| 1 | 1 | Dismantling brick or stone masonry in lime or cement mortar under 3m.height including stacking the useful materials for reuse and removing the debris within 50mt lead including labour charges etc complete. | BI01010001010000000000000515BI01000011120 | 32.2 | cumt |
|---|
| 2 | 2 | Earth work excavation in foundation in hard soil with in initial lead and initial lift including dressing and levelling the bed and depositing the soil away from the work site including labour etc complete. | BI01010001010000000000000515BI0100001121 | 223.72 | cum |
|---|
| 3 | 3 | Fillling foundation and plinth with sand well watered and rammed including cost andconveyance labour etc complete. | BI01010001010000000000000515BI0100001123 | 37.13 | cum |
|---|
| 4 | 4 | C.C (1:4:8) with 4cm size BHG (HB) metal including cost, conveyance, labour , well watering and curing etc complete. | BI01010001010000000000000515BI0100001155 | 37.13 | cum |
|---|
| 5 | 5 | R.R.H.G Stone masonry in CM (1:6) in foundation and plinth including cost of materials, lead, royalty conveyance and well watering and curing etc complete. | BI01010001010000000000000515BI0100001125 | 53.62 | cum |
|---|
| 6 | 6 | R.C.C work of M-20 grade with 20mm size and down grade black hard granite (crusher broken) stone including hoisting and laying, cost of materials, labour, lead royalty etc complete. | BI01010001010000000000000515BI0100001126 | 68.9 | cum |
|---|
| 7 | 7 | Fly ash brick masonry in CM (1:6) in superstructure using 9\" size fly ash brick including all leads and royalty etc complete. | BI01010001010000000000000515BI0100001127 | 61.89 | cum |
|---|
| 8 | 8 | 16mm thick cemetn plaster with (1:6) cement mortar including cost of materials, watering, curing, conveyance lead royalty etc complete. | BI01010001010000000000000515BI0100001128 | 554.34 | Sqmt |
|---|
| 9 | 9 | Rigid and smooth centring and shuttering for column base, plinth bend work & dismantling them after casting including cost of materials etc complete. | BI01010001010000000000000515BI0100001129 | 498.9 | Sqmt |
|---|
| 10 | 10 | C.C (1:2:4) using 12mm size hard granite crusher broken chips including cost of materials, labour, lead, royalty, well watering and curing etc complete. | BI01010001010000000000000515BI0100001130 | 1.66 | cum |
|---|
| 11 | 11 | Labour for M.S reinforcement including cutting bending and tying rod grill and placing in position including cost of M.S rod, royalty etc complete. | BI01010001010000000000000515BI0100001131 | 68.9 | qntl |
|---|
| 12 | 12 | Painting two coats with any approved paint with plastic emulsion paint to the surface including cost of material and labour charges etc complete. | BI01010001010000000000000515BI0100001132 | 554.34 | sqmt |
|---|
| 13 | 13 | Supplying, fitting and fixing of M.S grill gate including all cost , taxes labour charges etc complete. | BI01010001010000000000000515BI0100001133 | 813.78 | kg |
|---|
| 14 | 14 | Painting two coats with any approved paint with enamel paint to the surface including cost of material and labour charges etc complete. | BI01010001010000000000000515BI0100001134 | 21.6 | Sqmt |
|---|
| 15 | 15 | Add for display board and three stages photographs i.e before execution, during execution and after completion of the project. | BI01010001010000000000000515BI0100001135 | 1 | ls |
|---|