 | LT LINE | BI01010001010000000000000515BI0100001152 | | |
|---|
| 21 | 21 | Erection Steel tubular pole 9 mtr. long. | BI01010001010000000000000515BI0100001154 | 5 | Nos. |
|---|
| 22 | 22 | Providing / Erection RCC muff. | BI01010001010000000000000515BI0100001156 | 5 | Nos. |
|---|
| 23 | 23 | Erection ACSR conductor 6/1/2.59mm. | BI01010001010000000000000515BI0100001158 | 1236 | Mtr. |
|---|
| 24 | 24 | Providing / Erection Shackle insulator with D-iron. | BI01010001010000000000000515BI0100001160 | 24 | Nos. |
|---|
| 25 | 25 | Providing / Erection LT stay set. | BI01010001010000000000000515BI0100001162 | 5 | Nos. |
|---|
| 26 | 26 | Providing / Erection Stay wire 7/3.15mm@ 6kg per set | | 30 | Kg. |
|---|
| 27 | 27 | Providing / Erection Egg insutlator. | | 5 | Nos. |
|---|
| 28 | 28 | Providing / Erection Eye hook. | | 6 | Nos. |
|---|
| 29 | 29 | Providing / Erection Aluminum paint. | | 5 | Ltr. |
|---|
| 30 | 30 | Providing / Erection M.S. nuts & bolts off size. | | 10 | Kg. |
|---|
| 31 | 31 | Providing / Erection M.S. GI wire 8SWG | | 32 | Kg. |
|---|
| 32 | 32 | Manual Carriage of LT line material up to site of \nwork average distance 2.70 KM | | 0.3 | Km |
|---|
| 33 | 33 | SUB-STATION | | | |
|---|
| 34 | 34 | Erection Steel tubular pole 11mtr. Long. | | 2 | Nos. |
|---|
| 35 | 35 | Providing / Erection RCC muff. | | 2 | Nos. |
|---|
| 36 | 36 | Providing / Erection C.I. (3000X100X50) mm for X-arm transformer \nbase main channel. | | 4 | Nos. |
|---|
| 37 | 37 | Providing / Erection C.I. (700X100X50x6) mm for supporting main channel of transformer. | | 5 | Nos. |
|---|
| 38 | 38 | Transformer belting | | | |
|---|
| 39 | 39 | Providing / i) Angle iron for (460x50x50)mm. for transformer belt with clamp. | | 2 | Nos. |
|---|
| 40 | 40 | Providing / Erection C.I. (3000X75X40)mm for fuse unit GO switch and DO fuse. | | 4 | Nos. |
|---|
| 41 | 41 | Providing / Erection A.I. X-arm (3000X50X50)mm\n lighting arrestor. | | 2 | Nos. |
|---|
| 42 | 42 | Providing / . 22KV G.O. switch complete. | | 1 | Set. |
|---|
| 43 | 43 | Providing / Erection Lightning arrestor. | | 1 | Set. |
|---|
| 44 | 44 | Providing / Erection D.O. fuse. | | 1 | No. |
|---|
| 45 | 45 | Providing / Erection 22KV disc insulator. | | 3 | Set. |
|---|
| 46 | 46 | Providing / Erection 22KV pin insulator with pin. | | 3 | Nos. |
|---|
| 47 | 47 | Providing / Erection Stay set complete. | | 4 | Set. |
|---|
| 48 | 48 | Providing / Erection Stay wire 7/3.15mm\n @ 10Kg per stay set. | | 40 | Mtr. |
|---|
| 49 | 49 | Providing / Erection Pipe earthing. | | 3 | Set. |
|---|
| 50 | 50 | Providing / Erection PVC cable 3.5 core185mm. | | 40 | Mtr. |
|---|
| 51 | 51 | Providing / Erection LT distribution panel box with MCCB. | | 1 | Set. |
|---|
| 52 | 52 | Providing / Erection Aluminium thimble. | | 16 | Nos. |
|---|
| 53 | 53 | Providing / Erection Lead tin solder 60-40 | | 0.75 | Kg. |
|---|
| 54 | 54 | Providing / Erection Solder flux. | | 1 | Tin. |
|---|
| 55 | 55 | Providing / Erection Painting of transformer structure \n(Aluminium paint) | | 4 | Nos. |
|---|
| 56 | 56 | Providing / Erection Danger plate 22000 Volt. | | 1 | Nos. |
|---|
| 57 | 57 | Providing / Erection 100 kVA transformer | | 1 | Each |
|---|
| 58 | 58 | Providing / Erection LTCT Trivictor meter 100/5Amp. | | 1 | Nos. |
|---|
| 59 | 59 | Providing / Erection Barbed wire. | | 15 | Kg. |
|---|
| 60 | 60 | Providing / Erection M.S.nuts & bolts off size | | 25 | Kg. |
|---|
| 61 | 61 | Construction of Transformer Bed | | 1 | Job |
|---|
| 62 | 62 | Manual Carriage of Sub-station material up to site of \nwork average distance 2.50 KM | | 1 | No |
|---|
| 63 | 63 | FENCING AROUND THE SUB-STATION | | | |
|---|
| 64 | 64 | Excavation in foundations trenches etc. in earth work, lift upto 1.50 meters stacking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stacked soil 15 cm layers. When required in the plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 meters. | | 0.97 | Cum |
|---|
| 65 | 65 | Providing & Laying cement concrete 1:3:6 ( 1 cement : 3 sand : 6 graded stone aggregate 20 mm nominal size ) and curing complete excluding of the centering and shuttering. | | 0.97 | Cum |
|---|
| 66 | 66 | Steel works welded in built up sections, trusses and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint in beams joists channels, angles, tee, flats with connecting plats or angle and cross beams hip and jack rafters, purlins connected to common rafter and the like in grating framed guard bars, ladders railing, brackets and similar work.. | | 2.68 | Qtl |
|---|
| 67 | 67 | Supplying and fixing expended metal to wood or steel members in partitions etc. weight not exceeding 3 Kg. per square meter. | | 30 | Sqm |
|---|
| 68 | 68 | Painting two coats (excluding priming coat) on new steel and other matel surfaces with ready mixed paint, brushing to give and even shade including cleaning the surfaces of all dirt, dust and other foreign matter other than white. Enamel paint other than white. | | 30 | Sqm |
|---|