Supply Of Measurement Lab.- 1 Analog Cro 1 2 Dso 70 Mhz 2 3 Meggar / Insulation Tester 2 4 Handheld Clamp Meter 2 5 P.F. Meter 2 6 Phase Shifter 1 7 Measure Power And Power Factor In 3-Phase Load By ( I ) Two-Wattmeter Method And ( Ii ) One-
Tender Overview
Project Description
Supply Of Measurement Lab.- 1 Analog Cro 1 2 Dso 70 Mhz 2 3 Meggar / Insulation Tester 2 4 Handheld Clamp Meter 2 5 P.F. Meter 2 6 Phase Shifter 1 7 Measure Power And Power Factor In 3-Phase Load By ( I ) Two-Wattmeter Method And ( Ii ) One-Wattmeter Method 1 8 Calibrate An Ammeter Using Dc Slide Wire Potentiometer. 1 9 Calibrate A Voltmeter Using Crompton Potentiometer. Measure Low Resistance By Crompton Potentiometer 1 10 Measure Low Resistance By Kelvins Double Bridge. 1 11 Measure Earth Resistance Using Fall Of Potential Method. 1 12 Calibrate A Single-Phase Energy Meter By Phantom Loading At Different Power Factors. 1 13 Measure Self-Inductance Using Andersons Bridge. 1
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-May-2021 | Date EXtend | 03-May-2021 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender