| 1 | 1 | Supply of following structural steel materials per Gate: Gate Siz:1700x1800 \ni. Embedded parts-Guide channel 170x3800x10thx2nos,120x3800x10thx4nos, ISA50x 50x 6thx100lx12nos, ½ cut ISMB200x1750lx1no, Anchor plate 100x100x10thx6nos \nii. Gate Leaf details-1700x1800x8thx1no,1790x75x10thx2nos, ISA50x50x6thx1660lx6nos. 1800x65x8thx3nos, 200x150x12thx2nos, \niii. Seal details -1700x50x6thx2nos, 1800x50x6thx4nos\niv. Cross Beam and Hoist- ISMB200x2000lx2nos, 200x150x8thx4nos, \n\n | BI01010001010000000000000515BI0100001113 | 6 | Set |
|---|
| 2 | 2 | Supply of following bought out materials per Gate:\nStainless steel flat 1800lx50wx8thx4nos, 1700lx50wx8thx1nos, SS electrode super inox 1A 4mmx200nos., Natural/ Synthetic rubber seal confirming to IS:11855-botttom half round at one end 1700lx75wx10thx1no, P-type seal 32mm diax1800lx80wx10thx2no, Hex bolt M12x70N IS:1363 with washeex18nos, CSK screw M12x70N IS:1363 with washerx37nos,\nNut type Screw Gear box assembly suitably threaded for 80mm dia screw rod including 1no thrust ball bearing in complete shape-1set, 80mm dia screw rod suitable square threaded to M78x10x2000l with total length 2500x1no,Gate pin dia 40x150lx1no. material:45C8 IS1570, Grease MP3-2Kg, Mobile-1Litre, Gate handle-1no., Foundation bolt M16x150Nx8nos with double washer, Split pin-1no, Bronze pad 80x30x12x4nos, CSK bolt suitable for bronze pad-16nos\n | BI01010001010000000000000515BI0100001114 | 6 | Set |
|---|
| 3 | 3 | Fabrication cost of following steel materials and their accessories including machineries, fixtures, labour, cutting, aligning, welding, cleaning with all lead and lift etc completed in all shape per gate: \nEmbedded parts -277.38Kg, Shutter and its accessories-310.72Kg, Hoist Bridge -111.14kg\n\n | BI01010001010000000000000515BI0100001115 | 6 | Set |
|---|
| 4 | 4 | Cost of erection, trail and commissioning including machineries, fixture, labour, cutting, aligning, welding, cleaning with all lead and lift completed in all shape per gate\nFabricated materials-699.24Kg and Bought out materials-210.00Kg\n\n | BI01010001010000000000000515BI0100001116 | 6 | Set |
|---|
| 5 | 5 | Painting of all structural steel by applying one coat primer of 40micron thick and two coats of final paint of 100micron thick each, for embedded parts by one coat zinc rich primer and two coats of coal tar epoxy paint, Gate leaf of shutter by one coat zinc rich primer and two coats of coal tar epoxy paint, Hoist platform by one coat zinc rich primer and two coats of Al paint all inclusive of clearing, degreasing, handling, cost of materials, labour, all consumables and tools and tackles etc as per relevant IS Code and specification. | BI01010001010000000000000515BI0100001117 | 6 | Set |
|---|
| 6 | 6 | Cost of concrete cutting and chipping excess concrete from the vent groove of Guide channel 50x50x3800x6nos, Sill beam 200x150x1750x1no,, Cross Beam 150x150x100x 4nos, 2nd stage concreting after fixing of guide channel, sill beam and cross beam, hire charges of DG set for all erection work, cost of watch and ward at erection site and transportation of fabricated materials,all man and materials, tools and tackles machineries etc completed in all respect as per the direction of the Engineer-in-Charge of the site. | BI01010001010000000000000515BI0100001118 | 6 | Set |
|---|