}

Fixing Of Rate Contract For Maintenance/Emergent Works Of Distribution Network In The Jurisdiction Of Electric Division-Ii Jpdcl Gandhi Nagar Jammu During Financial Year 2021-22 ., Executive Engineer ED-II Jammu-Jammu And Kashmir

Power Development Department has published Fixing Of Rate Contract For Maintenance/Emergent Works Of Distribution Network In The Jurisdiction Of Electric Division-Ii Jpdcl Gandhi Nagar Jammu During Financial Year 2021-22 .. Submission Date for this Tender is 15-04-2021. wrist watch Tenders in Executive Engineer ED-II Jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

27547005
Fixing Of Rate Contract For Maintenance/Emergent Works Of Distribution Network In The Jurisdiction Of Electric Division-Ii Jpdcl Gandhi Nagar Jammu During Financial Year 2021-22 .
National Competitive Bid
Indian
Jammu And Kashmir
Executive Engineer ED-II Jammu
15-04-2021

Tender Details

Fixing Of Rate Contract For Maintenance / Emergent Works Of Distribution Network In The Jurisdiction Of Electric Division-Ii Jpdcl Gandhi Nagar Jammu During Financial Year 2021-22 .-1 Carriage Of T And P Items 2 Branch Cutting 3 Route Clearance For Making Path 4 Unloading Of Pcc 8 Mtr Pole 5 Average Carriage Of Pcc 8 Mtr Pole Upto 100 Mtr 6 Average Carriage Of Pcc 8 Mtr Pole Upto 100 - 200 Mtr 7 Erection Of Pcc 8 Mtr Pole 8 Dismantling Of Pcc Pole 8 Mtr Long 9 Unloading Of St 8 Mtr Pole 10 Average Carriage Of St 8 Mtr Pole Upto 100 Mtr 11 Average Carriage Of St 8 Mtr Pole Upto 100 - 200 Mtr 12 Erection Of St 8 Mtr Pole 13 Dismantling Of St Pole 8 Mtr Long 14 Unloading Of Pcc 9 Mtr Pole 15 Average Carriage Of Pcc 9 Mtr Pole Upto 100 Mtr 16 Average Carriage Of Pcc 9 Mtr Pole Upto 100 - 200 Mtr 17 Erection Of Pcc 9 Mtr Pole 18 Dismantling Of Pcc Pole 9 Mtr Long 19 Unloading Of St 9 Mtr Pole 20 Average Carriage Of St 9 Mtr Pole Upto 100 Mtr 21 Average Carriage Of St 9 Mtr Pole Upto 100 - 200 Mtr 22 Erection Of St 9 Mtr Pole 23 Dismantling Of St Pole 9 Mtr Long 24 Unloading Of Pcc 11 Mtr Pole 25 Average Carriage Of Pcc 11 Mtr Pole Upto 100 Mtr 26 Average Carriage Of Pcc 11 Mtr Pole Upto 100 - 200 Mtr 27 Erection Of Pcc 11 Mtr Pole 28 Dismantling Of Pcc Pole11 Mtr Long 29 Unloading Of St 11 Mtr Pole 30 Average Carriage Of St 11 Mtr Pole Upto 100 Mtr 31 Average Carriage Of St 11 Mtr Pole Upto 100 - 200 Mtr 32 Erection Of St 11 Mtr Pole 33 Dismantling Of St Pole 11 Mtr Long 34 Unloading Of St 13 Mtr Pole 35 Average Carriage Of St 13 Mtr Pole Upto 100 Mtr 36 Average Carriage Of St 13 Mtr Pole Upto 100 - 200 Mtr 37 Erection Of St 13 Mtr Pole 38 Dismantling Of St Pole 13 Mtr Long 39 Straightening Of Tilted 8Mtr Pcc Pole 40 Straightening Of Tilted 9Mtr Pcc Pole 41 Straightening Of Tilted 8Mtr St Pole 42 Straightening Of Tilted 9Mtr St Pole 43 Straightening Of Tilted 11Mtr St Pole 44 Fixing Of Barbed Wire For Anti Climbing 45 Erection Of Danger Plates With Clamps 46 Erection Of Anti Climbing Device With Clamps 