Transporting & installation of -1L½/10R to -1L½/14R belt conveyer of length 140 mtr.\n55kw gear box, 55kw electric motor, Bed plate and 02 nos. drum, tail end base & drum, discharge drum, discharge columns, belt structure and discharge base & 220 meter 1000mm PVC belt, loop take up drum, loop take up frame, tail end drum and tail end frame and winches & cleaning of 140Mtr. belt space along the gallery with complete all accessories from surface to working site (U/G). \n
1
No.
2
1.01
Earth work in excavation in foundation 18.66 Cum. \n
18.66
Cum
3
1.02
Providing & laying in position cement concrete specified grade excluding the cost of centering and shuttering – All work up to plinth level 1:2:4 (1cement: 2fine sand: 4 graded stone aggregate stone 20mm normal size).\n11.614 Cum. \n
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.