Renewal Work Of Bhatwari Barshu Motor Road In Km 3 To 10 By Sdbc Under Annual Work .
Tender Overview
Project Description
Renewal Work Of Bhatwari Barshu Motor Road In Km 3 To 10 By Sdbc Under Annual Work .
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 12-Apr-2021 | Date Changed of opening | Date | 15-Apr-2021 |
BOQ
| Name of Work:Renewal work of bhatwari barshu motor road in km 3 to 10 by SDBC Under annual work. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Road Works | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | WBM Grading 1 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller instages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical SpecificationClause 405.(By Manual Means) including supply of all materials, labour and T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001113 | 31.89 | Cum |
| 3 | 1.02 | WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.(By Manual Means) including supply of all materials, labour and T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001114 | 23.63 | cum |
| 4 | 1.03 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse ggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means including supply of all materials, labour and T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001115 | 88.2 | cum |
| 5 | 1.04 | Prime Coat Medium porosity Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. including supply of all materials, labour and T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001116 | 1470 | sqm |
| 6 | 1.05 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. including supply of all materials, labour and T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001117 | 31125.4 | sqm |
| 7 | 1.06 | Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose.The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) including supply of all materials, labour and T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001118 | 67.62 | cum |
| 8 | 1.07 | Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects) for GradingII (10 mm nominal size) including supply of all materials, labour and T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001119 | 743.88 | cum |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender