| 1 | 1 | Design Services (Design, Drawings and Documentation | | | |
|---|
| 2 | 1.1 | Investigation & Survey, Design, Approval of detailed engineering drawings, Preparation of BoQs, estimate for the entire automation of water supply (Gumma WTP) pumping system satisfying the Employer's Requirements | | 1 | Job |
|---|
| 3 | 2 | Raw Water Pumping System plus main control room | | | |
|---|
| 4 | 2.1 | Automation of Raw water intake Pumping system, internal and external electrification,Control room for scada and all other associated works as specified in various chapters of this document,for existing Gumma WTP | | 1 | Job |
|---|
| 5 | 3 | Water Treatment Plant : | | | |
|---|
| 6 | 3.1 | Automation of pre-settling tank, clarrifloculator,filteration unit with all inlet, outlet, drain, overflow pipeworks and control valves, Flowmeter/s, level indicator/s etc. and all other associated works as per Employer's Requirements at Gumma WTP | | 1 | Job |
|---|
| 7 | 4 | Clear Water Reservoir and Pumping System : | | | |
|---|
| 8 | 4.1 | Automation of Clear water reservoir and blower and overhead tank Pumping system, level meters, testing equipments and all other associated works as specified in various chapters of this document at Gumma WTP | | 1 | Job |
|---|
| 9 | 5 | GUMMA PUMP HOUSE, Old Gumma Pumping System: | | | |
|---|
| 10 | 5.1 | 1)Automation & installation of Flow measuring system, pressure measuring system, Quality control instruments, instrument wiring and all other associated works for existing Old Gumma Pump House 1st Stage pumping system. 2)Automation of all Mechanical machinery including Pumping units, control valves, loading/unloading system, ventilation system and all other associated works for existing Old Gumma Pump House 1st Stage pumping system. 3) Automation of all Electrical works including elec.motor, Motorised Actuators for Valves and replacment of esection of pipes as required, New Lubrication Panel and its signals on SCADA for existing Old Gumma Pump House 1st Stage pumping system. | | 1 | Job |
|---|
| 11 | 5.2 | Electrical Panel / Medium Voltage MCC & VFD Pannels (replacement of old) in new MCC panel room (excluding Civil works for new Panel Room) for Old Gumma Pump House 1st stage pumping system. | | 1 | Job |
|---|
| 12 | 6 | New Gumma & Nauti Khad Pumping System | | | |
|---|
| 13 | 6.1 | 1) Automation & installation of Flow measuring system, pressure measuring system, Quality control instruments, instrument wiring and all other associated works. 2) Automation of all Mechanical machinery including Pumping units, control valves, loading/unloading system, ventilation system and all other associated works for existing New Gumma & Nauti Pump House 1st Stage pumping system. 3)Automation of all Electrical works including elec.motor, Motorised Actuators for Valves, New Lubrication Panel and its signals on SCADA, transformer,MCC panel & internal lighting, external lighting etc,for existing New Gumma & Nauti Pump House 1st Stage pumping system. | | 1 | Job |
|---|
| 14 | 6.4 | Electrical Panel / Medium Voltage MCC & VFD Pannels (replacement of old) in new MCC panel room (excluding Civil works for new Panel Room) for New Gumma & Nauti Pump House 1st stage pumping system | | 1 | Job |
|---|
| 15 | 7 | Supply of SCADA system with associated monitoring components at MSC and LSC | | | |
|---|
| 16 | 7.1 | i)SCADA main control center. Ii) SCADA local control stations / Touch Panels (at local Machines / Sub Systems). Iii) Servers, Desktop, LAN, Security,UPS, Display wall, PLC Systems, RTU for collecting data from complete infrastructure at different stages | | 1 | Job |
|---|
| 17 | 8 | Net working | | | |
|---|
| 18 | 8.1 | Automation & SCADA system network, field bus network and ethernet / TCP/IP network all across the plant, including required network switches, routers, cables (Fiber Optics or Copper). | | 1 | Job |
|---|
| 19 | 8.2 | Internet Connectivity at main location and all remote locations, network design and deployment, data connectivity | | 1 | Job |
|---|
| 20 | 8.3 | Supply and installation of security system including CCTV, including image storage server in the SCADA Control Room | | 1 | Job |
|---|
| 21 | 9 | Installation and Commissioning | | | |
|---|
| 22 | 9.1 | Total Project Management, Site Management including Installation, Testing, Commissioning & Trail Run till the handover of system / works | | 1 | Job |
|---|
| 23 | 10 | Operation and Maintenance (for 3 years) | | | |
|---|
| 24 | 10.1 | Manpower for monitoring of SCADA and operations of scheme with Gumma Water Pumping Scheme (for 3 Years) | | 1 | 3years |
|---|