}

Ultrasonic Flowmeter Design , Engineering , Manufacturing , Procurement Of Materials And Bought Out Components , Assembly At Shop , Inspection Including Inspection By Tpia , Testing At Manufacturers Works , Packing , Supply Of Ultrasonic Flowmete, Refer tender details-Gujarat

Indian Oil Corporation Limited-IOCL has published Ultrasonic Flowmeter Design , Engineering , Manufacturing , Procurement Of Materials And Bought Out Components , Assembly At Shop , Inspection Including Inspection By Tpia , Testing At Manufacturers Works , Packing , Supply Of Ultrasonic Flowmete. Submission Date for this Tender is 18-06-2021. Fuses Tenders in Refer tender details Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

27739461
Corrigendum : Ultrasonic Flowmeter Design , Engineering , Manufacturing , Procurement Of Materials And Bought Out Components , Assembly At Shop , Inspection Including Inspection By Tpia , Testing At Manufacturers Works , Packing , Supply Of Ultrasonic Flowmete
Open Tender
Indian
Gujarat
Refer tender details
18-06-2021

Tender Details

Ultrasonic Flowmeter Design , Engineering , Manufacturing , Procurement Of Materials And Bought Out Components , Assembly At Shop , Inspection Including Inspection By Tpia , Testing At Manufacturers Works , Packing , Supply Of Ultrasonic Flowmeter , Tag-701-Ft-6201N -Ultrasonic Flowmeter And Accessories As Per Doc . No . 081757C001-701-Sp-1547-007 , Mandatory Spares For Item No-1 , Tag No 701-Ft-6201N -10% ( Subject To Minimum 1 No . ) For Each Type Of Transmitter / Receiver / Sensor . , Mandatory Spares For Item No-1 , Tag No 701-Ft-6201N -10% ( Subject To Minimum 1 No . ) For Each Type Of Electronic Card . , Mandatory Spares For Item No-1 , Tag No 701-Ft-6201N --1 Set Of Fuses For Each Instrument . , Unit Rate For Supervision Of Erection And Commissioning For Quoted Items As Per Enclosed Instructions To Vendor Per Diem Charges Upto 8 Hrs On Normal Working Days . ( Bidders To Quote Unit Rate For Diem Charges ) , Unit Rate For Supervision Of Erection And Commissioning Of Items For Quoted Item As Per Enclosed Instructions To Vendor Overtime Rate Per Hour ( Beyond Normal 8 Hours On Normal Working Days ) . ( Bidders To Quote Over Time Rate Per Hour ) , Unit Rate For Supervision Of Erection And Commissioning For Quoted Items As Per Enclosed Instructions To Vendor Overtime Rate Per Hour For Work On Weekly Off Days / Holidays ( As Applicable To Refinery Site ) . ( Bidders To Quote Over Time Rate Per Hour )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 28-May-2021 Addendum 1 Date 11-06-2021
2 11-Jun-2021 Addendum 2 Date 18-06-2021

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Design, Engineering, manufacturing, procurement of materials and bought out components, assembly at shop, Inspection including inspection by TPIA, Testing at manufacturer's works, packing, supply of ULTRASONIC FLOWMETER including supply of all Mandatory , Erection start up spares & commissioning spares & special tools and tackles, supervision services and all Auxiliaries, details as per material requisition on FOT point of despatch for Indigenous bidders FOR BR-9 ,RFCC REVAMP Project at IOCL's Barauni Refinery.
Sl. No. Item Description Tag nos Quantity Units
1 1 Tag-701-FT-6201N -Ultrasonic Flowmeter and Accessories as per Doc. No. 081757C001-701-SP-1547-007 Item-1 1 No
2 1.1 Mandatory Spares for Item no-1 , Tag no 701-FT-6201N -10% (subject to minimum 1 no.) for each type of transmitter / receiver / sensor. Item-2 1 Set
3 1.2 Mandatory Spares for Item no-1 , Tag no 701-FT-6201N -10% (subject to minimum 1 no.) for each type of electronic card. Item-3 1 Set
4 1.3 Mandatory Spares for Item no-1 ,Tag no 701-FT-6201N -\n-1 set of fuses for each Instrument. Item-4 1 Set
5 2.1 Unit rate for Supervision of erection and commissioning for quoted items as per enclosed instructions to vendor Per Diem charges upto 8 hrs on normal working days.\n( BIDDERS TO QUOTE UNIT RATE FOR DIEM CHARGES ) Item-6 1 DIEM
6 2.2 Unit rate for Supervision of erection and commissioning of items for Quoted item as per enclosed instructions to vendor Overtime rate per hour (beyond normal 8 hours on normal working days).\n( BIDDERS TO QUOTE OVER TIME RATE PER HOUR ) Item-7 1 HOURLY
7 2.3 Unit rate for Supervision of erection and commissioning for quoted items as per enclosed instructions to vendor Overtime rate per hour for work on weekly off days / holidays (as applicable to Refinery Site).\n( BIDDERS TO QUOTE OVER TIME RATE PER HOUR ) Item-9 1 HOURLY
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail