| 1 | 1 | Hire Charges of 1 No. Troller for Transportation of Power Transformers (1 MVA to 10 MVA) excluding fuel charges but including Transit insurance | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.1 | 630 KVA | BI01010001010000000000000515BI0100001113 | 1 | Day |
|---|
| 3 | 1.2 | 1 MVA | BI01010001010000000000000515BI0100001114 | 1 | Day |
|---|
| 4 | 1.3 | 2.5 MVA | BI01010001010000000000000515BI0100001115 | 1 | Day |
|---|
| 5 | 1.4 | 3.15 MVA | BI01010001010000000000000515BI0100001116 | 1 | Day |
|---|
| 6 | 1.5 | 4 MVA | BI01010001010000000000000515BI0100001117 | 1 | Day |
|---|
| 7 | 1.6 | 5 MVA | BI01010001010000000000000515BI0100001118 | 1 | Day |
|---|
| 8 | 1.7 | 6.3 MVA | BI01010001010000000000000515BI0100001119 | 1 | Day |
|---|
| 9 | 1.8 | 10 MVA | BI01010001010000000000000515BI0100001120 | 1 | Day |
|---|
| 10 | 2 | Hire Charges for 1 no. Truck for transportation of all accessories/Conservator/Oil barrels etc of Power Transformer including Transit Insurance | BI01010001010000000000000515BI0100001121 | 1 | Day |
|---|
| 11 | 3 | Fuel Consumption of Troller for 1 litre (Example : 5 KM/Ltr). \nNote: Fuel charges will be given as per actual market rates at the time of Job | BI01010001010000000000000515BI0100001122 | | |
|---|
| 12 | 3.1 | Loaded 10 MVA Transformer | BI01010001010000000000000515BI0100001123 | 1 | Km |
|---|
| 13 | 3.2 | Loaded 6.3 MVA Transformer | BI01010001010000000000000515BI0100001124 | 1 | Km |
|---|
| 14 | 3.3 | Loaded 5 MVA Transformer | BI01010001010000000000000515BI0100001125 | 1 | Km |
|---|
| 15 | 3.4 | Loaded 4 MVA Transformer | BI01010001010000000000000515BI0100001126 | 1 | Km |
|---|
| 16 | 3.5 | Loaded 3.15 MVA Transformer | BI01010001010000000000000515BI0100001127 | 1 | Km |
|---|
| 17 | 3.6 | Loaded 1 MVA Transformer | BI01010001010000000000000515BI0100001128 | 1 | Km |
|---|
| 18 | 3.7 | Loaded 630 MVA Transformer | BI01010001010000000000000515BI0100001129 | 1 | Km |
|---|
| 19 | 3.8 | Unloaded /Without any load (self load only) | BI01010001010000000000000515BI0100001130 | 1 | KM |
|---|
| 20 | 4 | Fuel Consumption of Truck for 1 litre with load upto 8.5 Ton (Example : 5 KM/Ltr) | BI01010001010000000000000515BI0100001131 | 1 | KM |
|---|
| 21 | 5 | Fuel Consumption of Truck for 1 litre without load (Example : 5 KM/Ltr) | BI01010001010000000000000515BI0100001132 | 1 | KM |
|---|
| 22 | 6 | Hire Charges for Crane for lifting of Power Transformer (1 MVA to 10 MVA) including fuel charges | BI01010001010000000000000515BI0100001133 | 1 | Day |
|---|
| 23 | 7 | Loading of Power transformers including all accessories | BI01010001010000000000000515BI0100001134 | | |
|---|
| 24 | 7.1 | 630 KVA | BI01010001010000000000000515BI0100001135 | 1 | Each |
|---|
| 25 | 7.2 | 1 MVA | BI01010001010000000000000515BI0100001136 | 1 | Each |
|---|
| 26 | 7.3 | 2.5 MVA | BI01010001010000000000000515BI0100001137 | 1 | Each |
|---|
| 27 | 7.4 | 3.15 MVA | BI01010001010000000000000515BI0100001138 | 1 | Each |
|---|
| 28 | 7.5 | 4 MVA | BI01010001010000000000000515BI0100001139 | 1 | Each |
|---|
| 29 | 7.6 | 5 MVA | BI01010001010000000000000515BI0100001140 | 1 | Each |
|---|
| 30 | 7.7 | 6.3 MVA | BI01010001010000000000000515BI0100001141 | 1 | Each |
|---|
| 31 | 7.8 | 10 MVA | BI01010001010000000000000515BI0100001142 | 1 | Each |
|---|
| 32 | 8 | Un-Loading of Power transformers including all accessories | BI01010001010000000000000515BI0100001143 | | |
|---|
| 33 | 8.1 | 630 KVA | BI01010001010000000000000515BI0100001144 | 1 | Each |
|---|
| 34 | 8.2 | 1 MVA | BI01010001010000000000000515BI0100001145 | 1 | Each |
|---|
| 35 | 8.3 | 2.5 MVA | BI01010001010000000000000515BI0100001146 | 1 | Each |
|---|
| 36 | 8.4 | 3.15 MVA | BI01010001010000000000000515BI0100001147 | 1 | Each |
|---|
| 37 | 8.5 | 4 MVA | BI01010001010000000000000515BI0100001148 | 1 | Each |
|---|
| 38 | 8.6 | 5 MVA | BI01010001010000000000000515BI0100001149 | 1 | Each |
|---|
| 39 | 8.7 | 6.3 MVA | BI01010001010000000000000515BI0100001150 | 1 | Each |
|---|
| 40 | 8.8 | 10 MVA | BI01010001010000000000000515BI0100001151 | 1 | Each |
|---|
| 41 | 9 | Dragging of transformer up to first 50 m (Note: for beyond 50 m, 10% to the quoted rate for every 10 m shall be given upto 100 m MAX) | BI01010001010000000000000515BI0100001152 | | |
|---|
| 42 | 9.1 | 630 KVA | BI01010001010000000000000515BI0100001153 | 1 | Each |
|---|
| 43 | 9.2 | 1 MVA | BI01010001010000000000000515BI0100001154 | 1 | Each |
|---|
| 44 | 9.3 | 2.5 MVA | BI01010001010000000000000515BI0100001155 | 1 | Each |
|---|
| 45 | 9.4 | 3.15 MVA | BI01010001010000000000000515BI0100001156 | 1 | Each |
|---|
| 46 | 9.5 | 4 MVA | BI01010001010000000000000515BI0100001157 | 1 | Each |
|---|
| 47 | 9.6 | 5 MVA | BI01010001010000000000000515BI0100001158 | 1 | Each |
|---|
| 48 | 9.7 | 6.3 MVA | BI01010001010000000000000515BI0100001159 | 1 | Each |
|---|
| 49 | 9.8 | 10 MVA | BI01010001010000000000000515BI0100001160 | 1 | Each |
|---|