Conducting Aerial Lidar Survey Between Kollapally Near Ramapuram And Erumeli As Part Of Angamali Sabari Bg Line Rail Project
Tender Overview
Project Description
Conducting Aerial Lidar Survey Between Kollapally Near Ramapuram And Erumeli As Part Of Angamali Sabari Bg Line Rail Project
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-Apr-2021 | Corrigendum 2 | Date | 10-May-2021 |
| 2 | 29-Apr-2021 | CORRIGENDUM 3 | Technical Bid | 10-May-2021 |
| 3 | 11-May-2021 | Corrigendum 4 | Date | 17-May-2021 |
| 4 | 14-May-2021 | Corrigendum 5 | Other | 17-May-2021 |
BOQ
| Name of Work: Conducting Aerial LiDAR Survey between Kollappalli (Near Ramapuram) and Erumeli as part of proposed Angamali – Sabarimala New BG Line project for a length of approx. 40 KM in Kottayam District of Kerala state. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Conducting Aerial LiDAR Survey | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | “Aerial LiDAR Survey complemented with Aerial Photography shall be carried out for the Area of Interest covering the proposed alignment of approx. 40 km including river/ water body crossing between Kollappalli (Near Ramapuram) and Erumeli as part of proposed Angamali- Sabarimala New BG Line project. Data Capturing to be done for 600m wide corridor i.e. 300m on each side of the proposed alignment. However, Data Processing to be carried out for 100m wide corridor (i.e. 50 m on either side of the alignment). \nThe contractor will have to establish the control network along the Proposed Centerline and the Ground control points have to be established. (Detailed specification and Scope of services and its objectives enclosed separately) | BI01010001010000000000000515BI0100001113 | 40 | Km |
| 3 | 1.02 | Additional Data Processing may be processed from the captured raw data, if required, based on final alignment finalization.\nPre-Processing of additional data per square kilometer for change in alignment (but from within the corridor on either side of alignment where Aerial LiDAR data has been captured).(Detailed Scope of services , Specifications and its objectives\" enclosed separately.) | BI01010001010000000000000515BI0100001114 | 2 | Sq Km |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender