| 1 | 1 | Chairs : | | | |
|---|
| 2 | 2 | PVC chair | | | |
|---|
| 3 | 3 | Ist day | | 1 | Each |
|---|
| 4 | 4 | Subse quent day | | 1 | Each |
|---|
| 5 | 5 | Steel pipe pedded chair | | | |
|---|
| 6 | 6 | Ist day | | 1 | Each |
|---|
| 7 | 7 | Subse quent day | | 1 | Each |
|---|
| 8 | 8 | Tables : | | | |
|---|
| 9 | 9 | Centre Table sunmica Top 2'x4' | | | |
|---|
| 10 | 10 | Ist day | | 1 | Each |
|---|
| 11 | 11 | Subse quent day | | 1 | Each |
|---|
| 12 | 12 | wooden table 6' x 1½ (Babool) | | | |
|---|
| 13 | 13 | Ist day | | 1 | Each |
|---|
| 14 | 14 | Subse quent day | | 1 | Each |
|---|
| 15 | 15 | Wooden Table 6' x 3' (Babool) | | | |
|---|
| 16 | 16 | Ist day | | 1 | Each |
|---|
| 17 | 17 | Subse quent day | | 1 | Each |
|---|
| 18 | 18 | Hire Charges for folded type two SeaterSofaset (cumbed) with good quality white cloth cover | | | |
|---|
| 19 | 19 | Ist day | | 1 | Each |
|---|
| 20 | 20 | Subse quent day | | 1 | Each |
|---|
| 21 | 21 | Floor Covering : | | | |
|---|
| 22 | 22 | Cotton Durry (Old). | | | |
|---|
| 23 | 23 | Ist day | | 1 | Sqm |
|---|
| 24 | 24 | Subse quent day | | 1 | Sqm |
|---|
| 25 | 25 | Cotton Durry (New). | | | |
|---|
| 26 | 26 | Ist day | | 1 | Sqm |
|---|
| 27 | 27 | Subse quent day | | 1 | Sqm |
|---|
| 28 | 28 | Non woven synthtic carpet (Red/Green) (New) | | | |
|---|
| 29 | 29 | Ist day | | 1 | Sqm |
|---|
| 30 | 30 | Subse quent day | | 1 | Sqm |
|---|
| 31 | 31 | Non woven synthtic carpet (Red/Green) (old) | | | |
|---|
| 32 | 32 | Ist day | | 1 | Sqm |
|---|
| 33 | 33 | Subse quent day | | 1 | Sqm |
|---|
| 34 | 34 | Woolen Carpet (New). | | | |
|---|
| 35 | 35 | Ist day | | 1 | Sqm |
|---|
| 36 | 36 | Subse quent day | | 1 | Sqm |
|---|
| 37 | 37 | Woolen Carpet (old). | | | |
|---|
| 38 | 38 | Ist day | | 1 | Sqm |
|---|
| 39 | 39 | Subse quent day | | 1 | Sqm |
|---|
| 40 | 40 | White Cotton chader (Sheet) (Washed) | | | |
|---|
| 41 | 41 | Ist day | | 1 | Each |
|---|
| 42 | 42 | Subse quent day | | 1 | Each |
|---|
| 43 | 43 | Pipe Pandal hight up to 12 to 18 ft | | | |
|---|
| 44 | 44 | Ist day | | 1 | Sqm |
|---|
| 45 | 45 | Subse quent day | | 1 | Sqm |
|---|
| 46 | 46 | 5mm Galvanised Iron (G.I) pipe 6mtr. long with new silk color flag | | | |
|---|
| 47 | 47 | Ist day | | 1 | Each |
|---|
| 48 | 48 | Subse quent day | | 1 | Each |
|---|
| 49 | 49 | Water Proof Tripal. | | | |
|---|
| 50 | 50 | Ist day | | 1 | Sqm |
|---|
| 51 | 51 | Subse quent day | | 1 | Sqm |
|---|
| 52 | 52 | Wooden stage height 120 to 150 cm. with steps made of 50mm dia iron pipe frame with adjustable height system and having smooth top wooden board complete . | | | |
|---|
| 53 | 53 | Ist day | | 1 | Sqm |
|---|
| 54 | 54 | Subse quent day | | 1 | Sqm |
|---|
| 55 | 55 | Cotton mattress | | | |
|---|
| 56 | 56 | Ist day | | 1 | Each |
|---|
| 57 | 57 | Subse quent day | | 1 | Each |
|---|
| 58 | 58 | Dunlop mattress size 6'x3'. | | | |
|---|
| 59 | 59 | Ist day | | 1 | Each |
|---|
| 60 | 60 | Subse quent day | | 1 | Each |
|---|
| 61 | 61 | Massand with white cover. | | | |
|---|
| 62 | 62 | Ist day | | 1 | Each |
|---|
| 63 | 63 | Subse quent day | | 1 | Each |
|---|
| 64 | 64 | Speech Stand having Sunmica top. | | | |
|---|
| 65 | 65 | Ist day | | 1 | Each |
|---|
| 66 | 66 | Subse quent day | | 1 | Each |
|---|
| 67 | 67 | White cotton cloth cover for padded chair inculding ribbon. | | | |
|---|
| 68 | 68 | Ist day | | 1 | Each |
|---|
| 69 | 69 | Subse quent day | | 1 | Each |
|---|
| 70 | 70 | Barricating with Sal ballies as per design including tying with vertical post by coconut strings complete in all respect with two horizontal members hght 1.2 m upto 1.5 m above ground level and vertical supports up to2.5 centre and for 3days period incl. | | 1 | RM |
|---|
| 71 | 71 | Add extra in barricating for each subsequent day after 3 days. | | 1 | RM |
|---|
| 72 | 72 | Making of holes in cement concrete / Bitumen us road by power driven hammer for barricating work as per direction of Engineer in charge. | | 1 | Each |
|---|
| 73 | 73 | VIP Chair leather cushion. | | | |
|---|
| 74 | 74 | Ist day | | 1 | Each |
|---|
| 75 | 75 | Subse quent day | | 1 | Each |
|---|
| 76 | 76 | Add extra for hire charge for providing welded mesh size 25x25mm (16SWG) over barricating (excluding hire charge of barricating). | | | |
|---|
| 77 | 77 | Ist day | | 1 | RM |
|---|
| 78 | 78 | Subse quent day | | 1 | RM |
|---|
| 79 | 79 | Kanat 9'x6' fixed with tent | | | |
|---|
| 80 | 80 | Ist day | | 1 | Each |
|---|
| 81 | 81 | Subse quent day | | 1 | Each |
|---|
| 82 | 82 | Kanat 9'x6' fixed without tent | | | |
|---|
| 83 | 83 | Ist day | | 1 | Each |
|---|
| 84 | 84 | Subse quent day | | 1 | Each |
|---|
| 85 | 85 | water proof tent with pipe pandal supported with Bamboo and Balli frame. | | | |
|---|
| 86 | 86 | Ist day | | 1 | Sqm |
|---|
| 87 | 87 | Subse quent day | | 1 | Sqm |
|---|
| 88 | 88 | curtain cloth (View cutter) made out of steel pipe frame with vertical height 12 feet covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete. | | | |
|---|
| 89 | 89 | Ist day | | 1 | Sqm |
|---|
| 90 | 90 | Subse quent day | | 1 | Sqm |
|---|
| 91 | 91 | Shamiyana Colored. | | | |
|---|
| 92 | 92 | Ist day | | 1 | sqm |
|---|
| 93 | 93 | Subse quent day | | 1 | sqm |
|---|
| 94 | 94 | Jhalar/Frill. | | | |
|---|
| 95 | 95 | Ist day | | 1 | sqm |
|---|
| 96 | 96 | Subse quent day | | 1 | sqm |
|---|
| 97 | 97 | Rajai Full Size. | | | |
|---|
| 98 | 98 | Ist day | | 1 | Each |
|---|
| 99 | 99 | Subse quent day | | 1 | Each |
|---|
| 100 | 100 | Gate pipe. | | | |
|---|
| 101 | 101 | Ist day | | 1 | Each |
|---|
| 102 | 102 | Subse quent day | | 1 | Each |
|---|
| 103 | 103 | Chemical Toilet. | | | |
|---|
| 104 | 104 | Ist day | | 1 | Each |
|---|
| 105 | 105 | Subse quent day | | 1 | Each |
|---|
| 106 | 106 | Stage Pletform. 4' hieght | | | |
|---|
| 107 | 107 | Ist day | | 1 | Sqm |
|---|
| 108 | 108 | Subse quent day | | 1 | Sqm |
|---|
| 109 | 109 | Stage Pletform. 1 ½' hieght | | | |
|---|
| 110 | 110 | Ist day | | 1 | Sqm |
|---|
| 111 | 111 | Subse quent day | | 1 | Sqm |
|---|
| 112 | 112 | Mist fan. | | | |
|---|
| 113 | 113 | Ist day | | 1 | Each |
|---|
| 114 | 114 | Subse quent day | | 1 | Each |
|---|
| 115 | 115 | Desert cooler with water filling & with electric connection. | | | |
|---|
| 116 | 116 | Ist day | | 1 | Each |
|---|
| 117 | 117 | Subse quent day | | 1 | Each |
|---|
| 118 | 118 | Padestal Fan. | | | |
|---|
| 119 | 119 | Ist day | | 1 | Each |
|---|
| 120 | 120 | Subse quent day | | 1 | Each |
|---|
| 121 | 121 | Tank. | | | |
|---|
| 122 | 122 | Ist day | | 1 | Each |
|---|
| 123 | 123 | Subse quent day | | 1 | Each |
|---|
| 124 | 124 | Truss Complete. | | | |
|---|
| 125 | 125 | Ist day | | 1 | mtr. |
|---|
| 126 | 126 | Subse quent day | | 1 | mtr. |
|---|
| 127 | 127 | Jmbo Coolar. | | | |
|---|
| 128 | 128 | Ist day | | 1 | Each |
|---|
| 129 | 129 | Subse quent day | | 1 | Each |
|---|
| 130 | 130 | water proof pandal on bans balli structure | | | |
|---|
| 131 | 131 | Ist day | | 1 | Sqm |
|---|
| 132 | 132 | Subse quent day | | 1 | Sqm |
|---|
| 133 | 133 | Iron pipe bearicating. | | | |
|---|
| 134 | 134 | Ist day | | 1 | mtr. |
|---|
| 135 | 135 | Subse quent day | | 1 | mtr. |
|---|
| 136 | 136 | Gas heater with celinder | | | |
|---|
| 137 | 137 | Ist day | | 1 | Each |
|---|
| 138 | 138 | Subse quent day | | 1 | Each |
|---|
| 139 | 139 | Heritage printed canopy in various size | | | |
|---|
| 140 | 140 | Ist day | | 1 | Sqft. |
|---|
| 141 | 141 | Subse quent day | | 1 | Sqft. |
|---|
| 142 | 142 | Laminated mirror centre table | | | |
|---|
| 143 | 143 | Ist day | | 1 | Nos. |
|---|
| 144 | 144 | Subse quent day | | 1 | Nos. |
|---|
| 145 | 145 | Garden Umbrellas | | | |
|---|
| 146 | 146 | Ist day | | 1 | Nos. |
|---|
| 147 | 147 | Subse quent day | | 1 | Nos. |
|---|
| 148 | 148 | Zumbo Fans | | | |
|---|
| 149 | 149 | Ist day | | 1 | Nos. |
|---|
| 150 | 150 | Subse quent day | | 1 | Nos. |
|---|
| 151 | 151 | Water proof truss | | | |
|---|
| 152 | 152 | Ist day | | 1 | Sqft. |
|---|
| 153 | 153 | Subse quent day | | 1 | Sqft. |
|---|
| 154 | 154 | Providing & Placing without intermediate (Support dome type superstructure of iron frame of 30' height at middle and 10' height at ends including new white ceiling cloth and jhallar on outer periphery including water proof tripal at top to be cemaflus with white clothing complete) | | | |
|---|
| 155 | 155 | Ist day | | 1 | Sqft. |
|---|
| 156 | 156 | Subse quent day | | 1 | Sqft. |
|---|
| 157 | 157 | White leather/velvet sofa for V.V.I.P. | | | |
|---|
| 158 | 158 | Ist day | | 1 | Nos. |
|---|
| 159 | 159 | Subse quent day | | 1 | Nos. |
|---|
| 160 | 160 | High back black leather chair | | | |
|---|
| 161 | 161 | Ist day | | 1 | Nos. |
|---|
| 162 | 162 | Subse quent day | | 1 | Nos. |
|---|
| 163 | 163 | Stage platfarm on 8 feet height | | | |
|---|
| 164 | 164 | Ist day | | 1 | Sqft. |
|---|
| 165 | 165 | Subse quent day | | 1 | Sqft. |
|---|
| 166 | 166 | White masking on bottom frame in various size | | | |
|---|
| 167 | 167 | Ist day | | 1 | Sqft. |
|---|
| 168 | 168 | Subse quent day | | 1 | Sqft. |
|---|
| 169 | 169 | Flags | | | |
|---|
| 170 | 170 | Ist day | | 1 | Nos. |
|---|
| 171 | 171 | Subse quent day | | 1 | Nos. |
|---|
| 172 | 172 | Wooden Platfarm on 6 Inch height | | | |
|---|
| 173 | 173 | Ist day | | 1 | Sqft. |
|---|
| 174 | 174 | Subse quent day | | 1 | Sqft. |
|---|
| 175 | 175 | Machan on Iron & wooden bans-balli frame on 10 feet to 12 feet height | | | |
|---|
| 176 | 176 | Ist day | | 1 | Sqft. |
|---|
| 177 | 177 | Subse quent day | | 1 | Sqft. |
|---|
| 178 | 178 | Water proof Dom with trus steel structure, inner ceiling & curtains on 90' span | | | |
|---|
| 179 | 179 | Ist day | | 1 | Sqm |
|---|
| 180 | 180 | Subse quent day | | 1 | Sqm |
|---|
| 181 | 181 | Truss pandal with covering fit from 14 ft. to 18 ht. | | | |
|---|
| 182 | 182 | Ist day | | 1 | Sqft |
|---|
| 183 | 183 | Subse quent day | | 1 | Sqft |
|---|
| 184 | 184 | Truss in width fit from 20 ft. to 40 ft. | | | |
|---|
| 185 | 185 | Ist day | | 1 | Sqft |
|---|
| 186 | 186 | Subse quent day | | 1 | Sqft |
|---|
| 187 | 187 | Providing mobiles toilets on hire charges basis mounted with one WC should be fitted with stainless steel pressure jet flushing system effuent tank and fresh water tank having capacity notn less then 420 liters and 130 liter respectively. There should be toilet paper holder with paper roll and shoap with a scap disc and washbasin having pressure jet pump and wast pipe of wahs basin should be deployed of each toilets for cleaning upkeepment during fanction including loading, unlading carriage & placing in position & empting the tank when ever required ect. all complete as per direction of engineer-in-charge. (Rate are including tax.) | | | |
|---|
| 188 | 188 | Ist day | | 1 | Each Per day unit |
|---|
| 189 | 189 | Subse quent day | | 1 | Each Per day unit |
|---|
| 190 | 190 | Kanati fixed with Tent (15'x6') | | | |
|---|
| 191 | 191 | Ist day | | 1 | Each |
|---|
| 192 | 192 | Subse quent day | | 1 | Each |
|---|
| 193 | 193 | Kanati fixed with out Tent (15'x6') | | | |
|---|
| 194 | 194 | Ist day | | 1 | Each |
|---|
| 195 | 195 | Subse quent day | | 1 | Each |
|---|
| 196 | 196 | German hanger/aluminium dome | | | |
|---|
| 197 | 197 | Ist day | | 1 | Per Sqft. |
|---|
| 198 | 198 | Subse quent day | | 1 | Per Sqft. |
|---|
| 199 | 199 | Chunnat masking | | | |
|---|
| 200 | 200 | Ist day | | 1 | Sqft. Per day |
|---|
| 201 | 201 | Subse quent day | | 1 | Sqft. Per day |
|---|
| 202 | 202 | Trussgate | | | |
|---|
| 203 | 203 | Ist day | | 1 | Each |
|---|
| 204 | 204 | Subse quent day | | 1 | Each |
|---|
| 205 | 205 | Delux Sofa single seater | | | |
|---|
| 206 | 206 | Ist day | | 1 | Each Per day |
|---|
| 207 | 207 | Subse quent day | | 1 | Each Per day |
|---|
| 208 | 208 | Delux Sofa Two seater | | | |
|---|
| 209 | 209 | Ist day | | 1 | Each Per day |
|---|
| 210 | 210 | Subse quent day | | 1 | Each Per day |
|---|
| 211 | 211 | Optnan stall Size (3mtr.x3mtr.) | | | |
|---|
| 212 | 212 | Ist day | | 1 | Each Per day |
|---|
| 213 | 213 | Subse quent day | | 1 | Each Per day |
|---|
| 214 | 214 | Iron frame platfrom with 18mm plywood on top in various sizes. | | | |
|---|
| 215 | 215 | Ist day | | 1 | Sqft. Per day |
|---|
| 216 | 216 | Subse quent day | | 1 | Sqft. Per day |
|---|
| 217 | 217 | Printed non woolen carpet | | | |
|---|
| 218 | 218 | Ist day | | 1 | sqft |
|---|
| 219 | 219 | Subse quent day | | 1 | sqft |
|---|
| 220 | 220 | Teen wall (Iron) | | | |
|---|
| 221 | 221 | Ist day | | 1 | sqft |
|---|
| 222 | 222 | Subse quent day | | 1 | sqft |
|---|
| 223 | 223 | Octnum table size 2'x2.5' | | | |
|---|
| 224 | 224 | Ist day | | 1 | Nos |
|---|
| 225 | 225 | Subse quent day | | 1 | Nos |
|---|
| 226 | 226 | Tight cloth masking | | | |
|---|
| 227 | 227 | Ist day | | 1 | sqft |
|---|
| 228 | 228 | Subse quent day | | 1 | sqft |
|---|
| 229 | 229 | Iron/steel railing infront of stage | | | |
|---|
| 230 | 230 | Ist day | | 1 | rft |
|---|
| 231 | 231 | Subse quent day | | 1 | rft |
|---|
| 232 | 232 | Iron hanger | | | |
|---|
| 233 | 233 | Ist day | | 1 | sqft |
|---|
| 234 | 234 | Subse quent day | | 1 | sqft |
|---|
| 235 | 235 | Swiss tent type canopy in various size | | | |
|---|
| 236 | 236 | Ist day | | 1 | sqft |
|---|
| 237 | 237 | Subse quent day | | 1 | sqft |
|---|
| 238 | 238 | Supremo red valvet chair for VVIP | | | |
|---|
| 239 | 239 | Ist day | | 1 | Nos |
|---|
| 240 | 240 | Subse quent day | | 1 | Nos |
|---|
| 241 | 241 | Iron sheet table size 2'x6' | | | |
|---|
| 242 | 242 | Ist day | | 1 | Nos |
|---|
| 243 | 243 | Subse quent day | | 1 | Nos |
|---|
| 244 | 244 | Mojobarricating in iron frame | | | |
|---|
| 245 | 245 | Ist day | | 1 | sqft |
|---|
| 246 | 246 | Subse quent day | | 1 | sqft |
|---|
| 247 | 247 | Wooden center/coffe table | | | |
|---|
| 248 | 248 | Ist day | | 1 | Nos |
|---|
| 249 | 249 | Subse quent day | | 1 | Nos |
|---|
| 250 | 250 | Steelness steel/Acyrilc podium for VVIP | | | |
|---|
| 251 | 251 | Ist day | | 1 | Nos |
|---|
| 252 | 252 | Subse quent day | | 1 | Nos |
|---|