Name of Work: RATE CONTRACT FOR TANK M&I JOBS IN IOCL, BGR | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 10 | Part-A: Tank M&I jobs Group-1 (GQ) | |||
2 | 10.001 | DISMANTLING OF FLOATING/FIXED ROOF TANK Retrieving all existing fittings, instruments, foam seals, side railings, dismantling of damaged corroded shell / roof of welded oil storage tank by gas cuttings/cold cutting or any other suitable means as directed by engineer in charge and transporting them to storage point/ scrapyard as designated without disturbing / damaging any portion of existing piping, equipment, tank and complete in all respect with all labour, tools, machineries, supervision etc. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
3 | 10.002 | Roof : Dismantling of complete roof/ structural/ shell/ course/ truss: Retrieving all the existing fittings, instrumentations, side rails, etc. by gas cutting/ cold cuttings directed by Inspection/ site engineer. And shifting of dismantled roof plates, structural etc. to ground (only scrap) to transport and kept properly the same in scrap yard after taking/ recording weight. During the entire job all safety norms to be followed in any case. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete roof plate minus 10% corrosion correction. | Item 10.20 | 45 | TO |
4 | 10.003 | Shell: Dismantling of shell course retrieving/ removing of shell plates. Retrieving all existing manholes/ nozzles/ fittings, instrumentation, side rail etc. by gas cutting/ cold cutting as directed by EIC. Shifting of all scrap to scrap yard/ designated location as per EIC after taking and recording weight. During the entire shifting job, all safety norms to be followed. Note: The measurement of dismantling, shall be calculated based on actual area of shell plate replaced minus 10% correction corrosion. | Item 10.30 | 20 | TO |
5 | 10.004 | Bottom: Dismantling of bottom (Annular) plates completely: Dismantling of bottom (Annular) plates, job involves cutting of bottom plateand shell to bottom plate welding, jacking of shell. And also cutting of annular to sketch plate cutting. Dismantling of bottom (sketch) plate: Dismantling of bottom (sketch) plates by gas cutting and roof to be properly supported and handing over to civil maintenance for tank bottom foundation repair. Shifting of roof support as and when required to facilitate repair/ relaying of foundation. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete bottom sketch plate minus 10% corrosion correction. | Item 10.40 | 6 | TO |
6 | 10.005 | RESTORATION OF STORAGE TANKS Transportation of MS Plate from storage points to worksite, cleaning, cutting in required sizes, rolling, edge preparing, laying shell courses / roof plates for the storage tanks and partial laying above existing bottom after bulged portions to be cut and new plate to be welded, flushing with existing bottom and continuous welding, installation, fixing of various types of manholes, nozzles, flanges, gaskets, orifice assemblies, tapping for gauges and thermowells etc. all types of fittings, level and other fittings retrieved during the dismantling of the corroded roof, fixing back the side railings of dismantled along with the corroded roof plates, and pneumatic, vacuum and other types of testing, flushing, cleaning, pickling of welded joints where required by the specification and completing all such works in all respect for restoring the tanks to the original condition and commissioning as per drawings, specifications, relevant code (API-650/ API-653 IS-803) and instruction of the Engineer-in-Charge and Inspection Manager. Note: The MS plates for bottom, shell, roof, extension plates, reinforcement pads plates for shell manholes, foam dam will be supplied by the owner as per drawing and specifications. All other labour and materials etc. shall be arranged by the contractor at his cost. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
7 | 10.006 | Roof: Fabrication/ erection of fixed/ floating/ fixed cum floating roof from store to work site, cleaning, cutting in required sizes, rolling, edge preparation and handing over to painting agency and recollection for laying shell course/ roof plates (keeping painted surface in side tank) and to be welded new plates/ structural/ truss etc. as per Inspection recommendations as to develop complete new roof for the tank after installation of various types of manholes, nozzles, flanges, orifice assemblies, instrumentation tapping for gauges/ thermo-wells/ walkways/ platform for Operation requirements etc., fittings for all required valves etc. all such articles, which were retrieved before dismantling the old roof. Fixing back all the same in repaired condition if not usable; the side railing, All jobs related to tank roof replacement to be completed including all NDT as per codes in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, relevant latest codes (per API-650/653/IS:803) and to the satisfaction of inspection/ production and engineer-in-charge. | Item 10.60 | 45 | TO |
8 | 10.007 | Shell: Installation of shell plates along with all nozzles connected to inlet/ outlet lines, drains, roof drain connection as per original drawing and all other existing fittings, instrumentations, side rails, etc. to bring back the tank in original condition and to the satisfaction of Inspection/ Operation and Engineer-in-charge. All weld joints conforming to NDT, such as DP test, Pneumatic test; joints radiography etc. As per code API-650/653 and IS-803 Note: Radiography and DP test shall be paid as separate item. | Item 10.70 | 20 | TO |
9 | 10.008 | Bottom: Fabrication/ erection/ laying of bottom/ annular plates 10/14/16 mm thick: Transport of MS Plates from store to work site, fabrication, erection, overlaying and welding of bottom/ annular plates keeping painted surface towards bituminous pad. Making slot in tank shell, insertion of annular plate, shell to bottom welding from both side of shell, testing of butt/ lap joints by soap solutions under pneumatic test, chalk-diesel test of shell to bottom annular plate all around. Job involves-Edge preparation; fixing of backing strip; welding; NDT i.e. performing DP test, pneumatic test; joints radiography etc. misc. job involves. Lifting of tank shell by jacking. Hydraulically jack up of tank shell to be done in case of annular plate replacement. All weld joints preparation by buffing to facilitate NDT, shell window cutting (of appropriate size) in 1st shell course for insertion of bottom plates and reposition and welding the same after completion of job. Welding of shell window after preheating the plate. Proper stiffening/ support to be provided in cut out plate to prevent deformation. All jobs related to tank bottom replacement to be completed in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, relevant latest codes (API-650/653; IS-803) and to the satisfaction of Inspection/ Operation and Engineer-in-charge. Note: Radiography and DP test shall be paid as separate item. Fabrication/ erection/ laying of bottom sketch plates 6/8 mm thick: Transport of MS Plates from store to work site, fabrication, erection, overlaying, edge preparation/ fixing of backing strip/ welding of bottom sketch plates keeping painted surface towards bituminous pad. All weld joints conforming to NDT, such as DP test, pneumatic test, vacuum test, joints radiography etc. as per code API-650/653; IS-803. Misc. jobs involves all weld joints preparation by buffing to facilitate NDT, preparation of mud dam, conducting pneumatic test as per inspection recommendation. All jobs related to tank bottom replacement to be completed in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, related latest codes (API-650/ 653; IS 803) and to the satisfaction of inspection/ production and engineer in charge. Note: Radiography and DP test shall be paid as separate item. | Item 10.80 | 6 | TO |
10 | 10.009 | PNEUMATIC TEST OF TANK BOTTOM / ROOF | Item 10.90 | 44 | M2 |
11 | 10.01 | HYDRAULIC TESTING OF THE TANK The job includes hydraulic testing of the tank to identify leaks including all connected jobs like blinding / de-blinding, temporary piping arrangements to fill in and empty out the water and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables, supervision, machineries, instruments (duly calibrated) etc. Repetitive hydrotesting of tank to be carried out if required on account of repair or for roof floatation test as per Inspection requirement. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
12 | 10.011 | ABOVE 500 UPTO 1000 M3 | Item 10.110 | 1 | EA |
13 | 10.012 | Above 1000 up to 2000 M3 | Item 10.120 | 1 | EA |
14 | 10.013 | Above 2000 up to 3000 M3 | Item 10.130 | 1 | EA |
15 | 10.014 | Above 3000 up to 4000 M3 | Item 10.140 | 1 | EA |
16 | 10.015 | Above 4000 up to 5000 M3 | Item 10.150 | 1 | EA |
17 | 10.016 | Above 5000 up to 6000 M3 | Item 10.160 | 1 | EA |
18 | 10.017 | Above 9000 up to 10000 M3 | Item 10.170 | 1 | EA |
19 | 10.018 | Above 10000 M3 | Item 10.180 | 1 | EA |
20 | 10.019 | CAPACITY UPTO 500 M3 | Item 10.190 | 1 | EA |
21 | 10.02 | FABRICATION/FIXING OF GAUGE WELL PIPE | Item 10.200 | 1 | EA |
22 | 10.021 | EMERGENCY DRAIN REPLACEMENT | Item 10.210 | 1 | EA |
23 | 10.022 | RIM VENT / BLEEDER VENT REPLACEMENT Cutting / removal of existing rim vent / bleeder vent and fabrication, fixing, installation of the same, fixing proper support, including all testing and supply of brass fittings (for bleeder vent) and complete in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables, equipment, machineries and supervision etc. | |||
24 | 10.023 | Rim vent (4" size) | Item 10.230 | 1 | EA |
25 | 10.024 | Bleeder vent (6" Size) | Item 10.240 | 1 | EA |
26 | 10.025 | REPLACEMENT OF SWIVEL TYPE FLOATING ROOF DRAIN Complete replacement of roof drain / swivel joint after cutting, removing, dismantling the same, fabrication, erection, laying, aligning and welding of swivel joint type roof drain of with all types of clamping, bolting, as required, providing proper counter weight and hydrostatic testing of swivel joints including revisioning/ rectifications if required, including supply of labour, tools and tackles, equipment , machineries and complete the job in all respect to the entire satisfaction the Engineer-in-charge (Material is in the scope of IOCL's supply). | |||
27 | 10.026 | 80 mm | Item 10.260 | 1 | EA |
28 | 10.027 | 100 mm | Item 10.270 | 1 | EA |
29 | 10.028 | 150 mm | Item 10.280 | 1 | EA |
30 | 10.029 | 200 mm | Item 10.290 | 1 | EA |
31 | 10.03 | CLEANING MOPPING OF TANKS | Item 10.300 | 80 | M2 |
32 | 10.031 | CALIBRATION OF TANKS Calibration of the tank as per IS-2007 and IS-2008, preparing the calibration sheets on standard forms showing strapping details, ca lculation details and other relevant details including bottom calibration after taking measurement of dead wood etc. and certified by CPWD or Weights and Measures Department or any other equivalent government authority with all labour, tools & tackles, consu mables, instruments (duly calibrated) and delivery of calibration charts to the Engineer-in-Charge. Fee for calibration of tank to be paid separately as per actuals against valid documents. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be arranged/ paid separately. | |||
33 | 10.032 | ABOVE 500 UPTO 1000 M3 | Item 10.320 | 1 | EA |
34 | 10.033 | Above 1000 upto 2000 M3 | Item 10.330 | 1 | EA |
35 | 10.034 | Above 2000 upto 3000 M3 | Item 10.340 | 1 | EA |
36 | 10.035 | Above 3000 upto 4000 M3 | Item 10.350 | 1 | EA |
37 | 10.036 | Above 4000 upto 5000 M3 | Item 10.360 | 1 | EA |
38 | 10.037 | Above 5000 upto 6000 M3 | Item 10.370 | 1 | EA |
39 | 10.038 | Above 7500 upto 9000 M3 | Item 10.380 | 1 | EA |
40 | 10.039 | Above 9000 upto 10000 M3 | Item 10.390 | 1 | EA |
41 | 10.04 | Above 10000 M3 | Item 10.400 | 1 | EA |
42 | 10.041 | CAPACITY UPTO 500 M3 | Item 10.410 | 1 | EA |
43 | 10.042 | FOAM POURER NOZZLE ON TANK TOP SHELL The job includes cutting, rolling, fabrication, fixing, aligning and welding of shell nozzle in the top shell course of the tank along with fixing of reinforcement pad, nozzle flanges with the applicable requirements of API-650. The scope also includes fixing of foam deflector inside the tank and all the testing like radiography, DP, testing of reinforcement pad etc. and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
44 | 10.043 | 80 mm | Item 10.430 | 1 | EA |
45 | 10.044 | 100 mm | Item 10.440 | 1 | EA |
46 | 10.045 | 150 mm | Item 10.450 | 1 | EA |
47 | 10.046 | 200 mm | Item 10.460 | 1 | EA |
48 | 10.047 | 250 mm | Item 10.470 | 1 | EA |
49 | 10.048 | 300 mm | Item 10.480 | 1 | EA |
50 | 10.049 | REPLACEMENT ROOF SUPPORT LEGS Cutting/ removal of corroded existing pipe sleeves/ support legs/ pontoon and fabrication, fitting, fixing of pipe sleeve (100 mm. N.B.) with new pad plates and stiffener plate and providing support leg (adjustable type of 80 mm N.B.) with cotter pin of 40 mm dia. U-type drain hole, caps etc. and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
51 | 10.05 | Pipe sleeve | Item 10.500 | 6 | EA |
52 | 10.051 | Support Leg | Item 10.510 | 6 | EA |
53 | 10.052 | REPAIRING OF CORRODED/ DAMAGED STEAM HEATING COIL Transportation of material from storage points to work site, cutting, bending, of pipe to 180 degree or as required, threading, edge repairing, welding and laying on supports, welded and threaded pipelines of different pressure and temperature ratings, installation/ fixing of all types of valves, flanges, gaskets, orifice assemblies, all types of fittings like elbows reducers, tees, drains, funnels etc. tapping's for pressure gauges and thermowells, flushing, cleaning and pickling of welded joints where required by specification, erection on all types of supports, fixing of all types of lugs, strips, U-clamps, and hydrostatic, pneumatic, vacuum, NDT and other type of testing and completing all such work in all respect for commissioning as per drawings, specification and and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | Item 10.520 | 9 | M |
54 | 10.053 | FABRICATION AND ERECTION OF CENTRAL DRUM/ MANHOLE | Item 10.530 | 1 | EA |
55 | 10.054 | BOTTOM DRAW-OFF SUMP & ALLIED JOBS | Item 10.540 | 1 | EA |
56 | 10.055 | FABRICATION/ ERECTION OF SPLASH BOARD | Item 10.550 | 1 | EA |
57 | 10.056 | TANK MISCELLANEOUS JOBS The job includes checking and rectification of earthing connection for electrical continuity, checking and rectification of anchor bolts, opening and fixing of level indicator with all accessories / goose neck etc., chipping of pre-mix carpeting of tank foundation at desire places and complete all such work in all respect as per direction of Engineer-in-Charge. The scope also includes installation of Flame Arrestor / Breather valves (grinding, buffing) etc. | |||
58 | 10.057 | Installation of flame arrestor/ breather valve. | Item 10.570 | 1 | EA |
59 | 10.058 | Fixing/ adjusting of anchor bolts. | Item 10.580 | 3 | EA |
60 | 10.059 | Fixing of earthing connections/ misc. welds for cleats, supports for level indicator and any other small patch welding. | Item 10.590 | 1 | EA |
61 | 10.06 | Fixing of level indicator with all accessories/ goose neck etc. | Item 10.600 | 1 | EA |
62 | 10.061 | HYDRAULIC TESTING OF STEAM COIL | Item 10.610 | 100 | EA |
63 | 10.062 | DISMANTLING OF STEAM HEATING COIL | Item 10.620 | 100 | M |
64 | 10.063 | REVISIONING OF SWIVEL JOINT TYPE ROOF DRAIN The job involves revisioning of roof drain, opening of connected flange joints, cleaning of the swivel joints and drain sumps of tanks with wire brushes/ water, replacement of gaskets, packing seals, bearing balls etc. and finally boxing up of the joint. The job includes hydro testing if required and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
65 | 10.064 | Dia 3" Roof Drain | Item 10.640 | 1 | EA |
66 | 10.065 | Dia 4" Roof Drain | Item 10.650 | 1 | EA |
67 | 10.066 | Dia 6" Roof Drain | Item 10.660 | 1 | EA |
68 | 10.067 | TESTING OF ROOF DRAIN SYSTEM OF TANK Hydro-testing of swivel joints including opening of flanges, blinding if required, dismantling of swivel joint, installation of hydraulic pump and pressure gauge, testing at pressure suggested by inspection and as per instruction of engineer-in-charge, rotation testing of all swivel joints including piping and NRV in assembled condition. All labour, tools, tackles, machinery, consumables, instruments will be in the scope of contractor. "O" rings and steel balls required for above job will be in the owner's scope. | |||
69 | 10.068 | Dia 3" Roof Drain | Item 10.680 | 1 | EA |
70 | 10.069 | Dia 4" Roof Drain | Item 10.690 | 1 | EA |
71 | 10.07 | Dia 6" Roof Drain | Item 10.700 | 1 | EA |
72 | 10.071 | REPLACEMENT OF FIRE WATER SPRINKLER RING OF OIL STORAGE TANKS AND FABRICATION OF NEW SYSTEM Dismantling of complete cooling ring by cold cutting from existing location (from height 10-15 meter) of the tank and lowering down to ground level, transportation of new pipe from owners storage point to place of work. Fabrication of sprinkler piping with flange joints at every 20 meter interval, (this includes bending, cutting, grinding, bevelling, fabrication, providing supports, welding of flanges as per site requirement, welding of sockets for sprinklers) Erection, laying of firewater sprinkler system (cooling ring) in original shape and position including sockets with sprinkler welding at suitable location as per inspection and safety department recommendation. Testing of all joints, section before erection, jointing these pipes with 8"/6" vertical header by equal tee and flanged end connection, testing and commissioning the system, fabrication, erection of support brackets and U-clamps for ring wherever required with owners supplied material, complete the job in all respect including supply of all equipment (welding machine, pipe bending machine, lifting tools and tackles, grinding machines etc.). Consumables such as electrodes, grinding wheels etc. as per specification and direction of EIC. This also includes salvaging of sprinklers from old piping, fabrication of mitres etc. Shifting of all scrap to scrap yard shall be in the scope of contractor. This also includes cutting and rebuilding of dyke if required for movement. Note: 1. The contractor shall be paid on the actual measurement on running meter basis of sprinkler system. 2. If the item is operated when tank is in operation then no hot job shall be permissible at site. The ring system shall be fabricated with flanges at ends of bend pipe and to be erected and boxed up. However, if it is carried out during M&I of tank then hot job may be permissible. The maintenance philosophy shall be decided by EIC at the time of execution. The rate of item shall remain unchanged for both maintenance philosophy. 3. The above item is applicable for replacement of fire water sprinkler ring only. 4. Payment for vertical riser pipe/ horizontal header (other than ring portion) shall be paid in separate item under this SOR. 5. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Note: Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
73 | 10.072 | Pipe - Dia 3" | Item 10.720 | 2 | M |
74 | 10.073 | Pipe - Dia 4" | Item 10.730 | 2 | M |
75 | 10.074 | Pipe - Dia 6" | Item 10.740 | 2 | M |
76 | 10.075 | REINFORCEMENT OF EXISTING WELD JOINT (E-6013) | Item 10.750 | 6 | M |
77 | 10.076 | REINFORCEMENT OF EXISTING WELD JOINT (E-7018) | Item 10.760 | 6 | M |
78 | 10.077 | STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the areas specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding material including supply of all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-Charge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs | |||
79 | 10.078 | Upto 6 M | Item 10.780 | 88 | M2 |
80 | 10.079 | Above 6 m upto 10 m | Item 10.790 | 588 | M2 |
81 | 10.08 | Above 10 m upto 20 m | Item 10.800 | 588 | M2 |
82 | 10.081 | Intermediate plate form | Item 10.810 | 88 | M2 |
83 | 10.082 | Volumetric (For inside Furnace/ Vessels etc.) (For volumetric scaffolding beyond 10 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 10 meters.) | Item 10.820 | 29 | M3 |
84 | 10.083 | WELDING OF CS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding of CS plates including cutting / grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools & tackles, supervision as per technical specifications, drawings and complete the job in all respect as per direction of the Engineer-in-Charge. Note: Heat treatment and other NDT charges shall be paid extra. | |||
85 | 10.084 | Upto 3mm thick | Item 10.840 | 18 | M |
86 | 10.085 | Above 3mm & upto 5mm thick. | Item 10.850 | 18 | M |
87 | 10.086 | Above 5mm & upto 6mm thick | Item 10.860 | 18 | M |
88 | 10.087 | Above 6mm & upto 7mm thick | Item 10.870 | 18 | M |
89 | 10.088 | Above 7mm & upto 9mm thick. | Item 10.880 | 18 | M |
90 | 10.089 | Above 9mm & upto 11mm thick | Item 10.890 | 29 | M |
91 | 10.09 | Above 11mm & upto 12.7mm thick | Item 10.900 | 16 | M |
92 | 10.091 | INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, gaskets, nut bolts etc. either from owner's storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ ring properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing strips, complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. | |||
93 | 10.092 | For Valves (other than RTJ) | Item 10.920 | 64 | KG |
94 | 10.093 | REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. | Item 10.930 | 18 | KG |
95 | 10.094 | FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DAVITS / STAIR CASE ETC. | Item 10.940 | 1 | TO |
96 | 10.095 | DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC. | Item 10.950 | 1 | TO |
97 | 10.096 | CS weld deposit for tank surface (upto 2.5mm depth) | Item 10.960 | 88 | M2 |
98 | 10.097 | GOOSE NECK CLEANING Cleaning of goose neck and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
99 | 10.098 | DIA 6 INCH | Item 10.980 | 1 | EA |
100 | 10.099 | DIA 8 INCH | Item 10.990 | 1 | EA |
101 | 10.1 | DIA 10" | Item 10.1000 | 1 | EA |
102 | 10.101 | HOT/ COLD BENDING OF PIPES FOR SPRINKLER SYSTEM ON THE TANK | Item 10.1010 | 59 | IM |
103 | 10.102 | REVISIONING OF GUIDE ROLLERS IN TANKS Revisioning of guide rollers in tanks and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | Item 10.1020 | 15 | EA |
104 | 10.103 | All kinds of soil | Item 10.1030 | 59 | M3 |
105 | 10.104 | Cement mortar 1:4 (1 cement : 4 coarse sand) | Item 10.1040 | 84 | M2 |
106 | 10.105 | Filling available excavated earth (excluding rock ) in trenches, plinth, sides of foundations etc., in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m | Item 10.1050 | 74 | M3 |
107 | 10.106 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | Item 10.1060 | 350 | M3 |
108 | 10.107 | Foundations, footings, bases of columns etc. for mass concrete. | Item 10.1070 | 294 | M2 |
109 | 10.108 | Thermo-mechanically treated bars | Item 10.1080 | 147 | KG |
110 | 10.109 | Design, supply, fabrication, making of suitable foundation and erection of barricade around the tank undertaken for repair, isolating it from other tanks and without disturbing normal operation of other nearby tanks, using structural steel/steel pipes andCGI/AL sheets, clamps, wire rope etc., covering fully from grade level and upto a height of 1.0 mtr. above the Crown of the tanks. Barricading should be designed to withstand natural calamities, like heavy rain fall, seasonal wind load etc. Dismantlingand removal of the barricading materials from the operating area, immediately after completion of tank repairing. [A portion towards the road side to be left open for access to work place. Part of the barricading erected to repair one Tank will be used for repairing of other tanks, if found suitable. For a new tank, 30% barricading will be done with new GI sheets and 70% to be done with GI sheets used in previous tank repair if found suitable for use by EIC]. | |||
111 | 10.11 | Design, supply, fabrication isolating | Item 10.1100 | 3000 | M2 |
112 | 10.111 | "MAKING INLET/OUTLETNOZZLE, MANHOLE, VENT HOLE, ETC. ON ROOF & SHELL: Making hole of required size, fabrication of tank nozzle/neck flange as per code and drawing, providing re-inforcement pad, welding of the same to the tank, making necessary cover & connection & boxing up to complete the work as per instruction of Engineer-In-Charge. | Item 10.1110 | 100 | ID |
113 | 10.112 | Sprinkler coil ( approx length 60-70 m) from old 1.5 to 2.0 inch dia pipe all around the tank to spray FW during hot job in tank | Item 10.1120 | 2 | LS |
114 | 10.113 | Column support for temporary staging of roof structure for top course of shell plate replacement (material: BGR SCOPE) | Item 10.1130 | 10 | EA |
115 | 10.114 | Removal of Oily sludge from tank, cleaning of shell and bottom plates, weld beads for handover to Inspection for thickness gauging and transportation of sludge after collection of disposal at siphoning pond with BGR complexat a distance about 1KM or at melting pit at east side of pump house-I as per direction of EIC. | Item 10.1140 | 300 | M3 |
116 | 10.115 | Foam Pourer overhauling : Scaffolding, Dismantling, shifting to CWS for overhauling and put back into service after overhauling. | Item 10.1150 | 10 | EA |
117 | 10.116 | DISMANTLING & REMOVAL OF FOLDING LADDER INSTALLED AT WLG, SHIFTING THE SAME TO DESIGNATED SITE/SCRAPYARD, INSTALLATION OF NEWLY FABRICATED LADDER AT SITE AFTER PROPER BALANCING, FIXING OF RUBBER PADS AND COUNTERWEIGHTS WITH PROPER FASTENERS TO COMPLETE WORK IN ALL RESPECTS AS PER DIRECTION OF ENGINEER -IN-CHARGE INCLUDING SUPPLY OF TOOLS,TACKLES, LIFTING ARRANGE MENT, LABOUR ETC. | Item 10.1160 | 1 | EA |
118 | 10.117 | STRUCTURAL WORK WITH IOCL (BGR) SUPPLY :- Drawing and shifting of structural materials, Fabrication and Erection of structures,making of all types of joints for partial/total replacement of tank roof supporting structures, curb angles, stairway, hand rails, landing plate-forms, gratings, including supply of all types consumables, machineries, nut-bolts, laborurers, to complete the structure repairing and modification work as per instruction of Engineer-in-charge.[Structural Materials required for replacement of structures will be supplied by IOCL (BGR)]. | |||
119 | 10.118 | Fabrication/Erection of piping support/platforms etc for tank reparing job. | Item 10.1180 | 1 | TO |
120 | 10.119 | Erection of temporary plate lifting stru | Item 10.1190 | 1 | TO |
121 | 10.12 | Fabrication & Erection of new grating, hand railing, ladder etc. including supply and application of Red Oxide Zinc Chromate Primer (excluding cost of structural steel). | Item 10.1200 | 1 | EA |
122 | 10.121 | TACK WELDING (Length of 1 tack is 10 mm) | |||
123 | 10.122 | CS to CS Tack Welding | Item 10.1220 | 180 | EA |
124 | 10.123 | SS to SS Tack Welding | Item 10.1230 | 60 | EA |
125 | 10.124 | Internal cleaning of tank of ANY capacity ,scrapping of the bottom ,side walls,roof,steam coils,roof legs etc.to make it oil free and Supply of semi skilled manpower on per day basis to complete the jobs. UOM = DAY | Item 10.1240 | 300 | EA |
