Urban Development Department-UDD has published Construction Of New R . C . C . Drain From Mahavir Mandir To Kumhar Toli Under Municipal Corporation , Hazaribag. Submission Date for this Tender is 03-05-2021. Drainage Tenders in Municipal Corporation Hazaribag Jharkhand. Bidders can get complete Tender details and download the document.
Name of Work: Construction of New R.C.C. Drain from Mahaveer Mandir to Kumhar Toli under Municipal Corporation, Hazaribag | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15m lead and disposal of unserviceable materials with all leads complete as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001112 | 68.52 | M3 |
2 | 2 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | BI01010001010000000000000515BI0100001113 | 1291.72 | M3 |
3 | 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royaly and taxes all complete as per building specification and direction of E/l. (Mode of measurement compacted volume) | BI01010001010000000000000515BI0100001114 | 80.54 | M3 |
4 | 4 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001115 | 1057.35 | M2 |
5 | 5 | Providiag designation 75B brick work in Cement Mortar (1:6) in foudation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. | BI01010001010000000000000515BI0100001116 | 59 | M3 |
6 | 6 | Providing P.C.C./R.C.C. M-200 with nominal mix of (1:1½:3) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of requisite F.M (2.5 to 3) including screening, shuttening, mixing cement mortar in mixer and placing in position, vibriting, striking, curing (but excluding the cost of reinforcement) tax and royalty all complete as per building specification and direction of E/l. | BI01010001010000000000000515BI0100001117 | 368.91 | M3 |
7 | 7 | Providing R.C.C. M-150 with nominal mix of (1:2:4) in slab of desired size foundation with approved quality of stone chips and clean coarse sand of requisite F.M 2.5 to 3 including curing, shuttening, carrying the slab manually to site and laying in position (but excluding the cost of reinforcement) taxes and royalty all complete as per building specification and direction of E/l. | BI01010001010000000000000515BI0100001118 | 182.3 | M3 |
8 | 8 | Providing TMT steel reinforcement 10mm, 12mm bars as per approved design and drawing excluding carriage of M.S bar to work site, cutting, bending end binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001119 | 40.22 | M3 |
9 | 9 | Providing 12 mm thick cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding, taxes and royalty all complete as per specification and direcition of E/l. | BI01010001010000000000000515BI0100001120 | 348.5 | M3 |
10 | 10 | Providing 1.5 mm cement punning including curing, carriage of water with all leads and lifts as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001121 | 348.5 | M3 |
11 | 11 | Carriage of materials by diesel truck including loading at source, unloading at work site and stacking properly, labour, P.O.L. etc. all complete as per direction of E/I.\nCement - Lead 2 km | BI01010001010000000000000515BI0100001122 | 230.68 | MT |
12 | 12 | Sand - Lead 20 km | BI01010001010000000000000515BI0100001123 | 358.48 | M3 |
13 | 13 | Stone Chips - Lead 15 km | BI01010001010000000000000515BI0100001124 | 473.18 | M3 |
14 | 14 | Bricks - Lead 20 km | BI01010001010000000000000515BI0100001125 | 58.324 | ‰ nos. |
15 | 15 | Steel - Lead 2 km | BI01010001010000000000000515BI0100001126 | 40.22 | MT |
16 | 16 | Goods & Services Tax (G.S.T.) - 12% | BI01010001010000000000000515BI0100001127 | 7.00586e+06 | Rs. X |
17 | 17 | Labour Cess - 1% | BI01010001010000000000000515BI0100001128 | 7.84656e+06 | Rs. X |