Widening And Strengthening Of Road Village Bhikkampur To Raighati In Laksar Constituency In District Haridwar Under State Sector Year 2020-21 ( Job 2 ) .
Tender Overview
Project Description
Widening And Strengthening Of Road Village Bhikkampur To Raighati In Laksar Constituency In District Haridwar Under State Sector Year 2020-21 ( Job 2 ) .
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-May-2021 | Date Extended | Date | 10-May-2021 |
| 2 | 10-May-2021 | Date Extend | Date | 18-May-2021 |
BOQ
| Name of Work: Widening and strengthening of road Village Bhikkampur to raighati in Laksar Constituency in District Haridwar Under State Sector Year 2020-21 (Job 2). | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 259.5 | Cum | |
| 2 | 2 | Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. | 894.37 | Cum | |
| 3 | 3 | WBM Grading 2\nProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.\n | 766.31 | Cum | |
| 4 | 4 | WBM Grading 3\nProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.\n | 843.75 | Cum | |
| 5 | 5 | Tack coat using VG-10 grade bitumen Over dry and hungry surfaces treated with primer @ 0.40 kg/sqm | 9937.5 | Sqm | |
| 6 | 6 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type B as per Technical Specification Clause 508.Case - II By Mechanical Means\n | 9937.5 | Sqm | |
| 7 | 7 | Seal Coat\nProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 case II type B Bitumen (VG-30) By Mechanical Means\n | 9937.5 | Sqm | |
| 8 | 8 | Providing and Laying of Interlocking Concrete Block Pavements of M-40 Grade having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 1149.05 | Sqm | |
| 9 | 9 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203P.C.C. grade M 20 FOR TILES HORIZONTALY AND VERTICALY LOCKING Nominal mix (1:2:4) | 163.45 | Cum | |
| 10 | 10 | Construction of Subgrade and Earthen Shoulders\nConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.\n | 138 | Cum | |
| 11 | 11 | Kilometre Stone\nReinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 17031:2:4)\n | |||
| 12 | 11.1 | ORDINARY KILOMETER STONE(PRECAST) | 4 | No | |
| 13 | 11.2 | 200M STONE HECT. PRECAST | 12 | No | |
| 14 | 12 | Semi Reflective Traffic Signs\nProviding and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2800 mm x 600 mm rectangular\n | 6 | No. | |
| 15 | 13 | Details of 03 years maintenance :-\n1- Defect Liability Period for work done will be 3 Years after actual date of completion.\n2- Maintenance to be done by contractor for 3 years after actual date of completion of work for which Payment will be made 0.5% for Ist year, 1.0% for 2nd years & 1.50% for 3rd year over final cost of work done. All other required work shall be carried out by contractor as per direction of Engineer-in-charge such as follows :-\n(i) Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations.\n(ii) Maintenance of road side drains including minor slip/malba clearance, reshaping, deepening and regarding as well as catch water drains.\n(iii) Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal point.\n(iv) Maintenance of scuppers, Causeway & culverts by way of clearing, cleaning, Erosion repair, repairs to cracks, parapet walls and protection works.\n(v) Maintenance of road signs by way of cleaning and repainting.\n(vi) maintenance of 200 Metre Hectometer stone, Km stone and 5th km stone by way of refixing of tilted stones, repairing with cement mortar, painting and lettering.\n(vii) Repairing of pot holes and patches with same material for construction or as per direction for Engineer-in charge.\n | |||
| 16 | 13.01 | Maintenance for 1st year including all item of BOQ limited upto 0.50% of Estimated cost (from Ch: 0.350 to 3.000) | 1 | Job | |
| 17 | 13.02 | Maintenance for 2nd year including all item of BOQ limited upto 1.00% of Estimated cost (from Ch: 0.350 to 3.000) | 1 | Job | |
| 18 | 13.03 | Maintenance for 3rd year including all item of BOQ limited upto 1.50% of Estimated cost (from Ch: 0.350 to 3.000) | 1 | Job |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.