| 1 | 1 | A- Construction of RCC Percolation Well - Supplying of all labour T&P etc for Earth work in Hard Soil within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (A) 1st depth of 1.50 mtr. | BI01010001010000000000000515BI0100001112 | 117.75 | cum |
|---|
| 2 | 2 | (B) 2nd depth of 1.50mtr.(upto 3.0 mtr.) | BI01010001010000000000000515BI0100001113 | 117.75 | Cum |
|---|
| 3 | 3 | Supplying of all labour T&P etc for Earth work in Stony earth and gravelly mixed with stone boilder within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per the direction of the Engineer-in-Charge. (C) 3rd depth of 1.50 mtr (upto 4.50 mtr) | BI01010001010000000000000515BI0100001114 | 85.07 | Cum |
|---|
| 4 | 4 | (D) 4th depth of 1.50mtr.(upto 6.00 mtr.) | BI01010001010000000000000515BI0100001115 | 85.07 | Cum |
|---|
| 5 | 5 | Supplying of all labour,T & P, materials for cutting in D.I rock not requireing blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed as per the direction of Engineer in Charge. (E) 5th depth of 1.50mtr.(upto 7.50 mtr.) | BI01010001010000000000000515BI0100001116 | 66.23 | Cum |
|---|
| 6 | 6 | (F) 6th depth of 1.50mtr.(upto 8.50 mtr.) | BI01010001010000000000000515BI0100001117 | 44.16 | Cum |
|---|
| 7 | 7 | Supplying of all labour,T & P, materials etc. for Rough Dry RRHG stone masonary in wall of open Well including all cost, conveyance, royalty, taxes etc. all to complete and as per the direction of the Engineer-in-Charge. | BI01010001010000000000000515BI0100001118 | 43.16 | Cum |
|---|
| 8 | 8 | Supplying of all labour T & P matrials for filling 25 mm chips around dry stone masonary walls including all cost, coveyance royalty taxes etc. all complete. | BI01010001010000000000000515BI0100001119 | 16.27 | Cum |
|---|
| 9 | 9 | Supplying of all labour,T & P, materials, taxes etc. for Rigid and Smooth Centering and Shuttering for RCC works including false works and dismantling them after casting including cost of materials to complete in ground floor and as per the direction of the Engineer-in-Charge. A- RCC Coloum & Beam | BI01010001010000000000000515BI0100001120 | 50.01 | Sqm |
|---|
| 10 | 10 | B- RCC Wall | BI01010001010000000000000515BI0100001121 | 261.12 | Sqm |
|---|
| 11 | 11 | Supplying of all labour,T & P, materials,taxes etc. for supplying, fitting and placing uncoated HYSD bar reinforcement to complete as per drawing and technical specification for R.C.C. works and as per the direction of the Engineer-in-Charge. | BI01010001010000000000000515BI0100001122 | 39 | Qntl |
|---|
| 12 | 12 | Supplying of all labour,T & P, materials etc. for Cement Concrete (1:1.5:3) with 12 mm size broken hard granite chips for RCC work including hoisting, laying nd all cost, conveyance, royalty,taxes etc. all to complete and as per the direction of the Engineer-in-Charge. | BI01010001010000000000000515BI0100001123 | 64.85 | Cum |
|---|
| 13 | 13 | Providing all labour T&P etc for Refilling in foundation and plinth with excaveted earth or materials,taxes etc. all complete and as per the direction of Engineer In Charge. | BI01010001010000000000000515BI0100001124 | 187.88 | Cum |
|---|
| 14 | 14 | Supplying of all labour,T & P, materials etc for hire charges of disel pump with disel, consumable,operator etc all complete and as per the direction of the Engineer-in-Charge.(To be paid as per actuals.) | BI01010001010000000000000515BI0100001125 | 430 | Hrs. |
|---|
| 15 | 15 | providing all labour T & P etc for trial bore by DTH Rig at site including all consumable , operator etc all completed ( to be paid actual ) | | 60 | Mtr |
|---|