126 | 20 | Part-B: Tank M&I jobs Group-1 (GO) | |||
127 | 20.001 | DISMANTLING OF FLOATING/FIXED ROOF TANK Retrieving all existing fittings, instruments, foam seals, side railings, dismantling of damaged corroded shell / roof of welded oil storage tank by gas cuttings/cold cutting or any other suitable means as directed by engineer in charge and transporting them to storage point/ scrapyard as designated without disturbing / damaging any portion of existing piping, equipment, tank and complete in all respect with all labour, tools, machineries, supervision etc. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
128 | 20.002 | Roof : Dismantling of complete roof/ structural/ shell/ course/ truss: Retrieving all the existing fittings, instrumentations, side rails, etc. by gas cutting/ cold cuttings directed by Inspection/ site engineer. And shifting of dismantled roof plates, structural etc. to ground (only scrap) to transport and kept properly the same in scrap yard after taking/ recording weight. During the entire job all safety norms to be followed in any case. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete roof plate minus 10% corrosion correction. | Item 20.20 | 12 | TO |
129 | 20.003 | Shell: Dismantling of shell course retrieving/ removing of shell plates. Retrieving all existing manholes/ nozzles/ fittings, instrumentation, side rail etc. by gas cutting/ cold cutting as directed by EIC. Shifting of all scrap to scrap yard/ designated location as per EIC after taking and recording weight. During the entire shifting job, all safety norms to be followed. Note: The measurement of dismantling, shall be calculated based on actual area of shell plate replaced minus 10% correction corrosion. | Item 20.30 | 6 | TO |
130 | 20.004 | Bottom: Dismantling of bottom (Annular) plates completely: Dismantling of bottom (Annular) plates, job involves cutting of bottom plateand shell to bottom plate welding, jacking of shell. And also cutting of annular to sketch plate cutting. Dismantling of bottom (sketch) plate: Dismantling of bottom (sketch) plates by gas cutting and roof to be properly supported and handing over to civil maintenance for tank bottom foundation repair. Shifting of roof support as and when required to facilitate repair/ relaying of foundation. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete bottom sketch plate minus 10% corrosion correction. | Item 20.40 | 2 | TO |
131 | 20.005 | RESTORATION OF STORAGE TANKS Transportation of MS Plate from storage points to worksite, cleaning, cutting in required sizes, rolling, edge preparing, laying shell courses / roof plates for the storage tanks and partial laying above existing bottom after bulged portions to be cut and new plate to be welded, flushing with existing bottom and continuous welding, installation, fixing of various types of manholes, nozzles, flanges, gaskets, orifice assemblies, tapping for gauges and thermowells etc. all types of fittings, level and other fittings retrieved during the dismantling of the corroded roof, fixing back the side railings of dismantled along with the corroded roof plates, and pneumatic, vacuum and other types of testing, flushing, cleaning, pickling of welded joints where required by the specification and completing all such works in all respect for restoring the tanks to the original condition and commissioning as per drawings, specifications, relevant code (API-650/ API-653 IS-803) and instruction of the Engineer-in-Charge and Inspection Manager. Note: The MS plates for bottom, shell, roof, extension plates, reinforcement pads plates for shell manholes, foam dam will be supplied by the owner as per drawing and specifications. All other labour and materials etc. shall be arranged by the contractor at his cost. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
132 | 20.006 | Roof: Fabrication/ erection of fixed/ floating/ fixed cum floating roof from store to work site, cleaning, cutting in required sizes, rolling, edge preparation and handing over to painting agency and recollection for laying shell course/ roof plates (keeping painted surface in side tank) and to be welded new plates/ structural/ truss etc. as per Inspection recommendations as to develop complete new roof for the tank after installation of various types of manholes, nozzles, flanges, orifice assemblies, instrumentation tapping for gauges/ thermo-wells/ walkways/ platform for Operation requirements etc., fittings for all required valves etc. all such articles, which were retrieved before dismantling the old roof. Fixing back all the same in repaired condition if not usable; the side railing, All jobs related to tank roof replacement to be completed including all NDT as per codes in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, relevant latest codes (per API-650/653/IS:803) and to the satisfaction of inspection/ production and engineer-in-charge. | Item 20.60 | 12 | TO |
133 | 20.007 | Shell: Installation of shell plates along with all nozzles connected to inlet/ outlet lines, drains, roof drain connection as per original drawing and all other existing fittings, instrumentations, side rails, etc. to bring back the tank in original condition and to the satisfaction of Inspection/ Operation and Engineer-in-charge. All weld joints conforming to NDT, such as DP test, Pneumatic test; joints radiography etc. As per code API-650/653 and IS-803 Note: Radiography and DP test shall be paid as separate item. | Item 20.70 | 6 | TO |
134 | 20.008 | Bottom: Fabrication/ erection/ laying of bottom/ annular plates 10/14/16 mm thick: Transport of MS Plates from store to work site, fabrication, erection, overlaying and welding of bottom/ annular plates keeping painted surface towards bituminous pad. Making slot in tank shell, insertion of annular plate, shell to bottom welding from both side of shell, testing of butt/ lap joints by soap solutions under pneumatic test, chalk-diesel test of shell to bottom annular plate all around. Job involves-Edge preparation; fixing of backing strip; welding; NDT i.e. performing DP test, pneumatic test; joints radiography etc. misc. job involves. Lifting of tank shell by jacking. Hydraulically jack up of tank shell to be done in case of annular plate replacement. All weld joints preparation by buffing to facilitate NDT, shell window cutting (of appropriate size) in 1st shell course for insertion of bottom plates and reposition and welding the same after completion of job. Welding of shell window after preheating the plate. Proper stiffening/ support to be provided in cut out plate to prevent deformation. All jobs related to tank bottom replacement to be completed in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, relevant latest codes (API-650/653; IS-803) and to the satisfaction of Inspection/ Operation and Engineer-in-charge. Note: Radiography and DP test shall be paid as separate item. Fabrication/ erection/ laying of bottom sketch plates 6/8 mm thick: Transport of MS Plates from store to work site, fabrication, erection, overlaying, edge preparation/ fixing of backing strip/ welding of bottom sketch plates keeping painted surface towards bituminous pad. All weld joints conforming to NDT, such as DP test, pneumatic test, vacuum test, joints radiography etc. as per code API-650/653; IS-803. Misc. jobs involves all weld joints preparation by buffing to facilitate NDT, preparation of mud dam, conducting pneumatic test as per inspection recommendation. All jobs related to tank bottom replacement to be completed in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, related latest codes (API-650/ 653; IS 803) and to the satisfaction of inspection/ production and engineer in charge. Note: Radiography and DP test shall be paid as separate item. | Item 20.80 | 2 | TO |
135 | 20.009 | PNEUMATIC TEST OF TANK BOTTOM / ROOF | Item 20.90 | 27 | M2 |
136 | 20.01 | HYDRAULIC TESTING OF THE TANK The job includes hydraulic testing of the tank to identify leaks including all connected jobs like blinding / de-blinding, temporary piping arrangements to fill in and empty out the water and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables, supervision, machineries, instruments (duly calibrated) etc. Repetitive hydrotesting of tank to be carried out if required on account of repair or for roof floatation test as per Inspection requirement. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
137 | 20.011 | ABOVE 500 UPTO 1000 M3 | Item 20.110 | 1 | EA |
138 | 20.012 | Above 1000 up to 2000 M3 | Item 20.120 | 1 | EA |
139 | 20.013 | Above 2000 up to 3000 M3 | Item 20.130 | 1 | EA |
140 | 20.014 | Above 3000 up to 4000 M3 | Item 20.140 | 1 | EA |
141 | 20.015 | Above 4000 up to 5000 M3 | Item 20.150 | 1 | EA |
142 | 20.016 | Above 5000 up to 6000 M3 | Item 20.160 | 1 | EA |
143 | 20.017 | Above 9000 up to 10000 M3 | Item 20.170 | 1 | EA |
144 | 20.018 | Above 10000 M3 | Item 20.180 | 1 | EA |
145 | 20.019 | CAPACITY UPTO 500 M3 | Item 20.190 | 1 | EA |
146 | 20.02 | FABRICATION/FIXING OF GAUGE WELL PIPE | Item 20.200 | 1 | EA |
147 | 20.021 | EMERGENCY DRAIN REPLACEMENT | Item 20.210 | 1 | EA |
148 | 20.022 | RIM VENT / BLEEDER VENT REPLACEMENT Cutting / removal of existing rim vent / bleeder vent and fabrication, fixing, installation of the same, fixing proper support, including all testing and supply of brass fittings (for bleeder vent) and complete in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables, equipment, machineries and supervision etc. | |||
149 | 20.023 | Rim vent (4" size) | Item 20.230 | 1 | EA |
150 | 20.024 | Bleeder vent (6" Size) | Item 20.240 | 1 | EA |
151 | 20.025 | REPLACEMENT OF SWIVEL TYPE FLOATING ROOF DRAIN Complete replacement of roof drain / swivel joint after cutting, removing, dismantling the same, fabrication, erection, laying, aligning and welding of swivel joint type roof drain of with all types of clamping, bolting, as required, providing proper counter weight and hydrostatic testing of swivel joints including revisioning/ rectifications if required, including supply of labour, tools and tackles, equipment , machineries and complete the job in all respect to the entire satisfaction the Engineer-in-charge (Material is in the scope of IOCL's supply). | |||
152 | 20.026 | 80 mm | Item 20.260 | 1 | EA |
153 | 20.027 | 100 mm | Item 20.270 | 1 | EA |
154 | 20.028 | 150 mm | Item 20.280 | 1 | EA |
155 | 20.029 | 200 mm | Item 20.290 | 1 | EA |
156 | 20.03 | CLEANING MOPPING OF TANKS | Item 20.300 | 49.11 | M2 |
157 | 20.031 | CALIBRATION OF TANKS Calibration of the tank as per IS-2007 and IS-2008, preparing the calibration sheets on standard forms showing strapping details, ca lculation details and other relevant details including bottom calibration after taking measurement of dead wood etc. and certified by CPWD or Weights and Measures Department or any other equivalent government authority with all labour, tools & tackles, consu mables, instruments (duly calibrated) and delivery of calibration charts to the Engineer-in-Charge. Fee for calibration of tank to be paid separately as per actuals against valid documents. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be arranged/ paid separately. | |||
158 | 20.032 | ABOVE 500 UPTO 1000 M3 | Item 20.320 | 1 | EA |
159 | 20.033 | Above 1000 upto 2000 M3 | Item 20.330 | 1 | EA |
160 | 20.034 | Above 2000 upto 3000 M3 | Item 20.340 | 1 | EA |
161 | 20.035 | Above 3000 upto 4000 M3 | Item 20.350 | 1 | EA |
162 | 20.036 | Above 4000 upto 5000 M3 | Item 20.360 | 1 | EA |
163 | 20.037 | Above 5000 upto 6000 M3 | Item 20.370 | 1 | EA |
164 | 20.038 | Above 7500 upto 9000 M3 | Item 20.380 | 1 | EA |
165 | 20.039 | Above 9000 upto 10000 M3 | Item 20.390 | 1 | EA |
166 | 20.04 | Above 10000 M3 | Item 20.400 | 1 | EA |
167 | 20.041 | CAPACITY UPTO 500 M3 | Item 20.410 | 1 | EA |
168 | 20.042 | FOAM POURER NOZZLE ON TANK TOP SHELL The job includes cutting, rolling, fabrication, fixing, aligning and welding of shell nozzle in the top shell course of the tank along with fixing of reinforcement pad, nozzle flanges with the applicable requirements of API-650. The scope also includes fixing of foam deflector inside the tank and all the testing like radiography, DP, testing of reinforcement pad etc. and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
169 | 20.043 | 80 mm | Item 20.430 | 1 | EA |
170 | 20.044 | 100 mm | Item 20.440 | 1 | EA |
171 | 20.045 | 150 mm | Item 20.450 | 1 | EA |
172 | 20.046 | 200 mm | Item 20.460 | 1 | EA |
173 | 20.047 | 250 mm | Item 20.470 | 1 | EA |
174 | 20.048 | 300 mm | Item 20.480 | 1 | EA |
175 | 20.049 | REPLACEMENT ROOF SUPPORT LEGS Cutting/ removal of corroded existing pipe sleeves/ support legs/ pontoon and fabrication, fitting, fixing of pipe sleeve (100 mm. N.B.) with new pad plates and stiffener plate and providing support leg (adjustable type of 80 mm N.B.) with cotter pin of 40 mm dia. U-type drain hole, caps etc. and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
176 | 20.05 | Pipe sleeve | Item 20.500 | 4 | EA |
177 | 20.051 | Support Leg | Item 20.510 | 4 | EA |
178 | 20.052 | REPAIRING OF CORRODED/ DAMAGED STEAM HEATING COIL Transportation of material from storage points to work site, cutting, bending, of pipe to 180 degree or as required, threading, edge repairing, welding and laying on supports, welded and threaded pipelines of different pressure and temperature ratings, installation/ fixing of all types of valves, flanges, gaskets, orifice assemblies, all types of fittings like elbows reducers, tees, drains, funnels etc. tapping's for pressure gauges and thermowells, flushing, cleaning and pickling of welded joints where required by specification, erection on all types of supports, fixing of all types of lugs, strips, U-clamps, and hydrostatic, pneumatic, vacuum, NDT and other type of testing and completing all such work in all respect for commissioning as per drawings, specification and and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | Item 20.520 | 5 | M |