47 Painting Of Lt St Poles ( 8Mtr, 9Mtr, 11Mtr ) And Allied Material 48 Painting Of Ht St Poles ( 8Mtr, 9Mtr, 11Mtr ) And Allied Material 49 Painting Of Substation Poles And Allied Material 50 Cement Bottoming Of Pcc / St Poles Of All Sizes ( Material For Cement Bottoming Is To Be Provided By Department ) 51 Cement Bottoming Of Pcc / St Poles Of All Sizes ( Material For Cement Bottoming Is To Be Provided By Contractor ) 52 Unloading Of Line Materials 53 Watch And Ward Of Material 54 Punching / Making Of Holes On M S Channel 55 Punching / Making Of Holes On M S Angle Iron / Braces 56 Fabrication Of Ms Steel I.E Channel , Angle Braces Etc At Site As Requirements 57 Fixing Of M S Channels 9 Feet Long 58 Fixing Of Ms Channels 4.5 / 3 Feet Long Along With Braces 59 Fixing Of M S Angle Iron 9 Feet Long 60 Fixing Of Ms Angle Iron 5 / 4.5 / 3 Feet Long 61 Dismantling Of M S Channels 9 Feet Long 62 Dismantling Of Ms Channels 4.5 / 3 Feet Long Along With Braces 63 Dismantling Of M S Angle Iron 9 Feet Long 64 Dismantling Of Ms Angle Iron 5 / 4.5 / 3 Feet Long 65 Fixing Of U-Clamps And Shackle Insulators 66 Fixing / Installation Of 11 Kv Pin Insulators With Pins 67 Fixing / Installation Of 11 Kv Disc Insulators With Fittings 68 Dismantling Of Pin / Disc / Shackle Insulators 69 Installation Of Link / Do / Hg / Knife / La Set 70 Dismantling Of Link / Do / Hg / Knife / La Set 71 Installation Of Go Set 72 Dismantling Of Go Set 73 Unloading Of Ct / Pt Unit 74 Average Carriage Of Ct / Pt Unit Upto 100 Mtr 75 Average Carriage Of Ct / Pt Upto 100 - 200 Mtr 76 Erection Of Ct / Pt Unit Along With Trivector Meter 77 Erection Of Ctpt Unit 78 Testing And Commissioning Of Ct / Pt Unit 79 Earthing Of Testing And Commissioning Of Ct / Pt Unit 80 Unloading Of 25 / 63 / 100Kva Transformer 81 Unloading Of 250 / 400 / 500 / 630 Kva Transformer 82 Average Carriage Of 25 / 63 / 100 Kva Upto 100 Mtr 83 Average Carriage Of 25 / 63 / 100 Kva 100 - 200 Mtr 84 Average Carriage Of 250 / 400 / 500 / 630 Kva Upto 100 Mtr 85 Average Carriage Of 250 / 400 / 500 / 630 Kva 100 - 200 Mtr 86 Mounting Of 25 / 63 / 100 Kva Transformer 87 Mounting Of 250 / 400 / 500 / 630 Kva Transformer 88 Unmounting Of 25 / 63 / 100 Kva Transformer 89 Unmounting Of 250 / 400 / 500 / 630 Kva Transformer 90 Erection Of Hvds 25Kva 91 Dismantling Of Hvds 25Kva 92 Earthing Of Hvds 25Kva 93 Fixing Of Jumpers 94 Dismantling Of Jumper 95 Earthing Of Poles For Ht Line 96 Earthing Of Poles For Lt Line 97 Earthing Of Substation Complete ( Poles, Transformer, La ) 98 Fixing Of Lt Circuit Component Of Substation ( Lt Cables, Thimbles, Busbar, Shackle Insulators ) With Fuse Set / Mccb With Box 99 Dismantling Of Lt Circuit Component Of Substation ( Lt Cables, Thimbles, Busbar, Shackle Insulators ) With Fuse Set / Mccb With Box 100 Testing And Commissioning Of Substation 101 Laying Of Acsr Conductor On Ground 20 / 30 Mmsq 102 Stringing Of Acsr Conductor 20 / 30Mmsq / Squirel / Weasel 103 Dismantling Of Old Squirell Acsr Conductor 104 Dismantling Of Old Weasel Acsr Conductor 105 Laying Of Acsr Conductor On Ground 50 / 100 Mmsq 106 Stringing Of Acsr Conductor 50 / 100 Mmsq / Rabbit / Dog 107 Dismantling Of Old Rabbit Acsr Conductor 108 Dismantling Of Old Dog Acsr Conductor 109 Tightening Of Loose Conductor 110 Erection Of Guys In Ht / Lt Line 111 Fixing Of Suspension / Anchoring Clamps 112 Laying Of Ht Ab / Xlpe Cable 25 / 35 / 50 Mmsq 113 Dismantling Of Ht Ab / Xlpe Cable 25 / 35 / 50 Mmsq 114 Laying Of Ht Ab / Xlpe Cable 70 / 95 / 120 Mmsq 115 Dismantling Of Ht Ab / Xlpe Cable 70 / 95 / 120 Mmsq 116 Laying Of Ht Ab / Xlpe Cable 150 / 185Mmsq 117 Dismantling Of Ht Ab / Xlpe Cable 150 / 185Mmsq 118 Laying Of Ht Ab / Xlpe Cable 240 / 300 Mmsq 119 Dismantling Of Lt Ab / Xlpe Cable 240 / 300 Mmsq 120 Laying Of Lt Ab / Xlpe Cable 25 / 35 / 50 Mmsq 121 Dismantling Of Lt Ab / Xlpe Cable 25 / 35 / 50 Mmsq 122 Laying Of Lt Ab / Xlpe Cable 70 / 95 / 120 Mmsq 123 Dismantling Of Lt Ab / Xlpe Cable 70 / 95 / 120 Mmsq 124 Laying Of Lt Ab / Xlpe Cable 150 / 185Mmsq 125 Dismantling Of Lt Ab / Xlpe Cable 150 / 185Mmsq 126 Laying Of Lt Ab / Xlpe Cable 240 / 300 Mmsq 127 Dismantling Of Ht Ab / Xlpe Cable 240 / 300 Mmsq 128 Fixing Of Heat Shrinkable Outdoor Kit For Ab / Xlpe Cables Of Ht / Lt Lines 129 Fixing Of Mid Span Straight Jointer Kit For Ab / Xlpe Cables Of Ht / Lt Lines 130 Earthing Of Cable 131 Testing And Commissioning Of Ab / Xlpe Cables Of Ht / Lt Lines 132 Testing And Commissioning Of Ht / Lt Lines 133 Inspection Of Ab / Xlpe Cables Of Ht / Lt Lines 134 Inspection Of Ht / Lt Lines 135 Fixing Of Ipc 120 / 50Mm 136 Fixing Of Single Phase Meters 137 Fixing Of Three Phase Meters 138 Dismantling Of Single Phase Meters 139 Dismantling Of Three Phase Meters 140 Laying Of Service Wire Twin Core 4 / 6 Mmsq 141 Laying Of Service Wire Twin Core 10 / 16 Mmsq 142 Dismantling Of Service Wire Twin Core 4 / 6 Mmsq 143 Dismantling Of Service Wire Twin Core 10 / 16 Mmsq 144 Installation Of 3 Phase 4 Wire Progidy Energy Meter 145 Dismantling Of 3 Phase 4 Wire Progidy Energy Meter 146 Erection Of Db / Meter Box On Pcc / St Poles 147 Fixing Of Guard Netting Of Ht / Lt Line 148 Dismantling Of Guard Netting Of Ht / Lt Line 149 Supply And Installation Of Chain Link Fencing Of 11 / 0.415 Kv Yard Of Substation By Way Of Mass Concrete In Foundations And Chain Link Fencing Of 6 Ft Height With Access Door Facility Including Painting With Aluminum Paint Of Approved Brand And Manufacture To Give An Even Shade. 150 Write Back Of Damaged Material And Hardware Fitting To Divisional Store 151 Write Back Of Dismantled Material To Divisional Store Miran Sahib Jammu

Key Value

Document Fees
INR 500 /-
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Fixing of Rate Contract for Maintainance/Emergent works of Distribution Network in the jurisdiction of Electric Division-II JPDCLJammu.
