| 1 | 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. Including disposal of excavated earth upto 1 mtr from cutting edge,: for All kind of soil | | 3.47 | Cum |
|---|
| 2 | 2 | Providing and Laying in position cement concrete. of specified grade excl. the cost of centering and Shuttering all work upto Plinth level (1:3:6) 1 cement: 3 coarse sand: 6 crushed graded stone Agg. 20mm nominal size | | 8.96 | Cum |
|---|
| 3 | 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)\n\n | | 0.5 | Cum |
|---|
| 4 | 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level in 1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) | | 2.63 | Cum |
|---|
| 5 | 5 | Reinforcement for R.C.C works including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more. | | 210.4 | Kg |
|---|
| 6 | 6 | 12mm Cement plaster of mix 1 : 6 ( 1 cement : 6 fine sand)\n\n | | 43.76 | Sqm |
|---|
| 7 | 7 | Steel work welded in built up section / framed work including cutting hoisting, fixincg in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladders, railing, brackets, gates and similar works | | 126 | Kg |
|---|
| 8 | 8 | Centering and Shuttering incl. strutting propping etc. and removal of form work for foundation, footing , bases of columns etc. for mass concrete. | | 50.44 | Sqm |
|---|
| 9 | 9 | Centering and Shuttering incl. strutting propping etc. and removal of form work for Suspended floors, roofs, landings, balconies and access platform.\n | | 6.78 | Sqm |
|---|
| 10 | 10 | Centering and Shuttering incl. strutting propping etc. and removal of form work Edges of slabs and breaks in floors and walls under 20cms wide.\n | | 33.23 | Rm |
|---|
| 11 | 11 | Removal of excavated mulba, dismantled unserviceable material from the site of work by MT/Animal transport or other wise including loading unloading complete job. | | 2.08 | Cum |
|---|
| 12 | 12 | Carriage of material by Mech.Transport including loading unloading and stacking a)Sand & Stone Aggregate 20 mm avg, Distance of 10 KM by MT | | 17.36 | Cum |
|---|