179 | 20.053 | FABRICATION AND ERECTION OF CENTRAL DRUM/ MANHOLE | Item 20.530 | 1 | EA |
180 | 20.054 | BOTTOM DRAW-OFF SUMP & ALLIED JOBS | Item 20.540 | 1 | EA |
181 | 20.055 | FABRICATION/ ERECTION OF SPLASH BOARD | Item 20.550 | 1 | EA |
182 | 20.056 | TANK MISCELLANEOUS JOBS The job includes checking and rectification of earthing connection for electrical continuity, checking and rectification of anchor bolts, opening and fixing of level indicator with all accessories / goose neck etc., chipping of pre-mix carpeting of tank foundation at desire places and complete all such work in all respect as per direction of Engineer-in-Charge. The scope also includes installation of Flame Arrestor / Breather valves (grinding, buffing) etc. | |||
183 | 20.057 | Installation of flame arrestor/ breather valve. | Item 20.570 | 1 | EA |
184 | 20.058 | Fixing/ adjusting of anchor bolts. | Item 20.580 | 2 | EA |
185 | 20.059 | Fixing of earthing connections/ misc. welds for cleats, supports for level indicator and any other small patch welding. | Item 20.590 | 1 | EA |
186 | 20.06 | Fixing of level indicator with all accessories/ goose neck etc. | Item 20.600 | 1 | EA |
187 | 20.061 | HYDRAULIC TESTING OF STEAM COIL | Item 20.610 | 15 | EA |
188 | 20.062 | DISMANTLING OF STEAM HEATING COIL | Item 20.620 | 10 | M |
189 | 20.063 | REVISIONING OF SWIVEL JOINT TYPE ROOF DRAIN The job involves revisioning of roof drain, opening of connected flange joints, cleaning of the swivel joints and drain sumps of tanks with wire brushes/ water, replacement of gaskets, packing seals, bearing balls etc. and finally boxing up of the joint. The job includes hydro testing if required and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
190 | 20.064 | Dia 3" Roof Drain | Item 20.640 | 1 | EA |
191 | 20.065 | Dia 4" Roof Drain | Item 20.650 | 1 | EA |
192 | 20.066 | Dia 6" Roof Drain | Item 20.660 | 1 | EA |
193 | 20.067 | TESTING OF ROOF DRAIN SYSTEM OF TANK Hydro-testing of swivel joints including opening of flanges, blinding if required, dismantling of swivel joint, installation of hydraulic pump and pressure gauge, testing at pressure suggested by inspection and as per instruction of engineer-in-charge, rotation testing of all swivel joints including piping and NRV in assembled condition. All labour, tools, tackles, machinery, consumables, instruments will be in the scope of contractor. "O" rings and steel balls required for above job will be in the owner's scope. | |||
194 | 20.068 | Dia 3" Roof Drain | Item 20.680 | 1 | EA |
195 | 20.069 | Dia 4" Roof Drain | Item 20.690 | 1 | EA |
196 | 20.07 | Dia 6" Roof Drain | Item 20.700 | 1 | EA |
197 | 20.071 | REPLACEMENT OF FIRE WATER SPRINKLER RING OF OIL STORAGE TANKS AND FABRICATION OF NEW SYSTEM Dismantling of complete cooling ring by cold cutting from existing location (from height 10-15 meter) of the tank and lowering down to ground level, transportation of new pipe from owners storage point to place of work. Fabrication of sprinkler piping with flange joints at every 20 meter interval, (this includes bending, cutting, grinding, bevelling, fabrication, providing supports, welding of flanges as per site requirement, welding of sockets for sprinklers) Erection, laying of firewater sprinkler system (cooling ring) in original shape and position including sockets with sprinkler welding at suitable location as per inspection and safety department recommendation. Testing of all joints, section before erection, jointing these pipes with 8"/6" vertical header by equal tee and flanged end connection, testing and commissioning the system, fabrication, erection of support brackets and U-clamps for ring wherever required with owners supplied material, complete the job in all respect including supply of all equipment (welding machine, pipe bending machine, lifting tools and tackles, grinding machines etc.). Consumables such as electrodes, grinding wheels etc. as per specification and direction of EIC. This also includes salvaging of sprinklers from old piping, fabrication of mitres etc. Shifting of all scrap to scrap yard shall be in the scope of contractor. This also includes cutting and rebuilding of dyke if required for movement. Note: 1. The contractor shall be paid on the actual measurement on running meter basis of sprinkler system. 2. If the item is operated when tank is in operation then no hot job shall be permissible at site. The ring system shall be fabricated with flanges at ends of bend pipe and to be erected and boxed up. However, if it is carried out during M&I of tank then hot job may be permissible. The maintenance philosophy shall be decided by EIC at the time of execution. The rate of item shall remain unchanged for both maintenance philosophy. 3. The above item is applicable for replacement of fire water sprinkler ring only. 4. Payment for vertical riser pipe/ horizontal header (other than ring portion) shall be paid in separate item under this SOR. 5. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Note: Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
198 | 20.072 | Pipe - Dia 3" | Item 20.720 | 1 | M |
199 | 20.073 | Pipe - Dia 4" | Item 20.730 | 1 | M |
200 | 20.074 | Pipe - Dia 6" | Item 20.740 | 1 | M |
201 | 20.075 | REINFORCEMENT OF EXISTING WELD JOINT (E-6013) | Item 20.750 | 4 | M |
202 | 20.076 | REINFORCEMENT OF EXISTING WELD JOINT (E-7018) | Item 20.760 | 4 | M |
203 | 20.077 | STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the areas specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding material including supply of all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-Charge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs | |||
204 | 20.078 | Upto 6 M | Item 20.780 | 54 | M2 |
205 | 20.079 | Above 6 m upto 10 m | Item 20.790 | 360 | M2 |
206 | 20.08 | Above 10 m upto 20 m | Item 20.800 | 80 | M2 |
207 | 20.081 | Intermediate plate form | Item 20.810 | 54 | M2 |
208 | 20.082 | Volumetric (For inside Furnace/ Vessels etc.) (For volumetric scaffolding beyond 10 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 10 meters.) | Item 20.820 | 18 | M3 |
209 | 20.083 | WELDING OF CS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding of CS plates including cutting / grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools & tackles, supervision as per technical specifications, drawings and complete the job in all respect as per direction of the Engineer-in-Charge. Note: Heat treatment and other NDT charges shall be paid extra. | |||
210 | 20.084 | Upto 3mm thick | Item 20.840 | 11 | M |
211 | 20.085 | Above 3mm & upto 5mm thick. | Item 20.850 | 11 | M |
212 | 20.086 | Above 5mm & upto 6mm thick | Item 20.860 | 11 | M |
213 | 20.087 | Above 6mm & upto 7mm thick | Item 20.870 | 11 | M |
214 | 20.088 | Above 7mm & upto 9mm thick. | Item 20.880 | 11 | M |
215 | 20.089 | Above 9mm & upto 11mm thick | Item 20.890 | 18 | M |
216 | 20.09 | Above 11mm & upto 12.7mm thick | Item 20.900 | 10 | M |
217 | 20.091 | INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, gaskets, nut bolts etc. either from owner's storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ ring properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing strips, complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. | |||
218 | 20.092 | For Valves (other than RTJ) | Item 20.920 | 39.97 | KG |
219 | 20.093 | REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. | Item 20.930 | 11 | KG |
220 | 20.094 | FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DAVITS / STAIR CASE ETC. | Item 20.940 | 1 | TO |
221 | 20.095 | DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC. | Item 20.950 | 1 | TO |
222 | 20.096 | CS weld deposit for tank surface (upto 2.5mm depth) | Item 20.960 | 54 | M2 |
223 | 20.097 | GOOSE NECK CLEANING Cleaning of goose neck and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
224 | 20.098 | DIA 6 INCH | Item 20.980 | 1 | EA |
225 | 20.099 | DIA 8 INCH | Item 20.990 | 1 | EA |
226 | 20.1 | DIA 10" | Item 20.1000 | 1 | EA |
227 | 20.101 | HOT/ COLD BENDING OF PIPES FOR SPRINKLER SYSTEM ON THE TANK | Item 20.1010 | 36 | IM |
228 | 20.102 | REVISIONING OF GUIDE ROLLERS IN TANKS Revisioning of guide rollers in tanks and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | Item 20.1020 | 9 | EA |
229 | 20.103 | All kinds of soil | Item 20.1030 | 36 | M3 |
230 | 20.104 | Cement mortar 1:4 (1 cement : 4 coarse sand) | Item 20.1040 | 36 | M2 |
231 | 20.105 | Filling available excavated earth (excluding rock ) in trenches, plinth, sides of foundations etc., in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m | Item 20.1050 | 45 | M3 |
232 | 20.106 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | Item 20.1060 | 102 | M3 |
233 | 20.107 | Foundations, footings, bases of columns etc. for mass concrete. | Item 20.1070 | 86 | M2 |
234 | 20.108 | Thermo-mechanically treated bars | Item 20.1080 | 90 | KG |
235 | 20.109 | Design, supply, fabrication, making of suitable foundation and erection of barricade around the tank undertaken for repair, isolating it from other tanks and without disturbing normal operation of other nearby tanks, using structural steel/steel pipes andCGI/AL sheets, clamps, wire rope etc., covering fully from grade level and upto a height of 1.0 mtr. above the Crown of the tanks. Barricading should be designed to withstand natural calamities, like heavy rain fall, seasonal wind load etc. Dismantlingand removal of the barricading materials from the operating area, immediately after completion of tank repairing. [A portion towards the road side to be left open for access to work place. Part of the barricading erected to repair one Tank will be used for repairing of other tanks, if found suitable. For a new tank, 30% barricading will be done with new GI sheets and 70% to be done with GI sheets used in previous tank repair if found suitable for use by EIC]. | |||
236 | 20.11 | Design, supply, fabrication isolating | Item 20.1100 | 1700 | M2 |
237 | 20.111 | "MAKING INLET/OUTLETNOZZLE, MANHOLE, VENT HOLE, ETC. ON ROOF & SHELL: Making hole of required size, fabrication of tank nozzle/neck flange as per code and drawing, providing re-inforcement pad, welding of the same to the tank, making necessary cover & connection & boxing up to complete the work as per instruction of Engineer-In-Charge. | Item 20.1110 | 70 | ID |
238 | 20.112 | Sprinkler coil ( approx length 60-70 m) from old 1.5 to 2.0 inch dia pipe all around the tank to spray FW during hot job in tank | Item 20.1120 | 2 | LS |
239 | 20.113 | Column support for temporary staging of roof structure for top course of shell plate replacement (material: BGR SCOPE) | Item 20.1130 | 10 | EA |
240 | 20.114 | Removal of Oily sludge from tank, cleaning of shell and bottom plates, weld beads for handover to Inspection for thickness gauging and transportation of sludge after collection of disposal at siphoning pond with BGR complexat a distance about 1KM or at melting pit at east side of pump house-I as per direction of EIC. | Item 20.1140 | 100 | M3 |
241 | 20.115 | Foam Pourer overhauling : Scaffolding, Dismantling, shifting to CWS for overhauling and put back into service after overhauling. | Item 20.1150 | 10 | EA |
242 | 20.116 | DISMANTLING & REMOVAL OF FOLDING LADDER INSTALLED AT WLG, SHIFTING THE SAME TO DESIGNATED SITE/SCRAPYARD, INSTALLATION OF NEWLY FABRICATED LADDER AT SITE AFTER PROPER BALANCING, FIXING OF RUBBER PADS AND COUNTERWEIGHTS WITH PROPER FASTENERS TO COMPLETE WORK IN ALL RESPECTS AS PER DIRECTION OF ENGINEER -IN-CHARGE INCLUDING SUPPLY OF TOOLS,TACKLES, LIFTING ARRANGE MENT, LABOUR ETC. | Item 20.1160 | 1 | EA |
243 | 20.117 | STRUCTURAL WORK WITH IOCL (BGR) SUPPLY :- Drawing and shifting of structural materials, Fabrication and Erection of structures,making of all types of joints for partial/total replacement of tank roof supporting structures, curb angles, stairway, hand rails, landing plate-forms, gratings, including supply of all types consumables, machineries, nut-bolts, laborurers, to complete the structure repairing and modification work as per instruction of Engineer-in-charge.[Structural Materials required for replacement of structures will be supplied by IOCL (BGR)]. | |||
244 | 20.118 | Fabrication/Erection of piping support/platforms etc for tank reparing job. | Item 20.1180 | 1 | TO |
245 | 20.119 | Erection of temporary plate lifting stru | Item 20.1190 | 1 | TO |
246 | 20.12 | Fabrication & Erection of new grating, hand railing, ladder etc. including supply and application of Red Oxide Zinc Chromate Primer (excluding cost of structural steel). | Item 20.1200 | 1 | EA |
247 | 20.121 | TACK WELDING (Length of 1 tack is 10 mm) | |||
248 | 20.122 | CS to CS Tack Welding | Item 20.1220 | 120 | EA |
249 | 20.123 | SS to SS Tack Welding | Item 20.1230 | 20 | EA |
250 | 20.124 | Internal cleaning of tank of ANY capacity ,scrapping of the bottom ,side walls,roof,steam coils,roof legs etc.to make it oil free and Supply of semi skilled manpower on per day basis to complete the jobs. UOM = DAY | Item 20.1240 | 100 | EA |
