Construction Of Slab Drain On Tembrusonda Sonapur Borala Daryabad Hanwatkheda Eklaspur Road Km.4/400 ,4/500 And 7/00 Odr 11 Tq-Chikhaldara
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Apr 2021
0 days left
EMD
18000
Bank guarantee accepted
Document Fee
1120
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
CHIKHALDARA → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Slab Drain On Tembrusonda Sonapur Borala Daryabad Hanwatkheda Eklaspur Road Km.4/400 ,4/500 And 7/00 Odr 11 Tq-Chikhaldara
BOQ
| Sl. No. | Item Description |
| 1 | Excavation for foundationin earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directedetc. complete. |
| 2 | Excavation for foundationin hard murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. |
| 3 | Providing and laying in situ cement concrete of M10 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum rtype mixer with SCADA with fine aggregatee of required specifications) (VSI sandfinely washed etc.))Km 5 |
| 4 | Providing and laying in situ/ready mix M-15 plain cement concrete of trap/granite/quartzite/gneiss metal for cast in citupiers,abutment,returns,wings etc. including provision of \"V\" shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete, including plywood/steel form work centering ( excluding dewatering by means ofpump)and including bailling out water and curing finishing in CM 1:3 etc.complete.as directed by engineer in charge basic rate shall be increased for height above 5.00 m in followinh manners (a)Heightupto5M.(With Concrete Mixer)With Natural/VSI standard Artificial Sand Km 5 |
| 5 | Providing and laying in situ / ready mix M-25 controlled cement concrete of trap/ granite/ quartzite/ gneiss metal for RCC work in solid/ deck slab etc. including ramming, vibrating, curing, formwork, centering and finishing in cement plaster excluding reinforcementetc. complete. (with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / pan mixer and fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) i) Height up to 5 m, normal rate. ii) Height 5 to 7.50 m, add 5 percent extra over basic rate.iii) Height 7.50 to 10 m, 7.50 percent extra. iv) Over 10 m Height, add 10 percent extra for every 2.50m rise.Km 5 |
| 6 | Providing and fixing stream lined M-20 grade RCC guard stone including mild steel bar reinforcement etc. complete. |
| 7 | Providing, cutting, bending, hooking, tyingand laying in position TMT FE 500 steel bars for reinforcement for all RCC works as per detailed drawings etc. complete. Km 5 |
| 8 | Providing and laying weep holes of 100 mm diameter PVC pipes as per drawing for abutment returns, return walls etc. Complete. |
| 9 | Back filling behind abutment, wing wall and return wall as per drawings and technical specification etc. complete.(by granular material)Km 5 |
| 10 | Providingand laying 0.90 meter thick metal mat consisting of rubble, oversize metal and normal size metal in specified thickness as per detailed drawing including supplying all materials, hand packing of rubble, spreading metal in layers and hard murum including watering and compaction with power roller etc. complete.Km 5 |
| 11 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete.Km 5 |
| 12 | For Labour Rate |
| 13 | Compacting the hard murum side widths including laying in layers on each side with vibratoryrollerincluding necessary,artificial watering complete. |
| 14 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)a)80 mm Metal, By breaking Boulders (Hand broken).Km 5 |
| 15 | Spreading80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . |
| 16 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete |
| 17 | Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. |
| 18 | Providing and laying in situ / ready mix M-20 cement concrete of trap /granite /quartzite /gneiss metal for approach slab / Rigid pavement including compacting, finishing, curing etc. complete. (excluding reinforcement) (with reversible drum type mixer/ concrete batch mix plant (pan mixer)with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ), cement 6.40 bags/cumt)Km 5 |
| 19 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. |
| 20 | Providing and fixing board displaying information,suchas \"Nameofwork,Tendercost,Name of Contractor,Work and liability period etc\",having rectangular shape of 1.20mx0.90m size made out 18 gauge(1.25mm) thick mild steel sheet painted with one coat of Zincchromate stoving primer and two coats of enamel paint on frontside and grey stove enamel on back side and border/messages/symbols etc.with approved colour shade paint complete,on M.S.angle of size35x35x3mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S.angle iron posts of size 65mmx65mmx6mm,3.65m long painted with alternate black and white bands of 25cm widthincludingallfixturesetc.andfixingtheboardsin1:4:8 concreteblockofsize60cmx60cmx75cmincluding, excavation,refilling,transportation,andlabouretccomplete. Spec. No. As directed by Engineer in Charge |
| 21 | Cement ( Rate as per PMGSY Lab )Standard Consistancy |
| 22 | Specific Gravity |
| 23 | Fineness(by sieving) |
| 24 | Setting Time ( Initial & Final ) |
| 25 | Compressive Strength |
| 26 | Sand ( Rate as per PMGSY Lab )Fineness Modulus ( Sieve Analysis ) |
| 27 | Silt & Clay Content |
| 28 | Murum( Rate as per PMGSY Lab )Liquid limit & plastic Limit. (Plasticity index) |
| 29 | Steel ( Upto 16 mm bar )( Rate as per SSR 2020-21)(Tensile strength, %, Elongation, Yield Stress,Weight-Per Meter, Bend I Rebend Test, \" ., Proof Stress.) |
| 30 | C.C.Cube ( Rate as per PMGSY Lab )Crushing strength C.C. CubeM10 |
| 31 | Crushing strength C.C.Cube M15 |
| 32 | Crushing strength C.C.Cube M20 |
| 33 | Crushing strength C.C.Cube M25 |
| 34 | Royalty ChargesMetal and Murum |
AI Tender Summary
Tender Timeline
Apr 20, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedApr 26, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedApr 27, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender