EXTENSION OF BID SUBMISSION END DATE AND BID OPENING DATE
Date
27-05-2021
NO. DRDL/22/07P/20/0491/CMM-I
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Basic items and Standard Accessories
2
1.01
3D PRINTER - ULTIMAKER S5 PRO BUNDLE WITH i) Start-up Kit-Tough PLA & PVA Filaments ii) Accessories Kit iii) Red CC Core for Composite / Metal / Ceramic Printing
item1
1
Set
3
1.02
S5 Air Manager
item2
1
No.
4
1.03
S5 Material Station
item3
1
No.
5
1.04
Essential Tool Kit
item4
1
No.
6
1.05
Filament Warmer & Spool Holder
item5
1
Set
7
1.06
Sintering Furnace (450 x 450 x 300mm or better)
item6
1
No.
8
1.07
Computer System loaded with Printing Software
item7
1
No.
9
1.08
Technical documentation
item8
1
Set
10
2
Consumables
11
2.01
Breakaway Filament (750gm)
item9
5
No.
12
2.02
Cleaning Filament (750gm)
item10
2
No.
13
2.03
Tough PLA Filament (750gm)
item11
15
No.
14
2.04
PLA Filament (750gm)
item12
10
No.
15
2.05
Nylon Filament (750gm)
item13
10
No.
16
2.06
PA6-GF (750gm)
item14
5
No.
17
2.07
PA6-CF (750gm)
item15
5
No.
18
2.08
Novamide 1030 (PA6 / 66 reinforced with short CF)
item16
2
No.
19
2.09
Sintering Refractory Ballast - Sintering Carbon
item17
1
Kg.
20
2.1
Refractory Ballast for firing copper and bronze filament
item18
1
Kg.
21
2.11
Refractory Ballast for firing stainless steel and Inconel filament
item19
1
Kg.
22
2.12
Copper Filament
item20
2
No.
23
2.13
SS Filament
item21
2
No.
24
2.14
Aluminium Filament
item22
2
No.
25
2.15
Bronze Filament
item23
2
No.
26
2.16
Zirconium silicate ceramic Filament
item24
2
No.
27
2.17
LAY Ceramic Filament
item25
2
No.
28
2.18
Amaco X-23 Ceramic Filament
item26
2
No.
29
3
Charges
30
3.01
Packing and Forwarding Charges
item27
1
No.
31
3.02
Transit Insurance Charges
item28
1
No.
32
3.03
Transportation charges
item29
1
No.
33
3.04
Installation and commissioning charges
item30
1
No.
34
4
Training Charges
35
4.01
Operational & Maintenance Training for 3D Printing & Sintering Unit
item31
1
No.
36
4.02
Advance Training on Metal & Ceramic Printing
item32
1
No.
37
5
Optional:
38
5.01
Comprehensive AMC cost per year (beyond warranty period specified in RFP) for a period of 03 years (year wise i.e., 1st year, 2nd year & 3rd year)
item33
1
No.
39
5.02
Non- Comprehensive AMC cost per year (beyond warranty period specified in RFP) for a period of 03 years (year wise i.e., 1st year, 2nd year & 3rd year)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.