251 | 30 | Part-C: Tank M&I jobs Group-2 (GQ) | |||
252 | 30.001 | DISMANTLING OF FLOATING/FIXED ROOF TANK Retrieving all existing fittings, instruments, foam seals, side railings, dismantling of damaged corroded shell / roof of welded oil storage tank by gas cuttings/cold cutting or any other suitable means as directed by engineer in charge and transporting them to storage point/ scrapyard as designated without disturbing / damaging any portion of existing piping, equipment, tank and complete in all respect with all labour, tools, machineries, supervision etc. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
253 | 30.002 | Roof : Dismantling of complete roof/ structural/ shell/ course/ truss: Retrieving all the existing fittings, instrumentations, side rails, etc. by gas cutting/ cold cuttings directed by Inspection/ site engineer. And shifting of dismantled roof plates, structural etc. to ground (only scrap) to transport and kept properly the same in scrap yard after taking/ recording weight. During the entire job all safety norms to be followed in any case. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete roof plate minus 10% corrosion correction. | Item 30.20 | 15 | TO |
254 | 30.003 | Shell: Dismantling of shell course retrieving/ removing of shell plates. Retrieving all existing manholes/ nozzles/ fittings, instrumentation, side rail etc. by gas cutting/ cold cutting as directed by EIC. Shifting of all scrap to scrap yard/ designated location as per EIC after taking and recording weight. During the entire shifting job, all safety norms to be followed. Note: The measurement of dismantling, shall be calculated based on actual area of shell plate replaced minus 10% correction corrosion. | Item 30.30 | 10 | TO |
255 | 30.004 | Bottom: Dismantling of bottom (Annular) plates completely: Dismantling of bottom (Annular) plates, job involves cutting of bottom plateand shell to bottom plate welding, jacking of shell. And also cutting of annular to sketch plate cutting. Dismantling of bottom (sketch) plate: Dismantling of bottom (sketch) plates by gas cutting and roof to be properly supported and handing over to civil maintenance for tank bottom foundation repair. Shifting of roof support as and when required to facilitate repair/ relaying of foundation. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete bottom sketch plate minus 10% corrosion correction. | Item 30.40 | 4 | TO |
256 | 30.005 | RESTORATION OF STORAGE TANKS Transportation of MS Plate from storage points to worksite, cleaning, cutting in required sizes, rolling, edge preparing, laying shell courses / roof plates for the storage tanks and partial laying above existing bottom after bulged portions to be cut and new plate to be welded, flushing with existing bottom and continuous welding, installation, fixing of various types of manholes, nozzles, flanges, gaskets, orifice assemblies, tapping for gauges and thermowells etc. all types of fittings, level and other fittings retrieved during the dismantling of the corroded roof, fixing back the side railings of dismantled along with the corroded roof plates, and pneumatic, vacuum and other types of testing, flushing, cleaning, pickling of welded joints where required by the specification and completing all such works in all respect for restoring the tanks to the original condition and commissioning as per drawings, specifications, relevant code (API-650/ API-653 IS-803) and instruction of the Engineer-in-Charge and Inspection Manager. Note: The MS plates for bottom, shell, roof, extension plates, reinforcement pads plates for shell manholes, foam dam will be supplied by the owner as per drawing and specifications. All other labour and materials etc. shall be arranged by the contractor at his cost. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
257 | 30.006 | Roof: Fabrication/ erection of fixed/ floating/ fixed cum floating roof from store to work site, cleaning, cutting in required sizes, rolling, edge preparation and handing over to painting agency and recollection for laying shell course/ roof plates (keeping painted surface in side tank) and to be welded new plates/ structural/ truss etc. as per Inspection recommendations as to develop complete new roof for the tank after installation of various types of manholes, nozzles, flanges, orifice assemblies, instrumentation tapping for gauges/ thermo-wells/ walkways/ platform for Operation requirements etc., fittings for all required valves etc. all such articles, which were retrieved before dismantling the old roof. Fixing back all the same in repaired condition if not usable; the side railing, All jobs related to tank roof replacement to be completed including all NDT as per codes in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, relevant latest codes (per API-650/653/IS:803) and to the satisfaction of inspection/ production and engineer-in-charge. | Item 30.60 | 15 | TO |
258 | 30.007 | Shell: Installation of shell plates along with all nozzles connected to inlet/ outlet lines, drains, roof drain connection as per original drawing and all other existing fittings, instrumentations, side rails, etc. to bring back the tank in original condition and to the satisfaction of Inspection/ Operation and Engineer-in-charge. All weld joints conforming to NDT, such as DP test, Pneumatic test; joints radiography etc. As per code API-650/653 and IS-803 Note: Radiography and DP test shall be paid as separate item. | Item 30.70 | 10 | TO |
259 | 30.008 | Bottom: Fabrication/ erection/ laying of bottom/ annular plates 10/14/16 mm thick: Transport of MS Plates from store to work site, fabrication, erection, overlaying and welding of bottom/ annular plates keeping painted surface towards bituminous pad. Making slot in tank shell, insertion of annular plate, shell to bottom welding from both side of shell, testing of butt/ lap joints by soap solutions under pneumatic test, chalk-diesel test of shell to bottom annular plate all around. Job involves-Edge preparation; fixing of backing strip; welding; NDT i.e. performing DP test, pneumatic test; joints radiography etc. misc. job involves. Lifting of tank shell by jacking. Hydraulically jack up of tank shell to be done in case of annular plate replacement. All weld joints preparation by buffing to facilitate NDT, shell window cutting (of appropriate size) in 1st shell course for insertion of bottom plates and reposition and welding the same after completion of job. Welding of shell window after preheating the plate. Proper stiffening/ support to be provided in cut out plate to prevent deformation. All jobs related to tank bottom replacement to be completed in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, relevant latest codes (API-650/653; IS-803) and to the satisfaction of Inspection/ Operation and Engineer-in-charge. Note: Radiography and DP test shall be paid as separate item. Fabrication/ erection/ laying of bottom sketch plates 6/8 mm thick: Transport of MS Plates from store to work site, fabrication, erection, overlaying, edge preparation/ fixing of backing strip/ welding of bottom sketch plates keeping painted surface towards bituminous pad. All weld joints conforming to NDT, such as DP test, pneumatic test, vacuum test, joints radiography etc. as per code API-650/653; IS-803. Misc. jobs involves all weld joints preparation by buffing to facilitate NDT, preparation of mud dam, conducting pneumatic test as per inspection recommendation. All jobs related to tank bottom replacement to be completed in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, related latest codes (API-650/ 653; IS 803) and to the satisfaction of inspection/ production and engineer in charge. Note: Radiography and DP test shall be paid as separate item. | Item 30.80 | 4 | TO |
260 | 30.009 | PNEUMATIC TEST OF TANK BOTTOM / ROOF | Item 30.90 | 42 | M2 |
261 | 30.01 | HYDRAULIC TESTING OF THE TANK The job includes hydraulic testing of the tank to identify leaks including all connected jobs like blinding / de-blinding, temporary piping arrangements to fill in and empty out the water and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables, supervision, machineries, instruments (duly calibrated) etc. Repetitive hydrotesting of tank to be carried out if required on account of repair or for roof floatation test as per Inspection requirement. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
262 | 30.011 | ABOVE 500 UPTO 1000 M3 | Item 30.110 | 1 | EA |
263 | 30.012 | Above 1000 up to 2000 M3 | Item 30.120 | 1 | EA |
264 | 30.013 | Above 2000 up to 3000 M3 | Item 30.130 | 1 | EA |
265 | 30.014 | Above 3000 up to 4000 M3 | Item 30.140 | 1 | EA |
266 | 30.015 | Above 4000 up to 5000 M3 | Item 30.150 | 1 | EA |
267 | 30.016 | Above 5000 up to 6000 M3 | Item 30.160 | 1 | EA |
268 | 30.017 | Above 9000 up to 10000 M3 | Item 30.170 | 1 | EA |
269 | 30.018 | Above 10000 M3 | Item 30.180 | 1 | EA |
270 | 30.019 | CAPACITY UPTO 500 M3 | Item 30.190 | 1 | EA |
271 | 30.02 | FABRICATION/FIXING OF GAUGE WELL PIPE | Item 30.200 | 1 | EA |
272 | 30.021 | EMERGENCY DRAIN REPLACEMENT | Item 30.210 | 1 | EA |
273 | 30.022 | RIM VENT / BLEEDER VENT REPLACEMENT Cutting / removal of existing rim vent / bleeder vent and fabrication, fixing, installation of the same, fixing proper support, including all testing and supply of brass fittings (for bleeder vent) and complete in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables, equipment, machineries and supervision etc. | |||
274 | 30.023 | Rim vent (4" size) | Item 30.230 | 1 | EA |
275 | 30.024 | Bleeder vent (6" Size) | Item 30.240 | 1 | EA |
276 | 30.025 | REPLACEMENT OF SWIVEL TYPE FLOATING ROOF DRAIN Complete replacement of roof drain / swivel joint after cutting, removing, dismantling the same, fabrication, erection, laying, aligning and welding of swivel joint type roof drain of with all types of clamping, bolting, as required, providing proper counter weight and hydrostatic testing of swivel joints including revisioning/ rectifications if required, including supply of labour, tools and tackles, equipment , machineries and complete the job in all respect to the entire satisfaction the Engineer-in-charge (Material is in the scope of IOCL's supply). | |||
277 | 30.026 | 80 mm | Item 30.260 | 1 | EA |
278 | 30.027 | 100 mm | Item 30.270 | 1 | EA |
279 | 30.028 | 150 mm | Item 30.280 | 1 | EA |
280 | 30.029 | 200 mm | Item 30.290 | 1 | EA |
281 | 30.03 | CLEANING MOPPING OF TANKS | Item 30.300 | 77 | M2 |
282 | 30.031 | CALIBRATION OF TANKS Calibration of the tank as per IS-2007 and IS-2008, preparing the calibration sheets on standard forms showing strapping details, ca lculation details and other relevant details including bottom calibration after taking measurement of dead wood etc. and certified by CPWD or Weights and Measures Department or any other equivalent government authority with all labour, tools & tackles, consu mables, instruments (duly calibrated) and delivery of calibration charts to the Engineer-in-Charge. Fee for calibration of tank to be paid separately as per actuals against valid documents. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be arranged/ paid separately. | |||
283 | 30.032 | ABOVE 500 UPTO 1000 M3 | Item 30.320 | 1 | EA |
284 | 30.033 | Above 1000 upto 2000 M3 | Item 30.330 | 1 | EA |
285 | 30.034 | Above 2000 upto 3000 M3 | Item 30.340 | 1 | EA |
286 | 30.035 | Above 3000 upto 4000 M3 | Item 30.350 | 1 | EA |
287 | 30.036 | Above 4000 upto 5000 M3 | Item 30.360 | 1 | EA |
288 | 30.037 | Above 5000 upto 6000 M3 | Item 30.370 | 1 | EA |
289 | 30.038 | Above 7500 upto 9000 M3 | Item 30.380 | 1 | EA |
290 | 30.039 | Above 9000 upto 10000 M3 | Item 30.390 | 1 | EA |
291 | 30.04 | Above 10000 M3 | Item 30.400 | 1 | EA |
292 | 30.041 | CAPACITY UPTO 500 M3 | Item 30.410 | 1 | EA |
293 | 30.042 | FOAM POURER NOZZLE ON TANK TOP SHELL The job includes cutting, rolling, fabrication, fixing, aligning and welding of shell nozzle in the top shell course of the tank along with fixing of reinforcement pad, nozzle flanges with the applicable requirements of API-650. The scope also includes fixing of foam deflector inside the tank and all the testing like radiography, DP, testing of reinforcement pad etc. and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
294 | 30.043 | 80 mm | Item 30.430 | 1 | EA |
295 | 30.044 | 100 mm | Item 30.440 | 1 | EA |
296 | 30.045 | 150 mm | Item 30.450 | 1 | EA |
297 | 30.046 | 200 mm | Item 30.460 | 1 | EA |
298 | 30.047 | 250 mm | Item 30.470 | 1 | EA |
299 | 30.048 | 300 mm | Item 30.480 | 1 | EA |
300 | 30.049 | REPLACEMENT ROOF SUPPORT LEGS Cutting/ removal of corroded existing pipe sleeves/ support legs/ pontoon and fabrication, fitting, fixing of pipe sleeve (100 mm. N.B.) with new pad plates and stiffener plate and providing support leg (adjustable type of 80 mm N.B.) with cotter pin of 40 mm dia. U-type drain hole, caps etc. and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
301 | 30.05 | Pipe sleeve | Item 30.500 | 6 | EA |
302 | 30.051 | Support Leg | Item 30.510 | 6 | EA |
303 | 30.052 | REPAIRING OF CORRODED/ DAMAGED STEAM HEATING COIL Transportation of material from storage points to work site, cutting, bending, of pipe to 180 degree or as required, threading, edge repairing, welding and laying on supports, welded and threaded pipelines of different pressure and temperature ratings, installation/ fixing of all types of valves, flanges, gaskets, orifice assemblies, all types of fittings like elbows reducers, tees, drains, funnels etc. tapping's for pressure gauges and thermowells, flushing, cleaning and pickling of welded joints where required by specification, erection on all types of supports, fixing of all types of lugs, strips, U-clamps, and hydrostatic, pneumatic, vacuum, NDT and other type of testing and completing all such work in all respect for commissioning as per drawings, specification and and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | Item 30.520 | 8 | M |