1 Item Description Item Code / Make Quantity Units
1 1 Carriage of T and P items BI01010001010000000000000515BI0100001113 1 Job
2 2 Branch Cutting BI01010001010000000000000515BI0100001114 1 Km
3 3 Route clearance for making path BI01010001010000000000000515BI0100001115 1 Mtr
4 4 Unloading of PCC 8 Mtr Pole BI01010001010000000000000515BI0100001116 1 No
5 5 Average carriage of PCC 8 Mtr Pole upto 100 Mtr BI01010001010000000000000515BI0100001117 1 No
6 6 Average carriage of PCC 8 Mtr Pole upto 100 - 200 Mtr BI01010001010000000000000515BI0100001118 1 No
7 7 Erection of PCC 8 Mtr Pole BI01010001010000000000000515BI0100001119 1 No
8 8 Dismantling of PCC Pole 8 Mtr Long BI01010001010000000000000515BI0100001120 1 No
9 9 Unloading of ST 8 Mtr Pole BI01010001010000000000000515BI0100001121 1 No
10 10 Average carriage of ST 8 Mtr Pole upto 100 Mtr BI01010001010000000000000515BI0100001122 1 No
11 11 Average carriage of ST 8 Mtr Pole upto 100 - 200 Mtr BI01010001010000000000000515BI0100001123 1 No
12 12 Erection of ST 8 Mtr Pole BI01010001010000000000000515BI0100001124 1 No
13 13 Dismantling of ST Pole 8 Mtr Long BI01010001010000000000000515BI0100001125 1 No
14 14 Unloading of PCC 9 Mtr Pole BI01010001010000000000000515BI0100001126 1 No
15 15 Average carriage of PCC 9 Mtr Pole upto 100 Mtr BI01010001010000000000000515BI0100001127 1 No
16 16 Average carriage of PCC 9 Mtr Pole upto 100 - 200 Mtr BI01010001010000000000000515BI0100001128 1 No
17 17 Erection of PCC 9 Mtr Pole BI01010001010000000000000515BI0100001129 1 No
18 18 Dismantling of PCC Pole 9 Mtr Long BI01010001010000000000000515BI0100001130 1 No
19 19 Unloading of ST 9 Mtr Pole BI01010001010000000000000515BI0100001131 1 No
20 20 Average carriage of ST 9 Mtr Pole upto 100 Mtr BI01010001010000000000000515BI0100001132 1 No
21 21 Average carriage of ST 9 Mtr Pole upto 100 - 200 Mtr BI01010001010000000000000515BI0100001133 1 No
22 22 Erection of ST 9 Mtr Pole BI01010001010000000000000515BI0100001134 1 No
23 23 Dismantling of ST Pole 9 Mtr Long BI01010001010000000000000515BI0100001135 1 No
24 24 Unloading of PCC 11 Mtr Pole BI01010001010000000000000515BI0100001136 1 No
25 25 Average carriage of PCC 11 Mtr Pole upto 100 Mtr BI01010001010000000000000515BI0100001137 1 No
26 26 Average carriage of PCC 11 Mtr Pole upto 100 - 200 Mtr BI01010001010000000000000515BI0100001138 1 No
27 27 Erection of PCC 11 Mtr Pole BI01010001010000000000000515BI0100001139 1 No
28 28 Dismantling of PCC Pole11 Mtr Long BI01010001010000000000000515BI0100001140 1 No
29 29 Unloading of ST 11 Mtr Pole BI01010001010000000000000515BI0100001141 1 No
30 30 Average carriage of ST 11 Mtr Pole upto 100 Mtr BI01010001010000000000000515BI0100001142 1 No
31 31 Average carriage of ST 11 Mtr Pole upto 100 - 200 Mtr BI01010001010000000000000515BI0100001143 1 No
32 32 Erection of ST 11 Mtr Pole BI01010001010000000000000515BI0100001144 1 No
