| 1 | 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 Metre and lead upto 30 metre and including filling, watering, and ramming of excavated earth into the trenches or into the space between the building and the side of the foundation. | 4.01 | 8 | CUM |
|---|
| 2 | 2 | Concrete with 4cm gauge down graded Stone ballast , coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 12:6:1 in foundation and under floors and supply of all materials, labour, tools and plants etc. required for proper completion of the work. | 5.01 | 4 | CUM |
|---|
| 3 | 3 | RCC work with cement, approved coarse sand ( F.M. 2.9 to 3.2) and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:1.5:3. For raft excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. wire including necessary centering and smooth shuttering etc required for proper completion of work including supply of all material, binding wire, labour and T&P etc. | 5.14 | 2 | Cum |
|---|
| 4 | 4 | Concreting of 40 mm thick R.C.C. trench cover of mild steel frame work with CC 1:1.5:3 in cement coarse sand, 06 mm down graded stone ballast with smooth finishing on both top and bottom surfaces matching with floor colour complete with all labour, materials, T&P etc. required for proper completion of the work but excluding cost of cover of steel frame. | 5.17 | 30 | Sqm |
|---|
| 5 | 5 | Placing of trench cover of all size in proper position including transporting from different places within the s/s area including all labour T&P etc. required for proper completion of the work as per direction of Engineer-in charge. | 5.19 | 50 | each |
|---|
| 6 | 6 | Providing cement concrete with cement, approved coarse sand (F.M. 1.5 to 2.5) and 12 mm gauge down graded approved stone ballast in the proportion of 1:1.5:3 in the grouting of Edge and brackets of trenches including necessary centering and shuttering etc. including supply of all materials, labour and T&P etc. required for proper completion of work. | 5.21 | 2 | CUM |
|---|
| 7 | 7 | 1st class brick work in 1:4 cement and coarse sand of 2.25 F.M. mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. | 6.02 | 4 | CUM |
|---|
| 8 | 8 | Mild steel or iron work in heavy small section like (J/U) hooks, holding down bolts, hold fast, tie rod, record recks, door/window frame, trench recks & edges, angle post etc. (when not included in overall rates) wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work. | 9.01 | 0.2 | MT |
|---|
| 9 | 9 | Mild steel or iron work in heavy large size sections such as trusses, built-up gates, roof work, window/boundry grill or railing, trench covers, grating, T/F rail etc. wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work.(CSI NO. 9.02) Angle 40x40x5 , trench cover | 9.02 | 0.8 | MT |
|---|
| 10 | 10 | T.M.T. or Tor Steel in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks, and authorized overlapping as required for proper completion of the work. | 9.04 | 0.2 | MT |
|---|
| 11 | 11 | Fixing and grouting of trench edging and rack in proper level and alignment including cost of all labour and T&P etc required for proper completion of the work but excluding cost of C.C. | 9.2 | 29.03 | Rm |
|---|
| 12 | 12 | 12mm thick plaster with cement mortar of 1 part cement & 4 parts of approved coarse sand 2.5 F.M. over Brick work, min. thickness not less than 10mm including supply all material, labour and T&P required for proper completion of work. | 11.05 | 60 | Sqm |
|---|
| 13 | 13 | Champhering the edge of concrete 35mm wide triangular section at the junction of concrete foundations and trench edging etc.as per direction of E/I, inclduing cost of all material labour and T&P etc. required for proper completion of the work. | 11.15 | 100 | Rm |
|---|
| 14 | 14 | 25mm thick 1:2:4 cement concrete floor with cement, approved coarse sand and 20mm graded stone aggregate laid in panels finished with 3mm floating coat of neat cement, over base concrete. Rate includes cost of all materials, labour and T&P required for proper completion of work but excluding cost of base concrete. | 12.01 | 15 | Sqm |
|---|
| 15 | 15 | Painting or varnishing on iron works in small areas of new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should confirm to the ISI no. 103-1950. CSI NO.13.01) ANGLE 40X40X5,Rack | 13.01 | 20 | Sqm |
|---|
| 16 | 16 | Same as in item 13.01 above but for every coat after Ist coat. CSI NO 13.02 Qty same as above item 13.01 | 13.02 | 20 | Sqm |
|---|
| 17 | 17 | RCC work with cement, approved coarse sand ( F.M. 2.9 to 3.2) and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:1.5:3. For raft excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. wire including necessary centering and smooth shuttering etc required for proper completion of work including supply of all material, binding wire, labour and T&P etc. | 5.14 | 3 | Sqm |
|---|
| 18 | 18 | Dismantling reinforced cement concrete or reinforced brick work or Cement Concrete of main gantry, auxillary foundation and any other foundation in switch yard. including stacking of dismantled material as directed by the Engineer-in-charge within a distance of 60 metres. | 15.02 | 3 | Cum |
|---|
| 19 | 19 | Earth filling in open area including cost of the earth when obtained from outside Corporation's area including its carriage ,loading/unloading,spreading, watering and ramming in 20cm layers and dressing of earth etc. Rate including all cost of material but excluding ROYALTY of Earth, Complete. Royalty will be paid extra to Contractor as per prevailing orders on Production of Proof of Payment in form of Challan Receipt of ibid work. | 4.11 | 15 | Cum |
|---|