| 1 | 1.01 | Providing Assistance in Operational Work at 132KV Sub Station Narainpur, Round the Clock in 3 Shift of 8 Hours each Per Day by Deploying 3 No. Skilled Helper to Assist the T.G. - II on Duty in each Shift for due Operation of the Sub Station Equipments, Transformers etc. as per Standard Practices of UPPTCL and Instructions of S.D.O. / J.E., as per Details in Annexure - A, for Period of 1 Year with all Cost of Men Required for the Job. (1 Job for each Month) | | 12 | Job |
|---|
| 2 | 1.02 | Preventive, Routine & General / Normal Breakdown Maintenance of the Transformers, Outdoor / Indoor Equipments, Control & Relay Panels, RTCC Panels, ACDBs, Battery Chargers, DCDBs, Battery Sets etc., Indoor & Outdoor Lighting Arrangement etc. at 132KV Sub Station Narainpur, as per Details in Annexure - B, Round the Clock and / or as and when Required by a Team Consisting of the Following Technical Personnel as per Standard Practices of UPPTCL and Instructions of S.D.O. / J.E., for the Period of 1 Year, with all Cost of Men, Misc. Consumables, T&Ps etc. Required for the Job except the Spares / Items / Materials / Misc. Consumables / Equipments etc., that shall be Provided by the Department. (1 Job for each Month) :\n(a) T.G. - II (Experienced I.T.I. in Electrical Trade) : 1 No.\n(b) Line Man / Fitter / Technician (Experienced) : 1 No.\n(c) Skilled Helper (Experienced) : 2 No.\n | | 12 | Job |
|---|
| 3 | 1.03 | Daily General Cleaning and Maintenance / Upkeep of Control Room, Associated Offices, Carrier Room, Battery Room, Control Room Building, etc. by Brooming & Mopping alongwith Cleaning of associated Toilets including Brooming of C.C. Roads / Floors, Trench Covers & Scraping of Unwanted Growths in between Joints of the C.C. Roads at 132KV Sub Station Narainpurand associated Colony Premises, as per Details in Annexure - C by Deploying Required Man Power / Sweeper during the Period of 1 Year, with all Cost of Men, Misc. Consumables, Toiletries, T&Ps etc. Required for the Job. (1 Job for each Month) | | 12 | Job |
|---|
| 4 | 1.04 | Regular Maintenance of Lawns / Garden, Flower Bed, Hedges, Flower Vases etc. including Proper Cutting / Trimming of Grass, Hedges, Ornamental Plants / Trees, Seasonal Flowers etc. including Watering, Making Loose Soil around the Plants / Trees, Flower Beds etc. as per Details in Annexure - D including Replacement of Aired Plants, Grass, Seasonal Flowers etc. with Fresh Plants, Grass, Seasonal Flowers etc. of same Variety and Providing of Well Decomposed Organic Manure, during the Period of 1 Year with all Cost of Men, Materials, Misc. Consumables, T&Ps etc. Required for the Job. (Yearly) | | 1 | Job |
|---|
| 5 | 1.05 | Periodic Clearance of Dense Jungle and Cutting of Grass, Kusha& Kansa including Uprooting of the Rank Vegetation, Grass, Bushes, Shrubs etc. by Scrapping of Grass, Bush, Bush Wood, Shrubs & Plants etc. above 2\" over the Ground Level; Weeding Out the Wild Growth Roots, Seeds etc. and Collection of the Foreign Materials like Kankar, Ballast, Pebbles, Waste Papers etc. in Switchyard Area between Pale Fencing & Chain Link Fencing / Security Fencing / Wall, Area around Control Room / Committee Room, Area around Store Shed, Open Store Yard, Colony Area etc. and Disposal of all the Removed Vegetation, Rubbish & Garbage etc. by Throwing it Outside the Periphery of the Sub Station Premises during the Period of 1 Year with all Cost of Men, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work, as per Details below : | | | |
|---|
| 6 | 1.06 | 1st Cutting | | 5500 | M2 |
|---|
| 7 | 1.07 | 2nd Cutting | | 5500 | M2 |
|---|
| 8 | 1.08 | 3rd Cutting | | 5500 | M2 |
|---|
| 9 | 1.09 | 4th Cutting | | 5500 | M2 |
|---|
| 10 | 1.1 | Periodic Up-Rooting of small Trees in Switchyard Area, Area Pale Fencing & Chain Link Fencing / Security Fencing / Wall, Area around Control Room / Committee Room, Area around Store Shed, Open Store Yard, Colony Area etc. by Digging and Taking Out the Complete Root, then Leveling the Ground, so Excavated and Finally, Disposal of all the Removed Vegetation, Rubbish & Garbage etc. by Throwing it Outside the Periphery of the Sub Station Premisesduring the Period of 1 Year with all Cost of Men, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work, as per Details below : | | | |
|---|
| 11 | 1.11 | 1st Up-Rooting | | 200 | No. |
|---|
| 12 | 1.12 | 2nd Up-Rooting | | 200 | No. |
|---|
| 13 | 1.13 | 3rd Up-Rooting | | 200 | No. |
|---|
| 14 | 1.14 | 4th Up-Rooting | | 200 | No. |
|---|
| 15 | 1.15 | Cleaning of cable trench by removing earth deposit & other foreign material bottom of trench, Cleaning of trench and other associated work | | 1 | job |
|---|