304 | 30.053 | FABRICATION AND ERECTION OF CENTRAL DRUM/ MANHOLE | Item 30.530 | 1 | EA |
305 | 30.054 | BOTTOM DRAW-OFF SUMP & ALLIED JOBS | Item 30.540 | 1 | EA |
306 | 30.055 | FABRICATION/ ERECTION OF SPLASH BOARD | Item 30.550 | 1 | EA |
307 | 30.056 | TANK MISCELLANEOUS JOBS The job includes checking and rectification of earthing connection for electrical continuity, checking and rectification of anchor bolts, opening and fixing of level indicator with all accessories / goose neck etc., chipping of pre-mix carpeting of tank foundation at desire places and complete all such work in all respect as per direction of Engineer-in-Charge. The scope also includes installation of Flame Arrestor / Breather valves (grinding, buffing) etc. | |||
308 | 30.057 | Installation of flame arrestor/ breather valve. | Item 30.570 | 1 | EA |
309 | 30.058 | Fixing/ adjusting of anchor bolts. | Item 30.580 | 3 | EA |
310 | 30.059 | Fixing of earthing connections/ misc. welds for cleats, supports for level indicator and any other small patch welding. | Item 30.590 | 1 | EA |
311 | 30.06 | Fixing of level indicator with all accessories/ goose neck etc. | Item 30.600 | 1 | EA |
312 | 30.061 | HYDRAULIC TESTING OF STEAM COIL | Item 30.610 | 56 | EA |
313 | 30.062 | DISMANTLING OF STEAM HEATING COIL | Item 30.620 | 32 | M |
314 | 30.063 | REVISIONING OF SWIVEL JOINT TYPE ROOF DRAIN The job involves revisioning of roof drain, opening of connected flange joints, cleaning of the swivel joints and drain sumps of tanks with wire brushes/ water, replacement of gaskets, packing seals, bearing balls etc. and finally boxing up of the joint. The job includes hydro testing if required and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
315 | 30.064 | Dia 3" Roof Drain | Item 30.640 | 1 | EA |
316 | 30.065 | Dia 4" Roof Drain | Item 30.650 | 1 | EA |
317 | 30.066 | Dia 6" Roof Drain | Item 30.660 | 1 | EA |
318 | 30.067 | TESTING OF ROOF DRAIN SYSTEM OF TANK Hydro-testing of swivel joints including opening of flanges, blinding if required, dismantling of swivel joint, installation of hydraulic pump and pressure gauge, testing at pressure suggested by inspection and as per instruction of engineer-in-charge, rotation testing of all swivel joints including piping and NRV in assembled condition. All labour, tools, tackles, machinery, consumables, instruments will be in the scope of contractor. "O" rings and steel balls required for above job will be in the owner's scope. | |||
319 | 30.068 | Dia 3" Roof Drain | Item 30.680 | 1 | EA |
320 | 30.069 | Dia 4" Roof Drain | Item 30.690 | 1 | EA |
321 | 30.07 | Dia 6" Roof Drain | Item 30.700 | 1 | EA |
322 | 30.071 | REPLACEMENT OF FIRE WATER SPRINKLER RING OF OIL STORAGE TANKS AND FABRICATION OF NEW SYSTEM Dismantling of complete cooling ring by cold cutting from existing location (from height 10-15 meter) of the tank and lowering down to ground level, transportation of new pipe from owners storage point to place of work. Fabrication of sprinkler piping with flange joints at every 20 meter interval, (this includes bending, cutting, grinding, bevelling, fabrication, providing supports, welding of flanges as per site requirement, welding of sockets for sprinklers) Erection, laying of firewater sprinkler system (cooling ring) in original shape and position including sockets with sprinkler welding at suitable location as per inspection and safety department recommendation. Testing of all joints, section before erection, jointing these pipes with 8"/6" vertical header by equal tee and flanged end connection, testing and commissioning the system, fabrication, erection of support brackets and U-clamps for ring wherever required with owners supplied material, complete the job in all respect including supply of all equipment (welding machine, pipe bending machine, lifting tools and tackles, grinding machines etc.). Consumables such as electrodes, grinding wheels etc. as per specification and direction of EIC. This also includes salvaging of sprinklers from old piping, fabrication of mitres etc. Shifting of all scrap to scrap yard shall be in the scope of contractor. This also includes cutting and rebuilding of dyke if required for movement. Note: 1. The contractor shall be paid on the actual measurement on running meter basis of sprinkler system. 2. If the item is operated when tank is in operation then no hot job shall be permissible at site. The ring system shall be fabricated with flanges at ends of bend pipe and to be erected and boxed up. However, if it is carried out during M&I of tank then hot job may be permissible. The maintenance philosophy shall be decided by EIC at the time of execution. The rate of item shall remain unchanged for both maintenance philosophy. 3. The above item is applicable for replacement of fire water sprinkler ring only. 4. Payment for vertical riser pipe/ horizontal header (other than ring portion) shall be paid in separate item under this SOR. 5. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Note: Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
323 | 30.072 | Pipe - Dia 3" | Item 30.720 | 1 | M |
324 | 30.073 | Pipe - Dia 4" | Item 30.730 | 1 | M |
325 | 30.074 | Pipe - Dia 6" | Item 30.740 | 1 | M |
326 | 30.075 | REINFORCEMENT OF EXISTING WELD JOINT (E-6013) | Item 30.750 | 6 | M |
327 | 30.076 | REINFORCEMENT OF EXISTING WELD JOINT (E-7018) | Item 30.760 | 6 | M |
328 | 30.077 | STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the areas specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding material including supply of all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-Charge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs | |||
329 | 30.078 | Upto 6 M | Item 30.780 | 84 | M2 |
330 | 30.079 | Above 6 m upto 10 m | Item 30.790 | 490 | M2 |
331 | 30.08 | Above 10 m upto 20 m | Item 30.800 | 490 | M2 |
332 | 30.081 | Intermediate plate form | Item 30.810 | 84 | M2 |
333 | 30.082 | Volumetric (For inside Furnace/ Vessels etc.) (For volumetric scaffolding beyond 10 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 10 meters.) | Item 30.820 | 28 | M3 |
334 | 30.083 | WELDING OF CS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding of CS plates including cutting / grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools & tackles, supervision as per technical specifications, drawings and complete the job in all respect as per direction of the Engineer-in-Charge. Note: Heat treatment and other NDT charges shall be paid extra. | |||
335 | 30.084 | Upto 3mm thick | Item 30.840 | 17 | M |
336 | 30.085 | Above 3mm & upto 5mm thick. | Item 30.850 | 17 | M |
337 | 30.086 | Above 5mm & upto 6mm thick | Item 30.860 | 17 | M |
338 | 30.087 | Above 6mm & upto 7mm thick | Item 30.870 | 17 | M |
339 | 30.088 | Above 7mm & upto 9mm thick. | Item 30.880 | 17 | M |
340 | 30.089 | Above 9mm & upto 11mm thick | Item 30.890 | 28 | M |
341 | 30.09 | Above 11mm & upto 12.7mm thick | Item 30.900 | 20 | M |
342 | 30.091 | INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, gaskets, nut bolts etc. either from owner's storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ ring properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing strips, complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. | |||
343 | 30.092 | For Valves (other than RTJ) | Item 30.920 | 62 | KG |
344 | 30.093 | REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. | Item 30.930 | 17 | KG |
345 | 30.094 | FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DAVITS / STAIR CASE ETC. | Item 30.940 | 1 | TO |
346 | 30.095 | DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC. | Item 30.950 | 1 | TO |
347 | 30.096 | CS weld deposit for tank surface (upto 2.5mm depth) | Item 30.960 | 84 | M2 |
348 | 30.097 | GOOSE NECK CLEANING Cleaning of goose neck and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
349 | 30.098 | DIA 6 INCH | Item 30.980 | 1 | EA |
350 | 30.099 | DIA 8 INCH | Item 30.990 | 1 | EA |
351 | 30.1 | DIA 10" | Item 30.1000 | 1 | EA |
352 | 30.101 | HOT/ COLD BENDING OF PIPES FOR SPRINKLER SYSTEM ON THE TANK | Item 30.1010 | 56 | IM |
353 | 30.102 | REVISIONING OF GUIDE ROLLERS IN TANKS Revisioning of guide rollers in tanks and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | Item 30.1020 | 14 | EA |
354 | 30.103 | All kinds of soil | Item 30.1030 | 56 | M3 |
355 | 30.104 | Cement mortar 1:4 (1 cement : 4 coarse sand) | Item 30.1040 | 56 | M2 |
356 | 30.105 | Filling available excavated earth (excluding rock ) in trenches, plinth, sides of foundations etc., in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m | Item 30.1050 | 70 | M3 |
357 | 30.106 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | Item 30.1060 | 200 | M3 |
358 | 30.107 | Foundations, footings, bases of columns etc. for mass concrete. | Item 30.1070 | 196 | M2 |
359 | 30.108 | Thermo-mechanically treated bars | Item 30.1080 | 140 | KG |
360 | 30.109 | Design, supply, fabrication, making of suitable foundation and erection of barricade around the tank undertaken for repair, isolating it from other tanks and without disturbing normal operation of other nearby tanks, using structural steel/steel pipes andCGI/AL sheets, clamps, wire rope etc., covering fully from grade level and upto a height of 1.0 mtr. above the Crown of the tanks. Barricading should be designed to withstand natural calamities, like heavy rain fall, seasonal wind load etc. Dismantlingand removal of the barricading materials from the operating area, immediately after completion of tank repairing. [A portion towards the road side to be left open for access to work place. Part of the barricading erected to repair one Tank will be used for repairing of other tanks, if found suitable. For a new tank, 30% barricading will be done with new GI sheets and 70% to be done with GI sheets used in previous tank repair if found suitable for use by EIC]. | |||
361 | 30.11 | Design, supply, fabrication isolating | Item 30.1100 | 1600 | M2 |
362 | 30.111 | "MAKING INLET/OUTLETNOZZLE, MANHOLE, VENT HOLE, ETC. ON ROOF & SHELL: Making hole of required size, fabrication of tank nozzle/neck flange as per code and drawing, providing re-inforcement pad, welding of the same to the tank, making necessary cover & connection & boxing up to complete the work as per instruction of Engineer-In-Charge. | Item 30.1110 | 100 | ID |
363 | 30.112 | Sprinkler coil ( approx length 60-70 m) from old 1.5 to 2.0 inch dia pipe all around the tank to spray FW during hot job in tank | Item 30.1120 | 2 | LS |
364 | 30.113 | Column support for temporary staging of roof structure for top course of shell plate replacement (material: BGR SCOPE) | Item 30.1130 | 18 | EA |
365 | 30.114 | Removal of Oily sludge from tank, cleaning of shell and bottom plates, weld beads for handover to Inspection for thickness gauging and transportation of sludge after collection of disposal at siphoning pond with BGR complexat a distance about 1KM or at melting pit at east side of pump house-I as per direction of EIC. | Item 30.1140 | 260 | M3 |
366 | 30.115 | Foam Pourer overhauling : Scaffolding, Dismantling, shifting to CWS for overhauling and put back into service after overhauling. | Item 30.1150 | 18 | EA |
367 | 30.116 | DISMANTLING & REMOVAL OF FOLDING LADDER INSTALLED AT WLG, SHIFTING THE SAME TO DESIGNATED SITE/SCRAPYARD, INSTALLATION OF NEWLY FABRICATED LADDER AT SITE AFTER PROPER BALANCING, FIXING OF RUBBER PADS AND COUNTERWEIGHTS WITH PROPER FASTENERS TO COMPLETE WORK IN ALL RESPECTS AS PER DIRECTION OF ENGINEER -IN-CHARGE INCLUDING SUPPLY OF TOOLS,TACKLES, LIFTING ARRANGE MENT, LABOUR ETC. | Item 30.1160 | 1 | EA |
368 | 30.117 | STRUCTURAL WORK WITH IOCL (BGR) SUPPLY :- Drawing and shifting of structural materials, Fabrication and Erection of structures,making of all types of joints for partial/total replacement of tank roof supporting structures, curb angles, stairway, hand rails, landing plate-forms, gratings, including supply of all types consumables, machineries, nut-bolts, laborurers, to complete the structure repairing and modification work as per instruction of Engineer-in-charge.[Structural Materials required for replacement of structures will be supplied by IOCL (BGR)]. | |||
369 | 30.118 | Fabrication/Erection of piping support/platforms etc for tank reparing job. | Item 30.1180 | 1 | TO |
370 | 30.119 | Erection of temporary plate lifting stru | Item 30.1190 | 1 | TO |
371 | 30.12 | Fabrication & Erection of new grating, hand railing, ladder etc. including supply and application of Red Oxide Zinc Chromate Primer (excluding cost of structural steel). | Item 30.1200 | 1 | EA |
372 | 30.121 | TACK WELDING (Length of 1 tack is 10 mm) | |||
373 | 30.122 | CS to CS Tack Welding | Item 30.1220 | 180 | EA |
374 | 30.123 | SS to SS Tack Welding | Item 30.1230 | 60 | EA |
375 | 30.124 | Internal cleaning of tank of ANY capacity ,scrapping of the bottom ,side walls,roof,steam coils,roof legs etc.to make it oil free and Supply of semi skilled manpower on per day basis to complete the jobs. UOM = DAY | Item 30.1240 | 150 | EA |
376 | 40 | Part-D: Tank M&I jobs Group-2 (GO) | |||