33 33 Dismantling of ST Pole 11 Mtr Long BI01010001010000000000000515BI0100001145 1 No
34 34 Unloading of ST 13 Mtr Pole BI01010001010000000000000515BI0100001146 1 No
35 35 Average carriage of ST 13 Mtr Pole upto 100 Mtr BI01010001010000000000000515BI0100001147 1 No
36 36 Average carriage of ST 13 Mtr Pole upto 100 - 200 Mtr BI01010001010000000000000515BI0100001148 1 No
37 37 Erection of ST 13 Mtr Pole BI01010001010000000000000515BI0100001149 1 No
38 38 Dismantling of ST Pole 13 Mtr Long BI01010001010000000000000515BI0100001150 1 No
39 39 Straightening of tilted 8Mtr PCC pole BI01010001010000000000000515BI0100001151 1 No
40 40 Straightening of tilted 9Mtr PCC pole BI01010001010000000000000515BI0100001152 1 No
41 41 Straightening of tilted 8Mtr ST pole BI01010001010000000000000515BI0100001153 1 No
42 42 Straightening of tilted 9Mtr ST pole BI01010001010000000000000515BI0100001154 1 No
43 43 Straightening of tilted 11Mtr ST pole BI01010001010000000000000515BI0100001155 1 No
44 44 Fixing of Barbed Wire for anti Climbing BI01010001010000000000000515BI0100001156 1 Kg
45 45 Erection of Danger Plates with Clamps BI01010001010000000000000515BI0100001157 1 No
46 46 Erection of Anti Climbing Device with Clamps BI01010001010000000000000515BI0100001158 1 No
47 47 Painting of LT ST Poles (8Mtr,9Mtr,11Mtr) and allied material BI01010001010000000000000515BI0100001159 1 No
48 48 Painting of HT ST Poles (8Mtr,9Mtr,11Mtr) and allied material BI01010001010000000000000515BI0100001160 1 No
49 49 Painting of Substation Poles and allied material BI01010001010000000000000515BI0100001161 1 No
50 50 Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by department) BI01010001010000000000000515BI0100001162 1 No
51 51 Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor) BI01010001010000000000000515BI0100001163 1 No
52 52 Unloading of Line Materials BI01010001010000000000000515BI0100001164 1 Qtl
53 53 Watch and Ward of Material BI01010001010000000000000515BI0100001165 1 Job
54 54 Punching/Making of Holes on M S Channel BI01010001010000000000000515BI0100001166 1 No
55 55 Punching/Making of Holes on M S Angle Iron/Braces BI01010001010000000000000515BI0100001167 1 No
56 56 Fabrication of Ms Steel i.e Channel , Angle Braces etc at site as requirements BI01010001010000000000000515BI0100001168 1 Kg
57 57 Fixing of M S Channels 9 feet long BI01010001010000000000000515BI0100001169 1 No
58 58 Fixing of MS Channels 4.5/3 feet long along with Braces BI01010001010000000000000515BI0100001170 1 No
59 59 Fixing of M S Angle Iron 9 feet long BI01010001010000000000000515BI0100001171 1 No
60 60 Fixing of MS Angle Iron 5/4.5/3 feet long BI01010001010000000000000515BI0100001172 1 No
61 61 Dismantling of M S Channels 9 feet long BI01010001010000000000000515BI0100001173 1 No
62 62 Dismantling of MS Channels 4.5/3 feet long along with Braces BI01010001010000000000000515BI0100001174 1 No
63 63 Dismantling of M S Angle Iron 9 feet long BI01010001010000000000000515BI0100001175 1 No
64 64 Dismantling of MS Angle Iron 5/4.5/3 feet long BI01010001010000000000000515BI0100001176 1 No
65 65 Fixing of U-Clamps and Shackle Insulators BI01010001010000000000000515BI0100001177 1 No
66 66 Fixing/Installation of 11 KV Pin Insulators with Pins BI01010001010000000000000515BI0100001178 1 No
67 67 Fixing/Installation of 11 KV Disc Insulators with fittings BI01010001010000000000000515BI0100001179 1 No
68 68 Dismantling of Pin/ Disc/Shackle Insulators BI01010001010000000000000515BI0100001180 1 No
69 69 Installation of Link/DO/HG/Knife/LA Set BI01010001010000000000000515BI0100001181 1 Set
70 70 Dismantling of Link/DO/HG/Knife/LA Set BI01010001010000000000000515BI0100001182 1 Set
71 71 Installation of GO Set BI01010001010000000000000515BI0100001183 1 Set
72 72 Dismantling of GO Set BI01010001010000000000000515BI0100001184 1 Set
73 73 Unloading of CT/PT Unit BI01010001010000000000000515BI0100001185 1 No
74 74 Average carriage of CT/PT Unit upto 100 Mtr BI01010001010000000000000515BI0100001186 1 No
75 75 Average carriage of CT/PT upto 100 - 200 Mtr BI01010001010000000000000515BI0100001187 1 No
76 76 Erection of CT/PT Unit along with Trivector Meter BI01010001010000000000000515BI0100001188 1 No
77 77 Erection of CTPT Unit BI01010001010000000000000515BI0100001189 1 No
78 78 Testing and commissioning of CT/PT Unit BI01010001010000000000000515BI0100001190 1 No
79 79 Earthing of Testing and commissioning of CT/PT Unit BI01010001010000000000000515BI0100001191 1 No
80 80 Unloading of 25/63/100KVA Transformer BI01010001010000000000000515BI0100001192 1 No
81 81 Unloading of 250/400/500/630 KVA Transformer BI01010001010000000000000515BI0100001193 1 No
82 82 Average carriage of 25/63/100 KVA upto 100 Mtr BI01010001010000000000000515BI0100001194 1 No
83 83 Average carriage of 25/63/100 KVA 100 - 200 Mtr BI01010001010000000000000515BI0100001195 1 No
84 84 Average carriage of 250/400/500/630 KVA upto 100 Mtr BI01010001010000000000000515BI0100001196 1 No
85 85 Average carriage of 250/400/500/630 KVA 100 - 200 Mtr BI01010001010000000000000515BI0100001197 1 No
86 86 Mounting of 25/63/100 KVA Transformer BI01010001010000000000000515BI0100001198 1 No
87 87 Mounting of 250/400/500/630 KVA Transformer BI01010001010000000000000515BI0100001199 1 No
88 88 Unmounting of 25/63/100 KVA Transformer BI01010001010000000000000515BI0100001200 1 No
89 89 Unmounting of 250/400/500/630 KVA Transformer BI01010001010000000000000515BI0100001201 1 No
90 90 Erection of HVDS 25KVA BI01010001010000000000000515BI0100001202 1 No
91 91 Dismantling of HVDS 25KVA BI01010001010000000000000515BI0100001203 1 No
92 92 Earthing of HVDS 25KVA BI01010001010000000000000515BI0100001204 1 No
93 93 Fixing of Jumpers BI01010001010000000000000515BI0100001205 1 No
94 94 Dismantling of Jumper BI01010001010000000000000515BI0100001206 1 No
95 95 Earthing of poles for HT Line BI01010001010000000000000515BI0100001207 1 No
96 96 Earthing of poles for LT Line BI01010001010000000000000515BI0100001208 1 No
97 97 Earthing of Substation complete(Poles,Transformer,LA) BI01010001010000000000000515BI0100001209 3 No
98 98 Fixing of LT Circuit Component of Substation (LT cables, Thimbles, Busbar, Shackle insulators) with Fuse Set / MCCB with Box BI01010001010000000000000515BI0100001210 1 No
99 99 Dismantling of LT Circuit Component of Substation (LT cables, Thimbles, Busbar, Shackle insulators) with Fuse Set / MCCB with Box BI01010001010000000000000515BI0100001211 1 No
100 100 Testing and commissioning of Substation BI01010001010000000000000515BI0100001212 1 No
101 101 Laying of ACSR Conductor on Ground 20/30 mmsq BI01010001010000000000000515BI0100001213 1 Mtr
102 102 Stringing of ACSR Conductor 20/30mmsq/Squirel /Weasel BI01010001010000000000000515BI0100001214 1 Mtr
103 103 Dismantling of Old Squirell ACSR Conductor BI01010001010000000000000515BI0100001215 1 Mtr
104 104 Dismantling of Old Weasel ACSR Conductor BI01010001010000000000000515BI0100001216 1 Mtr
105 105 Laying of ACSR Conductor on Ground 50/100 mmsq BI01010001010000000000000515BI0100001217 1 Mtr
106 106 Stringing of ACSR Conductor 50/100 mmsq/Rabbit/Dog BI01010001010000000000000515BI0100001218 1 Mtr
107 107 Dismantling of Old Rabbit ACSR Conductor BI01010001010000000000000515BI0100001219 1 Mtr
108 108 Dismantling of Old Dog ACSR Conductor BI01010001010000000000000515BI0100001220 1 Mtr
109 109 Tightening of loose conductor BI01010001010000000000000515BI0100001221 1 Mtr
110 110 Erection of Guys in HT/LT Line BI01010001010000000000000515BI0100001222 1 No
111 111 Fixing of Suspension/Anchoring Clamps BI01010001010000000000000515BI0100001223 1 No
112 112 Laying of HT AB/XLPE Cable 25/35/50 mmsq BI01010001010000000000000515BI0100001224 1 Mtr
113 113 Dismantling of HT AB/XLPE Cable 25/35/50 mmsq BI01010001010000000000000515BI0100001225 1 Mtr
114 114 Laying of HT AB/XLPE Cable 70/95/120 mmsq BI01010001010000000000000515BI0100001226 1 Mtr
115 115 Dismantling of HT AB/XLPE Cable 70/95/120 mmsq BI01010001010000000000000515BI0100001227 1 Mtr
116 116 Laying of HT AB/XLPE Cable 150/185mmsq BI01010001010000000000000515BI0100001228 1 Mtr
117 117 Dismantling of HT AB/XLPE Cable 150/185mmsq BI01010001010000000000000515BI0100001229 1 Mtr
118 118 Laying of HT AB/XLPE Cable 240/300 mmsq BI01010001010000000000000515BI0100001230 1 Mtr
119 119 Dismantling of LT AB/XLPE Cable 240/300 mmsq BI01010001010000000000000515BI0100001231 1 Mtr
120 120 Laying of LT AB/XLPE Cable 25/35/50 mmsq BI01010001010000000000000515BI0100001232 1 Mtr
121 121 Dismantling of LT AB/XLPE Cable 25/35/50 mmsq BI01010001010000000000000515BI0100001233 1 Mtr
122 122 Laying of LT AB/XLPE Cable 70/95/120 mmsq BI01010001010000000000000515BI0100001234 1 Mtr
123 123 Dismantling of LT AB/XLPE Cable 70/95/120 mmsq BI01010001010000000000000515BI0100001235 1 Mtr
