| 1 | 1 | Earthwork in excavation in all types of soil for site leveling, foundation, pits, trenches and other civil works upto and including 1.5metre lift and stacking the soil upto a lead of 100 metre and including dewatering, removing slush, shoring and strutting (as required), complete as per specification and as directed by the Engineer-In-Charge. | BI01010001010000000000000515BI01000011120 | 161.051 | cum |
|---|
| 2 | 2 | Supplying of filling sand in foundation and over areas including watering, ramming, consolidating and dressing, labours, tools, taxes etc., all complete as per the specification and direction of Engineer-In-Charge. | BI01010001010000000000000515BI0100001121 | 32.21 | cum |
|---|
| 3 | 3 | Providing and laying plain cement concrete 1:3:6 (1 cement:3 sand:6 stone agregate 20mm nominal size) as levelling course in foundation and plinth etc. including tempering, curring, shuttering etc. complete all depth and height. | BI01010001010000000000000515BI0100001122 | 32.2 | Cum |
|---|
| 4 | 4 | Providing and laying reinforced cement concrete of M20 USING 12mm SIZE hgcb chips and down grade black hard granite (Crusherbroken) chips including cost of all materials, labours T&P etc. Complete but excluding the cost of shuttering and reinforcement. at all heights and all floors. | BI01010001010000000000000515BI0100001123 | 83.76 | cum |
|---|
| 5 | 5 | Supplying, straightening, cutting, bending, placing in position and binding reinforcement steel work in RCC/reinforced brick works as per drawing and specification including preparation of respective bar bending schedule and binding ( Binding wire to be used as per the IS code) etc. all complete as per direction of Engineer-in-charge.Cold Twisted bars, Thermo-Mechanically-treated bars. | BI01010001010000000000000515BI0100001124 | 75.38 | Qntl |
|---|
| 6 | 6 | Centring and shuttering for rcc work.Drain | BI01010001010000000000000515BI0100001125 | 724.9 | Sqm |
|---|
| 7 | 7 | slab | BI01010001010000000000000515BI0100001126 | 11.15 | Sqm |
|---|
| 8 | 8 | Add for display board and 3 stages Photograph i.e Before execution,during execution and after completion of project | BI01010001010000000000000515BI0100001127 | 1 | ls |
|---|