377 | 40.001 | DISMANTLING OF FLOATING/FIXED ROOF TANK Retrieving all existing fittings, instruments, foam seals, side railings, dismantling of damaged corroded shell / roof of welded oil storage tank by gas cuttings/cold cutting or any other suitable means as directed by engineer in charge and transporting them to storage point/ scrapyard as designated without disturbing / damaging any portion of existing piping, equipment, tank and complete in all respect with all labour, tools, machineries, supervision etc. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
378 | 40.002 | Roof : Dismantling of complete roof/ structural/ shell/ course/ truss: Retrieving all the existing fittings, instrumentations, side rails, etc. by gas cutting/ cold cuttings directed by Inspection/ site engineer. And shifting of dismantled roof plates, structural etc. to ground (only scrap) to transport and kept properly the same in scrap yard after taking/ recording weight. During the entire job all safety norms to be followed in any case. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete roof plate minus 10% corrosion correction. | Item 40.20 | 8 | TO |
379 | 40.003 | Shell: Dismantling of shell course retrieving/ removing of shell plates. Retrieving all existing manholes/ nozzles/ fittings, instrumentation, side rail etc. by gas cutting/ cold cutting as directed by EIC. Shifting of all scrap to scrap yard/ designated location as per EIC after taking and recording weight. During the entire shifting job, all safety norms to be followed. Note: The measurement of dismantling, shall be calculated based on actual area of shell plate replaced minus 10% correction corrosion. | Item 40.30 | 6 | TO |
380 | 40.004 | Bottom: Dismantling of bottom (Annular) plates completely: Dismantling of bottom (Annular) plates, job involves cutting of bottom plateand shell to bottom plate welding, jacking of shell. And also cutting of annular to sketch plate cutting. Dismantling of bottom (sketch) plate: Dismantling of bottom (sketch) plates by gas cutting and roof to be properly supported and handing over to civil maintenance for tank bottom foundation repair. Shifting of roof support as and when required to facilitate repair/ relaying of foundation. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete bottom sketch plate minus 10% corrosion correction. | Item 40.40 | 2 | TO |
381 | 40.005 | RESTORATION OF STORAGE TANKS Transportation of MS Plate from storage points to worksite, cleaning, cutting in required sizes, rolling, edge preparing, laying shell courses / roof plates for the storage tanks and partial laying above existing bottom after bulged portions to be cut and new plate to be welded, flushing with existing bottom and continuous welding, installation, fixing of various types of manholes, nozzles, flanges, gaskets, orifice assemblies, tapping for gauges and thermowells etc. all types of fittings, level and other fittings retrieved during the dismantling of the corroded roof, fixing back the side railings of dismantled along with the corroded roof plates, and pneumatic, vacuum and other types of testing, flushing, cleaning, pickling of welded joints where required by the specification and completing all such works in all respect for restoring the tanks to the original condition and commissioning as per drawings, specifications, relevant code (API-650/ API-653 IS-803) and instruction of the Engineer-in-Charge and Inspection Manager. Note: The MS plates for bottom, shell, roof, extension plates, reinforcement pads plates for shell manholes, foam dam will be supplied by the owner as per drawing and specifications. All other labour and materials etc. shall be arranged by the contractor at his cost. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
382 | 40.006 | Roof: Fabrication/ erection of fixed/ floating/ fixed cum floating roof from store to work site, cleaning, cutting in required sizes, rolling, edge preparation and handing over to painting agency and recollection for laying shell course/ roof plates (keeping painted surface in side tank) and to be welded new plates/ structural/ truss etc. as per Inspection recommendations as to develop complete new roof for the tank after installation of various types of manholes, nozzles, flanges, orifice assemblies, instrumentation tapping for gauges/ thermo-wells/ walkways/ platform for Operation requirements etc., fittings for all required valves etc. all such articles, which were retrieved before dismantling the old roof. Fixing back all the same in repaired condition if not usable; the side railing, All jobs related to tank roof replacement to be completed including all NDT as per codes in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, relevant latest codes (per API-650/653/IS:803) and to the satisfaction of inspection/ production and engineer-in-charge. | Item 40.60 | 8 | TO |
383 | 40.007 | Shell: Installation of shell plates along with all nozzles connected to inlet/ outlet lines, drains, roof drain connection as per original drawing and all other existing fittings, instrumentations, side rails, etc. to bring back the tank in original condition and to the satisfaction of Inspection/ Operation and Engineer-in-charge. All weld joints conforming to NDT, such as DP test, Pneumatic test; joints radiography etc. As per code API-650/653 and IS-803 Note: Radiography and DP test shall be paid as separate item. | Item 40.70 | 6 | TO |
384 | 40.008 | Bottom: Fabrication/ erection/ laying of bottom/ annular plates 10/14/16 mm thick: Transport of MS Plates from store to work site, fabrication, erection, overlaying and welding of bottom/ annular plates keeping painted surface towards bituminous pad. Making slot in tank shell, insertion of annular plate, shell to bottom welding from both side of shell, testing of butt/ lap joints by soap solutions under pneumatic test, chalk-diesel test of shell to bottom annular plate all around. Job involves-Edge preparation; fixing of backing strip; welding; NDT i.e. performing DP test, pneumatic test; joints radiography etc. misc. job involves. Lifting of tank shell by jacking. Hydraulically jack up of tank shell to be done in case of annular plate replacement. All weld joints preparation by buffing to facilitate NDT, shell window cutting (of appropriate size) in 1st shell course for insertion of bottom plates and reposition and welding the same after completion of job. Welding of shell window after preheating the plate. Proper stiffening/ support to be provided in cut out plate to prevent deformation. All jobs related to tank bottom replacement to be completed in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, relevant latest codes (API-650/653; IS-803) and to the satisfaction of Inspection/ Operation and Engineer-in-charge. Note: Radiography and DP test shall be paid as separate item. Fabrication/ erection/ laying of bottom sketch plates 6/8 mm thick: Transport of MS Plates from store to work site, fabrication, erection, overlaying, edge preparation/ fixing of backing strip/ welding of bottom sketch plates keeping painted surface towards bituminous pad. All weld joints conforming to NDT, such as DP test, pneumatic test, vacuum test, joints radiography etc. as per code API-650/653; IS-803. Misc. jobs involves all weld joints preparation by buffing to facilitate NDT, preparation of mud dam, conducting pneumatic test as per inspection recommendation. All jobs related to tank bottom replacement to be completed in all respect for restoring the tank in original condition and commissioning as per the drawing, specifications, related latest codes (API-650/ 653; IS 803) and to the satisfaction of inspection/ production and engineer in charge. Note: Radiography and DP test shall be paid as separate item. | Item 40.80 | 2 | TO |
385 | 40.009 | PNEUMATIC TEST OF TANK BOTTOM / ROOF | Item 40.90 | 18 | M2 |
386 | 40.01 | HYDRAULIC TESTING OF THE TANK The job includes hydraulic testing of the tank to identify leaks including all connected jobs like blinding / de-blinding, temporary piping arrangements to fill in and empty out the water and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables, supervision, machineries, instruments (duly calibrated) etc. Repetitive hydrotesting of tank to be carried out if required on account of repair or for roof floatation test as per Inspection requirement. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
387 | 40.011 | ABOVE 500 UPTO 1000 M3 | Item 40.110 | 1 | EA |
388 | 40.012 | Above 1000 up to 2000 M3 | Item 40.120 | 1 | EA |
389 | 40.013 | Above 2000 up to 3000 M3 | Item 40.130 | 1 | EA |
390 | 40.014 | Above 3000 up to 4000 M3 | Item 40.140 | 1 | EA |
391 | 40.015 | Above 4000 up to 5000 M3 | Item 40.150 | 1 | EA |
392 | 40.016 | Above 5000 up to 6000 M3 | Item 40.160 | 1 | EA |
393 | 40.017 | Above 9000 up to 10000 M3 | Item 40.170 | 1 | EA |
394 | 40.018 | Above 10000 M3 | Item 40.180 | 1 | EA |
395 | 40.019 | CAPACITY UPTO 500 M3 | Item 40.190 | 1 | EA |
396 | 40.02 | FABRICATION/FIXING OF GAUGE WELL PIPE | Item 40.200 | 1 | EA |
397 | 40.021 | EMERGENCY DRAIN REPLACEMENT | Item 40.210 | 1 | EA |
398 | 40.022 | RIM VENT / BLEEDER VENT REPLACEMENT Cutting / removal of existing rim vent / bleeder vent and fabrication, fixing, installation of the same, fixing proper support, including all testing and supply of brass fittings (for bleeder vent) and complete in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables, equipment, machineries and supervision etc. | |||
399 | 40.023 | Rim vent (4" size) | Item 40.230 | 1 | EA |
400 | 40.024 | Bleeder vent (6" Size) | Item 40.240 | 1 | EA |
401 | 40.025 | REPLACEMENT OF SWIVEL TYPE FLOATING ROOF DRAIN Complete replacement of roof drain / swivel joint after cutting, removing, dismantling the same, fabrication, erection, laying, aligning and welding of swivel joint type roof drain of with all types of clamping, bolting, as required, providing proper counter weight and hydrostatic testing of swivel joints including revisioning/ rectifications if required, including supply of labour, tools and tackles, equipment , machineries and complete the job in all respect to the entire satisfaction the Engineer-in-charge (Material is in the scope of IOCL's supply). | |||
402 | 40.026 | 80 mm | Item 40.260 | 1 | EA |
403 | 40.027 | 100 mm | Item 40.270 | 1 | EA |
404 | 40.028 | 150 mm | Item 40.280 | 1 | EA |
405 | 40.029 | 200 mm | Item 40.290 | 1 | EA |
406 | 40.03 | CLEANING MOPPING OF TANKS | Item 40.300 | 20 | M2 |
407 | 40.031 | CALIBRATION OF TANKS Calibration of the tank as per IS-2007 and IS-2008, preparing the calibration sheets on standard forms showing strapping details, ca lculation details and other relevant details including bottom calibration after taking measurement of dead wood etc. and certified by CPWD or Weights and Measures Department or any other equivalent government authority with all labour, tools & tackles, consu mables, instruments (duly calibrated) and delivery of calibration charts to the Engineer-in-Charge. Fee for calibration of tank to be paid separately as per actuals against valid documents. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be arranged/ paid separately. | |||
408 | 40.032 | ABOVE 500 UPTO 1000 M3 | Item 40.320 | 1 | EA |
409 | 40.033 | Above 1000 upto 2000 M3 | Item 40.330 | 1 | EA |
410 | 40.034 | Above 2000 upto 3000 M3 | Item 40.340 | 1 | EA |
411 | 40.035 | Above 3000 upto 4000 M3 | Item 40.350 | 1 | EA |
412 | 40.036 | Above 4000 upto 5000 M3 | Item 40.360 | 1 | EA |
413 | 40.037 | Above 5000 upto 6000 M3 | Item 40.370 | 1 | EA |
414 | 40.038 | Above 7500 upto 9000 M3 | Item 40.380 | 1 | EA |
415 | 40.039 | Above 9000 upto 10000 M3 | Item 40.390 | 1 | EA |
416 | 40.04 | Above 10000 M3 | Item 40.400 | 1 | EA |
417 | 40.041 | CAPACITY UPTO 500 M3 | Item 40.410 | 1 | EA |
418 | 40.042 | FOAM POURER NOZZLE ON TANK TOP SHELL The job includes cutting, rolling, fabrication, fixing, aligning and welding of shell nozzle in the top shell course of the tank along with fixing of reinforcement pad, nozzle flanges with the applicable requirements of API-650. The scope also includes fixing of foam deflector inside the tank and all the testing like radiography, DP, testing of reinforcement pad etc. and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
419 | 40.043 | 80 mm | Item 40.430 | 1 | EA |
420 | 40.044 | 100 mm | Item 40.440 | 1 | EA |
421 | 40.045 | 150 mm | Item 40.450 | 1 | EA |
422 | 40.046 | 200 mm | Item 40.460 | 1 | EA |
423 | 40.047 | 250 mm | Item 40.470 | 1 | EA |
424 | 40.048 | 300 mm | Item 40.480 | 1 | EA |
425 | 40.049 | REPLACEMENT ROOF SUPPORT LEGS Cutting/ removal of corroded existing pipe sleeves/ support legs/ pontoon and fabrication, fitting, fixing of pipe sleeve (100 mm. N.B.) with new pad plates and stiffener plate and providing support leg (adjustable type of 80 mm N.B.) with cotter pin of 40 mm dia. U-type drain hole, caps etc. and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
426 | 40.05 | Pipe sleeve | Item 40.500 | 2 | EA |
427 | 40.051 | Support Leg | Item 40.510 | 2 | EA |
428 | 40.052 | REPAIRING OF CORRODED/ DAMAGED STEAM HEATING COIL Transportation of material from storage points to work site, cutting, bending, of pipe to 180 degree or as required, threading, edge repairing, welding and laying on supports, welded and threaded pipelines of different pressure and temperature ratings, installation/ fixing of all types of valves, flanges, gaskets, orifice assemblies, all types of fittings like elbows reducers, tees, drains, funnels etc. tapping's for pressure gauges and thermowells, flushing, cleaning and pickling of welded joints where required by specification, erection on all types of supports, fixing of all types of lugs, strips, U-clamps, and hydrostatic, pneumatic, vacuum, NDT and other type of testing and completing all such work in all respect for commissioning as per drawings, specification and and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | Item 40.520 | 4 | M |
429 | 40.053 | FABRICATION AND ERECTION OF CENTRAL DRUM/ MANHOLE | Item 40.530 | 1 | EA |
430 | 40.054 | BOTTOM DRAW-OFF SUMP & ALLIED JOBS | Item 40.540 | 1 | EA |
431 | 40.055 | FABRICATION/ ERECTION OF SPLASH BOARD | Item 40.550 | 1 | EA |
432 | 40.056 | TANK MISCELLANEOUS JOBS The job includes checking and rectification of earthing connection for electrical continuity, checking and rectification of anchor bolts, opening and fixing of level indicator with all accessories / goose neck etc., chipping of pre-mix carpeting of tank foundation at desire places and complete all such work in all respect as per direction of Engineer-in-Charge. The scope also includes installation of Flame Arrestor / Breather valves (grinding, buffing) etc. | |||
433 | 40.057 | Installation of flame arrestor/ breather valve. | Item 40.570 | 1 | EA |
434 | 40.058 | Fixing/ adjusting of anchor bolts. | Item 40.580 | 1 | EA |
435 | 40.059 | Fixing of earthing connections/ misc. welds for cleats, supports for level indicator and any other small patch welding. | Item 40.590 | 1 | EA |
436 | 40.06 | Fixing of level indicator with all accessories/ goose neck etc. | Item 40.600 | 1 | EA |
437 | 40.061 | HYDRAULIC TESTING OF STEAM COIL | Item 40.610 | 15 | EA |
438 | 40.062 | DISMANTLING OF STEAM HEATING COIL | Item 40.620 | 14 | M |
439 | 40.063 | REVISIONING OF SWIVEL JOINT TYPE ROOF DRAIN The job involves revisioning of roof drain, opening of connected flange joints, cleaning of the swivel joints and drain sumps of tanks with wire brushes/ water, replacement of gaskets, packing seals, bearing balls etc. and finally boxing up of the joint. The job includes hydro testing if required and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
440 | 40.064 | Dia 3" Roof Drain | Item 40.640 | 1 | EA |
441 | 40.065 | Dia 4" Roof Drain | Item 40.650 | 1 | EA |
442 | 40.066 | Dia 6" Roof Drain | Item 40.660 | 1 | EA |
443 | 40.067 | TESTING OF ROOF DRAIN SYSTEM OF TANK Hydro-testing of swivel joints including opening of flanges, blinding if required, dismantling of swivel joint, installation of hydraulic pump and pressure gauge, testing at pressure suggested by inspection and as per instruction of engineer-in-charge, rotation testing of all swivel joints including piping and NRV in assembled condition. All labour, tools, tackles, machinery, consumables, instruments will be in the scope of contractor. "O" rings and steel balls required for above job will be in the owner's scope. | |||
444 | 40.068 | Dia 3" Roof Drain | Item 40.680 | 1 | EA |
445 | 40.069 | Dia 4" Roof Drain | Item 40.690 | 1 | EA |
446 | 40.07 | Dia 6" Roof Drain | Item 40.700 | 1 | EA |
447 | 40.071 | REPLACEMENT OF FIRE WATER SPRINKLER RING OF OIL STORAGE TANKS AND FABRICATION OF NEW SYSTEM Dismantling of complete cooling ring by cold cutting from existing location (from height 10-15 meter) of the tank and lowering down to ground level, transportation of new pipe from owners storage point to place of work. Fabrication of sprinkler piping with flange joints at every 20 meter interval, (this includes bending, cutting, grinding, bevelling, fabrication, providing supports, welding of flanges as per site requirement, welding of sockets for sprinklers) Erection, laying of firewater sprinkler system (cooling ring) in original shape and position including sockets with sprinkler welding at suitable location as per inspection and safety department recommendation. Testing of all joints, section before erection, jointing these pipes with 8"/6" vertical header by equal tee and flanged end connection, testing and commissioning the system, fabrication, erection of support brackets and U-clamps for ring wherever required with owners supplied material, complete the job in all respect including supply of all equipment (welding machine, pipe bending machine, lifting tools and tackles, grinding machines etc.). Consumables such as electrodes, grinding wheels etc. as per specification and direction of EIC. This also includes salvaging of sprinklers from old piping, fabrication of mitres etc. Shifting of all scrap to scrap yard shall be in the scope of contractor. This also includes cutting and rebuilding of dyke if required for movement. Note: 1. The contractor shall be paid on the actual measurement on running meter basis of sprinkler system. 2. If the item is operated when tank is in operation then no hot job shall be permissible at site. The ring system shall be fabricated with flanges at ends of bend pipe and to be erected and boxed up. However, if it is carried out during M&I of tank then hot job may be permissible. The maintenance philosophy shall be decided by EIC at the time of execution. The rate of item shall remain unchanged for both maintenance philosophy. 3. The above item is applicable for replacement of fire water sprinkler ring only. 4. Payment for vertical riser pipe/ horizontal header (other than ring portion) shall be paid in separate item under this SOR. 5. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Note: Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately. | |||
448 | 40.072 | Pipe - Dia 3" | Item 40.720 | 1 | M |
449 | 40.073 | Pipe - Dia 4" | Item 40.730 | 1 | M |
450 | 40.074 | Pipe - Dia 6" | Item 40.740 | 1 | M |
451 | 40.075 | REINFORCEMENT OF EXISTING WELD JOINT (E-6013) | Item 40.750 | 2 | M |
452 | 40.076 | REINFORCEMENT OF EXISTING WELD JOINT (E-7018) | Item 40.760 | 2 | M |
453 | 40.077 | STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the areas specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding material including supply of all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-Charge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs | |||
454 | 40.078 | Upto 6 M | Item 40.780 | 36 | M2 |
455 | 40.079 | Above 6 m upto 10 m | Item 40.790 | 40 | M2 |
456 | 40.08 | Above 10 m upto 20 m | Item 40.800 | 40 | M2 |
457 | 40.081 | Intermediate plate form | Item 40.810 | 30 | M2 |
458 | 40.082 | Volumetric (For inside Furnace/ Vessels etc.) (For volumetric scaffolding beyond 10 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 10 meters.) | Item 40.820 | 12 | M3 |
459 | 40.083 | WELDING OF CS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding of CS plates including cutting / grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools & tackles, supervision as per technical specifications, drawings and complete the job in all respect as per direction of the Engineer-in-Charge. Note: Heat treatment and other NDT charges shall be paid extra. | |||
460 | 40.084 | Upto 3mm thick | Item 40.840 | 3 | M |
461 | 40.085 | Above 3mm & upto 5mm thick. | Item 40.850 | 3 | M |
462 | 40.086 | Above 5mm & upto 6mm thick | Item 40.860 | 3 | M |
463 | 40.087 | Above 6mm & upto 7mm thick | Item 40.870 | 3 | M |
464 | 40.088 | Above 7mm & upto 9mm thick. | Item 40.880 | 3 | M |
465 | 40.089 | Above 9mm & upto 11mm thick | Item 40.890 | 3 | M |
466 | 40.09 | Above 11mm & upto 12.7mm thick | Item 40.900 | 3 | M |
467 | 40.091 | INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, gaskets, nut bolts etc. either from owner's storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ ring properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing strips, complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. | |||
468 | 40.092 | For Valves (other than RTJ) | Item 40.920 | 26 | KG |
469 | 40.093 | REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. | Item 40.930 | 7 | KG |
470 | 40.094 | FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DAVITS / STAIR CASE ETC. | Item 40.940 | 1 | TO |
471 | 40.095 | DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC. | Item 40.950 | 1 | TO |
472 | 40.096 | CS weld deposit for tank surface (upto 2.5mm depth) | Item 40.960 | 20 | M2 |
473 | 40.097 | GOOSE NECK CLEANING Cleaning of goose neck and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | |||
474 | 40.098 | DIA 6 INCH | Item 40.980 | 1 | EA |
475 | 40.099 | DIA 8 INCH | Item 40.990 | 1 | EA |
476 | 40.1 | DIA 10" | Item 40.1000 | 1 | EA |
477 | 40.101 | HOT/ COLD BENDING OF PIPES FOR SPRINKLER SYSTEM ON THE TANK | Item 40.1010 | 24 | IM |
478 | 40.102 | REVISIONING OF GUIDE ROLLERS IN TANKS Revisioning of guide rollers in tanks and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. | Item 40.1020 | 6 | EA |
479 | 40.103 | All kinds of soil | Item 40.1030 | 20 | M3 |
480 | 40.104 | Cement mortar 1:4 (1 cement : 4 coarse sand) | Item 40.1040 | 20 | M2 |
481 | 40.105 | Filling available excavated earth (excluding rock ) in trenches, plinth, sides of foundations etc., in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m | Item 40.1050 | 20 | M3 |
482 | 40.106 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | Item 40.1060 | 20 | M3 |
483 | 40.107 | Foundations, footings, bases of columns etc. for mass concrete. | Item 40.1070 | 20 | M2 |
484 | 40.108 | Thermo-mechanically treated bars | Item 40.1080 | 20 | KG |
485 | 40.109 | Design, supply, fabrication, making of suitable foundation and erection of barricade around the tank undertaken for repair, isolating it from other tanks and without disturbing normal operation of other nearby tanks, using structural steel/steel pipes andCGI/AL sheets, clamps, wire rope etc., covering fully from grade level and upto a height of 1.0 mtr. above the Crown of the tanks. Barricading should be designed to withstand natural calamities, like heavy rain fall, seasonal wind load etc. Dismantlingand removal of the barricading materials from the operating area, immediately after completion of tank repairing. [A portion towards the road side to be left open for access to work place. Part of the barricading erected to repair one Tank will be used for repairing of other tanks, if found suitable. For a new tank, 30% barricading will be done with new GI sheets and 70% to be done with GI sheets used in previous tank repair if found suitable for use by EIC]. | |||
486 | 40.11 | Design, supply, fabrication isolating | Item 40.1100 | 1000 | M2 |
487 | 40.111 | "MAKING INLET/OUTLETNOZZLE, MANHOLE, VENT HOLE, ETC. ON ROOF & SHELL: Making hole of required size, fabrication of tank nozzle/neck flange as per code and drawing, providing re-inforcement pad, welding of the same to the tank, making necessary cover & connection & boxing up to complete the work as per instruction of Engineer-In-Charge. | Item 40.1110 | 70 | ID |
488 | 40.112 | Sprinkler coil ( approx length 60-70 m) from old 1.5 to 2.0 inch dia pipe all around the tank to spray FW during hot job in tank | Item 40.1120 | 2 | LS |
489 | 40.113 | Column support for temporary staging of roof structure for top course of shell plate replacement (material: BGR SCOPE) | Item 40.1130 | 10 | EA |
490 | 40.114 | Removal of Oily sludge from tank, cleaning of shell and bottom plates, weld beads for handover to Inspection for thickness gauging and transportation of sludge after collection of disposal at siphoning pond with BGR complexat a distance about 1KM or at melting pit at east side of pump house-I as per direction of EIC. | Item 40.1140 | 120 | M3 |
491 | 40.115 | Foam Pourer overhauling : Scaffolding, Dismantling, shifting to CWS for overhauling and put back into service after overhauling. | Item 40.1150 | 18 | EA |
492 | 40.116 | DISMANTLING & REMOVAL OF FOLDING LADDER INSTALLED AT WLG, SHIFTING THE SAME TO DESIGNATED SITE/SCRAPYARD, INSTALLATION OF NEWLY FABRICATED LADDER AT SITE AFTER PROPER BALANCING, FIXING OF RUBBER PADS AND COUNTERWEIGHTS WITH PROPER FASTENERS TO COMPLETE WORK IN ALL RESPECTS AS PER DIRECTION OF ENGINEER -IN-CHARGE INCLUDING SUPPLY OF TOOLS,TACKLES, LIFTING ARRANGE MENT, LABOUR ETC. | Item 40.1160 | 1 | EA |
493 | 40.117 | STRUCTURAL WORK WITH IOCL (BGR) SUPPLY :- Drawing and shifting of structural materials, Fabrication and Erection of structures,making of all types of joints for partial/total replacement of tank roof supporting structures, curb angles, stairway, hand rails, landing plate-forms, gratings, including supply of all types consumables, machineries, nut-bolts, laborurers, to complete the structure repairing and modification work as per instruction of Engineer-in-charge.[Structural Materials required for replacement of structures will be supplied by IOCL (BGR)]. | |||
494 | 40.118 | Fabrication/Erection of piping support/platforms etc for tank reparing job. | Item 40.1180 | 1 | TO |
495 | 40.119 | Erection of temporary plate lifting stru | Item 40.1190 | 1 | TO |
496 | 40.12 | Fabrication & Erection of new grating, hand railing, ladder etc. including supply and application of Red Oxide Zinc Chromate Primer (excluding cost of structural steel). | Item 40.1200 | 1 | EA |
497 | 40.121 | TACK WELDING (Length of 1 tack is 10 mm) | |||
498 | 40.122 | CS to CS Tack Welding | Item 40.1220 | 180 | EA |
499 | 40.123 | SS to SS Tack Welding | Item 40.1230 | 60 | EA |
500 | 40.124 | Internal cleaning of tank of ANY capacity ,scrapping of the bottom ,side walls,roof,steam coils,roof legs etc.to make it oil free and Supply of semi skilled manpower on per day basis to complete the jobs. UOM = DAY | Item 40.1240 | 80 | EA |