| 1 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately etc. complete. |
| 3 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. |
| 4 | Providing soling using 80 mm size granite / quartzite / gneiss / trap metal in 15 cm. layer including hand packing filling voids with sand / grit, ramming, watering complete.(Spec. No. : As directed by Engineer-in-charge /Page No. 154) |
| 5 | Providing and laying in situ cement concrete of 1:4:8 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum rtype mixer with SCADA with Natural / VSI standard Artificial Sand) |
| 6 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. |
| 7 | Providing and laying in-situM30 Grade unreinforced plain cement concretepavementover a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS 383, using fine and coarse aggregates combined gradationas per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing plant/ non tilting mixer and Weigh batcheras per approved mix design, admixtures, transporting to site, spreading, laying with approved make paver,compacted and finished in a continuous operation, finishing to lines and gradesas directed by Engineer-in-charge and curingby curing compound /by providing cement vata in cement Mortar 1:8 @0.6m X 0.6m centre to centre, admeasuring 80 mm at bottom and 40 mm at top withdepth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-in-charge. |
| 8 | Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm. .in concrete slab using concrete cutting machine with diamond studded saw within 48 hours of casting of bay / slab etc. complete including subsequent widening of the groove 8 to 10 mm. wide at top having depth of 15 mm. as directed by Engineer incharge. |
| 9 | Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed drawing including fixing Polyethylene foam backer rod of required diameter (appraox. 25% larger than the initial 3 mm.to 4 mm. joint) overlaid with bond breaking tape as per detailed drawing. Item includes cleaning the joints with water jet / air compressor and allowing joint to become thoroughly dry before sealent is applied and applying primer.(A) Contraction and longitudinal joints (15 mm. deep x 8 mm.wide) |
| 10 | Providing and laying 125 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete. |
| 11 | Providing and fixing factory made Hydraulically pressed Mechanically vibrated and compacted precast inter locking cement concrete paving blocks 100MM thick in M-40 grade of approved size and shape for City streets and roads with high volume/ heavy traffice as specified and as per IS 15658:2006 including cost of all materials, manufacturing, curing, transportation of blocks to work site including loading, unloading and stacking as directed, laying paving blocks in position over prepared bed of natural sand / crushed sand of 50 mm thickness including necessary excavation in all stratas, spreading blindge of fine sand over the prepared bed, compacting blocks by plate vibratoretc. complete. |
| 12 | R.C.C. PIPES - Providing andLowering, laying and jointingISI standard R.C.C. pipes in proper grade and alignmentwith collar joints in C.M.1:1 proportion or socketedwith rubber joints in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, excluding GST levied by GOI & GOM in all respect including inspection charges, transporting, unloading and stacking ,cost ofconveyance ,jointing of materail,labouretc. complete as directed by Engineer -chargeas per IS-458/1988 & IS- 783-1985. Note : One collar should be supplied with each full length plain ended RCC pipe, cost including in rates below. One rubber ring should be supplied with each full length of socketed pipe, cost included in rates below. Class ‘NP-II’ |
| 13 | Providing and laying in situ/Ready Mixcement concreteM-20of trap / granite /quartzite/ gneissmetal for R.C.C. workin foundations like raft, strip foundations, grillage andfootings of R.C.C. columns and steel stanchionsetc. including bailing out water, formwork, laying/pumpingcover blocks, compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality Artificial Sand |
| 14 | Providing and laying in situ / ready mix M20 RCC of trap/ granite/ quartzite/ gneiss metal for RCC work of ballast walls, kerbs and box returns including scaffolding, compaction, formwork finishing and curing etc. complete. (excluding reinforcement, with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / pan mixer with Natural / VSI standard Artificial Sand) |
| 15 | Providing and laying in situ / ready mix M25 controlled cement concrete of trap/ granite/ quartzite/ gneiss metal for RCC work in solid/ deck slab etc. including ramming, vibrating, curing, formwork, centering and finishing in cement plaster excluding reinforcementetc. complete. (height up to 5 meter with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / pan mixer with Natural / VSI standard Artificial Sand) |
| 16 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. |
| 17 | Providing and fixing in position steel fibre reinforced concrete (S.F.R.C.) frame and covers of approved make including loading, unloading, transportation, all taxes, etc.complete |
| 18 | Providing and fixing precast 80 mm thick RCC Cover in M-20 for man holes of various sizes with reinforcement of 10 mm dia both way tied with tack welding @ 150 mm c/c with 2 hooks of 12 mm dia bars etc.complete. 2) 750 x600mm |
| 19 | Providing & fixing Ductile iron manhole cover /gratingwithframeof light /medium/heavy /Extra heavy duty of any sizeas per EN124 standard over inspection chamber etc. complete.( Prior permission of S.E. is to be obtained before inclusion of this item in the estimate ) |
| 20 | Providing and laying in trenches 15 mm dia. medium grade having embossed as ISI Mark galvanised iron pipes of 1.25 kg/meter necessary fitting remaking good the demolished portion with filling trenches and with primer of anti-corrosive oil paint, 2 coats Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. |
| 21 | Providing and laying in trenches 20 mm dia. medium grade having embossed as ISI Mark galvanised iron pipes ?of 1.63 kg/meter necessary fitting remaking good the demolished portion with filling trenches and with primer of anti-corrosive oil paint, 2 coats Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. |
| 22 | Transportation of Material obtained from debries of various sorts including necessary excavation / loosing including loading,unloading and conveying and disposing as directed. |