Consultancy Services For Authority Engineer For Supervision For Rehabilitation And Upgradation Of Askot Lipulekh On Epc Basis For Phase I Design Chainage Km 21 . 330 To Km 56 . 935 Under Project Hirak Of Bro In The State Of Uttarakhand Under Bharatmala
Tender Overview
Project Description
Consultancy Services For Authority Engineer For Supervision For Rehabilitation And Upgradation Of Askot Lipulekh On Epc Basis For Phase I Design Chainage Km 21 . 330 To Km 56 . 935 Under Project Hirak Of Bro In The State Of Uttarakhand Under Bharatmala
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-May-2021 | EXTENSION OF BID DUE DATE | Date | 15-Jun-2021 |
| 2 | 01-Jun-2021 | AMENDEMENT IN RFP | Other | 15-Jun-2021 |
| 3 | 04-Jun-2021 | AMENDEMENT IN INFRACON PORTAL | Other | 15-Jun-2021 |
| 4 | 14-Jun-2021 | AMENDEMENT OF EXTENSION OF BID DUE DATE | Date | 28-Jun-2021 |
| 5 | 28-Jun-2021 | REVISED EXTENSION OF BID DUE DATE | Date | 09-Jul-2021 |
BOQ
| NAME OF WORK :CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION FOR Rehabilitation and upgradation of Askot – Lipulekh on EPC basis for Phase-I (existing Km 72.000 to Km 107.620) [Design Chainage Km 21+330 to Km 56+935) under Project Hirak of BRO in the State of Uttarakhand under Bharatmala Pariyojna (Phase-I) on EPC mode (length = 35.605 Km)” ON EPC. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1.1 | Key Personnel | item 1 | ||
| 2 | 1.11 | Team Leader Cum Senior Highway Engineer (1No) | item 2 | 36 | Month |
| 3 | 1.12 | Resident cum Highway Engineer (1 No) | item 3 | 84 | Month |
| 4 | 1.13 | Senior Geotechnical Engineer (1 No) | item 4 | 24 | month |
| 5 | 1.14 | Senior Structural Engineer (1No) | item 5 | 24 | Month |
| 6 | 1.15 | Senior Quality cum Material Expert (1 No) | item 6 | 24 | Month |
| 7 | 1.16 | Road Safety Expert (1 No) | item 7 | 12 | Month |
| 8 | 1.2 | Sub Professional Staff | |||
| 9 | 1.21 | Survey Engineer (1 No) | item 8 | 24 | Month |
| 10 | 1.22 | Highway Design Engineer(1 No) | item 9 | 6 | Month |
| 11 | 1.23 | Assistant Highway Engineer (02 nos) | item 10 | 48 | Month |
| 12 | 1.24 | CAD Expert (1 No) | item 11 | 6 | Month |
| 13 | 1.25 | Environmental Engineer(1 No) | item 12 | 6 | Month |
| 14 | 1.26 | Assistant Structural Engineer (1 No) | item 13 | 24 | Month |
| 15 | 1.27 | Assistant Quality cum Material Engineer (02 nos) | item 14 | 48 | Month |
| 16 | 1.28 | Assistant Geotechnical Engineer (1 No) | item 15 | 24 | Month |
| 17 | 1.29 | Quantity Surveyor(1 No) | item 16 | 36 | Month |
| 18 | 1.3 | Horticulture cum Landscaping Expert(1 No) | item 17 | 6 | Month |
| 19 | 2 | Support Staff | |||
| 20 | 2.1 | Office Manager (1 No) | item 18 | 36 | Month |
| 21 | 2.2 | Accountant cum cashier (1 No) | item 19 | 84 | Month |
| 22 | 2.3 | Computer Operator cum Steno (1 No) | item 20 | 36 | Month |
| 23 | 2.4 | Office Boy (1 Nos) | item 21 | 36 | Month |
| 24 | 3 | Transportation (Fixed Costs) The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. | |||
| 25 | 3.1 | Toyota Innova Crysta or equivalent (2 Nos.) (not\nmore than 6 months old)\n | item 22 | 48 | Month |
| 26 | 3.2 | Tata Tiago or equivalent (1 Nos.) (not more than 6 months old) | item 23 | 84 | Month |
| 27 | 4 | Duty Travel to Site (Fixed Costs) | |||
| 28 | 4.1 | Site to CE-RO, MoRTH, Office for Key Professionals | item 24 | 20 | Trips |
| 29 | 4.2 | Site to BRO Hirak for Key Professionals | item 25 | 20 | Trips |
| 30 | 5 | Office Rent (Fixed Costs) \nThe rent cost includes maintenance, cleaning, repairs, etc. | |||
| 31 | 5.1 | Office Rent | item 26 | 48 | Month |
| 32 | 6 | Office Supplies, Utilities and Communication (Fixed Costs) | |||
| 33 | 6.1 | Office Supplies | item 27 | 84 | Month |
| 34 | 6.2 | Drafting Supplies | item 28 | 84 | Month |
| 35 | 6.3 | Computer Running Costs | item 29 | 84 | Month |
| 36 | 6.4 | Domestic and International Communication | item 30 | 84 | Month |
| 37 | 7 | Office Furniture and Equipment (Rental) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment) | |||
| 38 | 7.1 | Office Furniture (Rental/ Hire) | |||
| 39 | 7.101 | Executive Table (Godrej make, model\nNo. T-108 or equivalent) for 48 months | item 31 | 7 | Each |
| 40 | 7.102 | Executive Chairs (Godrej make, model\nNo. PCH-701 or equivalent) for 48 Months | item 32 | 7 | Each |
| 41 | 7.103 | Tables (Godrej make, model No. T-104\nor equivalent) for 48 Months | item 33 | 5 | Each |
| 42 | 7.104 | Ordinary Chairs Type-1 (Godrej make,\nmodel No T-CHR –6 or equivalent)\nfor 48 Months | item 34 | 5 | Each |
| 43 | 7.105 | Tables (for all other staff) (Godrej\nmake, model No. T-101 or equivalent)\nfor 48 months | item 35 | 2 | Each |
| 44 | 7.106 | Ordinary Chairs –Type II (for all other\nstaff) (Godrej make, model No. \nCHR-6 or equivelent for 48 months | item 36 | 4 | Each |
| 45 | 7.107 | Steel Almirah 1270mm x 765mm x\n440mm (Godrej make, model minor plain or equivalent) for 48 months | item 37 | 6 | Each |
| 46 | 7.108 | Visitors chairs/Conference room chairs\n(Godrej make, model No. DCH7004 or equivalent) for 48 months | item 38 | 8 | Each |
| 47 | 7.109 | Tables for computers with 3 drawers,\nkey board/mouse pull out trays size\n1664mm x 900 (Godrej make. Or equivalent as per Engineer’s design) for 48 months\n | item 39 | 2 | Each |
| 48 | 7.11 | Printer desks (Godrej make or\nequivalent) for 48 months\n | item 40 | 2 | Each |
| 49 | 7.111 | Side tables (Godrej make or equivalent) for 48 months | item 41 | 4 | Each |
| 50 | 7.112 | Conference Table (Godrej make, model No.T-12 or equivalent) for 48 months | item 42 | 1 | Each |
| 51 | 7.113 | Revolving Chairs for Computer\nRoom/Drawing room for 48 months | item 43 | 2 | Each |
| 52 | 7.2 | Office Equipment (Rental/Hire) | |||
| 53 | 7.201 | Telephone with PABX facilities (2\nexternal lines & 10 internal lines) for 48 months | item 44 | 2 | Each |
| 54 | 7.202 | Photocopier for 48 months | item 45 | 1 | Each |
| 55 | 7.203 | Fax for 48 months | item 46 | 1 | Each |
| 56 | 7.204 | Air-Conditioner (1.5 Ton) for 48 months | item 47 | 4 | Each |
| 57 | 7.205 | Computer PC (state of the art) for 48 months | item 48 | 5 | Each |
| 58 | 7.206 | Laser Jet Printers for 48 months | item 49 | 2 | Each |
| 59 | 7.207 | Diesel Generator (20 KVA) with running cost (for 48 months) | item 50 | 1 | Each |
| 60 | 7.208 | Binding Machine for 48 months | item 51 | 1 | Each |
| 61 | 7.209 | Engineering Plan Printer for 48 months | item 52 | 1 | Each |
| 62 | 7.21 | Plotter A0 size, overhead projector for 48 months | item 53 | 4 | Each |
| 63 | 7.211 | Water coolers (as required) etc. for 48 months | item 54 | 1 | Each |
| 64 | 8 | Reports and Document Printing | |||
| 65 | 8.1 | Monthly Reports (Design and Construction) | item 55 | 252 | copies |
| 66 | 8.2 | Halfyearly Reports | item 56 | 84 | copies |
| 67 | 8.3 | Various other reports as provided in the EPC Agreement such as Completion Report | item 57 | 36 | copies |
| 68 | 9 | Survey and Investigation A. Topographical Survey (Fixed Rate) | |||
| 69 | 9.1 | Surface defects detection and roughness measurement using Network Survey Vehicle\n | item 58 | 35.605 | Kms |
| 70 | 9.2 | Pavement strength measurement using FWD | item 59 | 35.605 | Kms |
| 71 | 9.3 | Bridge inspection using Mobile Bridge Inspection Unit | item 60 | 35.605 | Kms |
| 72 | 9.4 | Road signs inspection using Retro Reflectometer | item 61 | 35.605 | Kms |
| 73 | 10 | Contingency (A fixed amount of Indian Rupees ONE MILLION shall be include dinthe Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority inMinistry of Road Transport & Highways(MoRT&H)) | item 62 | 1 | LumpSum |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.