| 1 | 2 | Earth work in excvation in foundation in ordinary soil (Loam, Clay or Sand) invluding lift up to 1.50 meter and lead upto 30 meter and including filling watering and ramming of excavated earth into the trenches or in the spacebetween thebuilding and side of foundation trenches or in the plinth and removal & disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 mtr form foundation trenches. (S.l.No.251) | BI01010001010000000000000515BI0100001117 | 134.07 | Cum |
|---|
| 2 | 3 | Concrete with 40mm gauge brick ballast, fine sand of 1.25 F.M and cement in the proportion of 8:4:1 in foundation and under floors including supply of all material labours tools and plants etc required for the proper completion of the work (S.l.No275) | BI01010001010000000000000515BI0100001120 | 33.61 | Cum |
|---|
| 3 | 4 | Class 150 sub class 'A' brick work in 1:3 cement and course sand mortar in foundation and up to plinth including supply of all materials labour and T&P etc. Required for the proper completion of the work (S.l.No.307) | BI01010001010000000000000515BI0100001121 | 44.28 | Cum |
|---|
| 4 | 5 | Same as item No. 3 above but in super structure including necessary cutting and moulding of bricks required for proper complition of work (S.l.No 307+309) | BI01010001010000000000000515BI0100001122 | 63.3 | Cum |
|---|
| 5 | 6 | M-20 class R.C.C work with cement approved coarse sand 20mm gauge approved stone ballast in the proportion of 1:2:4 in bed blocks excluding the supply of rainforcement & its bending but including its biding the same with 24 BWG, Gl binding wire and alsoincluding providing & fixing the necessary centering and shuttering and its removal after completion of work & supply of all other materials labour tools and plants required for the proper completion of work (Labour rate includes cost of centering and shuttering) (S.l.No.282) | BI01010001010000000000000515BI0100001123 | 2.4 | Cum |
|---|
| 6 | 7 | Same as item No. 5 above but 1:1:5:3 in the slabs etc.(S.l.No.284A) | BI01010001010000000000000515BI0100001118 | 27.36 | Cum |
|---|
| 7 | 8 | Mild steel of iron work in plain work such as in reinforced concreate or reinforced brick work (When not included in overall rate) wrought to required shapes as necessary including bending for the proper completion of the work and including supply of steel and its wastage etc. and all labour T&P ect. required for proper completion of work. (S.l.No504) | BI01010001010000000000000515BI0100001119 | 29.2 | Cum |
|---|
| 8 | 9 | Cement concrete with 2.0 cmgauage approved stone grit, approved corse sand cement in the proportion of 4:2:1 including supply of materials labour and tools plants etc requierd for the proper completion of the work. (S.l.No 279A) | BI01010001010000000000000515BI0100001120 | 4.74 | Cum |
|---|
| 9 | 10 | Struck pointing with cement mortar consisting one part of cement and two part of fine sand of 1.25 fineness modulous of brick work including raking the joints washing and cleaing and supply of all materials labour and tools and plants etc. required for the proper completion of the work. (S.l.No 574) | BI01010001010000000000000515BI0100001121 | 170.25 | Sqm |
|---|
| 10 | 11 | Earth work in cutting or in embankment in ordinary soil (Loam, Clay or Sand) excavation to be in the form of pit not exceeding 50cm. In depth and earth work in embankment to be in 20cm layers including the ramming and dressing the furface to required level slopes and also including 1.50 Mtr. lift and 30 Mtr. lead. The earth from cutting to be used in marking embankment or to be deposited as spoil bank with in 30 Mtr. distance as directed by the Engineer Incharge. (S.l.No253) | BI01010001010000000000000515BI0100001122 | 500 | Cum |
|---|
| 11 | 12 | Brick soling with class-150 bricks laid on edge any dry including preparation of subgrade to prescribed camber and including supply of bricks and filling joints with spreading a blinding coat of 10 mm depth of local earth of local sand over the entire surface & including all labour T&P etc. required for proper completion of work (S.l.No762b) | BI01010001010000000000000515BI0100001123 | 66 | Sqm |
|---|
| 12 | 13 | Supply and fixing of sign board made of M.S angle iron including supply and cost of all materils labours T & P etc. required templet as directed by the Engineer In charge. | BI01010001010000000000000515BI0100001124 | 1 | Job |
|---|
| 13 | 14 | GST @ 12% | | 1.24148e+06 | GST |
|---|