Fertilisers And Chemicals Travancore Limited has published Rubber Lining Of Weak Phosphoric Acid Storage Tank-C At Phosphoric Acid Plant , Fact-Cd , Ambalamedu , Kochi Rubber Lining Of Weak Phosphoric Acid Storage Tank-C At Phosphoric Acid Plant , Fact -Cd , Ambalamedu , Kochi. Submission Date for this Tender is 03-06-2021. Tanks and Cylinders Tenders in Ambalamedu Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 27-May-2021 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 03-06-2021 |
Name of Work: Rubber lining of Weak Phosphoric Acid Storage Tank-C at Phosphoric Acid Plant, FACT -CD, Ambalamedu, Kochi | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Rubber lining of Weak Phosphoric Acid Storage Tank-C at Phosphoric Acid Plant, FACT -CD, Ambalamedu, Kochi | |||
2 | 1.01 | \nRubberlining of Pre-Vulcanized Butyl Rubber Calandered Sheets To a Thickness of 05mm.\n \nWork Involves : Pre-vulcanized butyl rubber calandered sheets\n2.5mm thick suitable for cold bonding, with required\nadhesives, solvents, curing agent etc. shall be supplied.\nPacking, forwarding, transportation, loading /\nunloading and storage at FACT Cochin Division site,\nAmbalamedu, Kochi shall be done. Surface preparation shall be\ndone by shot / grit blasting with proper cleaning. Rubber\nlining / application shall be done with pre-vulcanized butyl\nrubber calandered sheets to a thickness of 05mm in two layers\nof 2.5mm thick each by cold bonding method on bottom plate\ncomplete, shell plate inside complete, inside roof area,\nmanholes, nozzle pipes, dummies and flanges on Phosphoric Acid\nWeak Storage Tank C at PA Plant, FACT Cochin Division site,\nAmbalamedu, Kochi , Kerala as per scope of work detailed in\nSpecial Conditions of Contract, General Conditions of Contract\nand specification sheets attached. Cold bonding, curing,\ninspection, testing, site supervision, and safety\nrequirements shall be done as per attached specification sheet\nNo. 030B of FACT -CD. \n\n | Item 1 | 558 | M2 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail