South Eastern Coalfields Limited-SECL has published Regular Cleaning Of Spillage Coal/Dust/Slush/Slurry Etc . From Various Locations/Transfer Points Of Belt Conveyors ( C1-C8 To Th-7 ) Including Cleaning Of Spillage Coal Etc . By Mechanical Means During Unloading By Tippers At Trs-1 And Trs-2 Of New Ch. Submission Date for this Tender is 13-05-2021. Conveyors and Accessories Tenders in Dipka Expansion Project, Dipka Area Chhattisgarh. Bidders can get complete Tender details and download the document.
Name of the Work / Contract No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Cleaning of spilled coal / slush / slurry / muck etc. from various locations like transfer houses, drive houses, discharge, tail-end area, walkway area, vibro-feeder platform etc. of TRS Section and disposal of the same on the conveyor belts or to be stacked outside the conveyor structure as per instruction of Engineer In-charge. | BI01010001010000000000000515BI0100001113 | 2.4923e+06 | Sq.mtr |
2 | 2 | Periodical disposal / removal of the accumulated slush / slurry / mud / waste material etc. by transporting including loading / unloading within a lead of one km as per instruction of Engineer In-charge. | BI01010001010000000000000515BI0100001114 | 9465.67 | Cum |
3 | 3 | Cleaning of spillage coal during unloading of tippers at coal receiving hoppers of TRS-1 & TRS-2 and upkeeping / cleaning of external areas of TH-1 to TH-4 by mechanical means (Hydraulic excavator / JCB of one cum bucket capacity) for 24 hrs i.e. in all the three shifts with three nos. operators including cost of diesel etc. Hydraulic excavator / JCB is to be made available continuously at the working place in all the three shifts. However, the anticipated average working hours will be 16 hrs per day i.e. about 487 hrs per month. | BI01010001010000000000000515BI0100001117 | 365 | Day |
4 | 4 | Note: (i). All manpower must be VTC trained and must be provided with safety equipment such as safety shoes, fluorescent jackets, helmets, safety belts etc. Providing of these safety equipments will be under the scope of contractor. (ii). All tools and tackles involved will be under the scope of contractor. (iii). The contract may be foreclosed at any point of time during the contract period as per requirement of the work. (iv). Rates are inclusive of CMPF, Pension, Contractor's Profit & other overhead expenses etc. excluding GST. | |||
5 | 5 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001129 | 1 | Nos |