124 124 Laying of LT AB/XLPE Cable 150/185mmsq BI01010001010000000000000515BI0100001236 1 Mtr
125 125 Dismantling of LT AB/XLPE Cable 150/185mmsq BI01010001010000000000000515BI0100001237 1 Mtr
126 126 Laying of LT AB/XLPE Cable 240/300 mmsq BI01010001010000000000000515BI0100001238 1 Mtr
127 127 Dismantling of HT AB/XLPE Cable 240/300 mmsq BI01010001010000000000000515BI0100001239 1 Mtr
128 128 Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT/LT Lines BI01010001010000000000000515BI0100001240 1 No
129 129 Fixing of Mid Span Straight Jointer Kit for AB/XLPE cables of HT/LT Lines BI01010001010000000000000515BI0100001241 1 No
130 130 Earthing of Cable BI01010001010000000000000515BI0100001242 1 No
131 131 Testing and commissioning of AB/XLPE cables of HT/LT Lines BI01010001010000000000000515BI0100001243 1 Mtr
132 132 Testing and commissioning of HT/LT Lines BI01010001010000000000000515BI0100001244 1 Mtr
133 133 Inspection of AB/XLPE cables of HT/LT Lines BI01010001010000000000000515BI0100001245 1 Mtr
134 134 Inspection of HT/LT Lines BI01010001010000000000000515BI0100001246 1 Mtr
135 135 Fixing of IPC 120/50mm BI01010001010000000000000515BI0100001247 1 No
136 136 Fixing of Single Phase Meters BI01010001010000000000000515BI0100001248 1 No
137 137 Fixing of Three Phase Meters BI01010001010000000000000515BI0100001249 1 No
138 138 Dismantling of Single Phase Meters BI01010001010000000000000515BI0100001250 1 No
139 139 Dismantling of Three Phase Meters BI01010001010000000000000515BI0100001251 1 No
140 140 Laying of Service Wire Twin Core 4/6 mmsq BI01010001010000000000000515BI0100001252 1 Mtr
141 141 Laying of Service Wire Twin Core 10/16 mmsq BI01010001010000000000000515BI0100001253 1 Mtr
142 142 Dismantling of Service Wire Twin Core 4/6 mmsq BI01010001010000000000000515BI0100001254 1 Mtr
143 143 Dismantling of Service Wire Twin Core 10/16 mmsq BI01010001010000000000000515BI0100001255 1 Mtr
144 144 Installation of 3 Phase 4 Wire Progidy Energy Meter BI01010001010000000000000515BI0100001256 1 No
145 145 Dismantling of 3 Phase 4 Wire Progidy Energy Meter BI01010001010000000000000515BI0100001257 1 No
146 146 Erection of DB/METER Box on PCC/ST Poles BI01010001010000000000000515BI0100001258 1 No
147 147 Fixing of Guard netting of HT/LT Line BI01010001010000000000000515BI0100001259 1 Span
148 148 Dismantling of Guard netting of HT/LT Line BI01010001010000000000000515BI0100001260 1 Span
149 149 Supply and installation of Chain link Fencing of 11/0.415 kV Yard of Substation by way of Mass Concrete in Foundations and chain link fencing of 6 ft height with access door facility including Painting with aluminum paint of approved brand and Manufacture to give an even shade. BI01010001010000000000000515BI0100001261 1 RM
150 150 Write Back of Damaged Material and Hardware fitting to Divisional Store BI01010001010000000000000515BI0100001262 1 Job
151 151 Write back of Dismantled Material to Divisional Store Miran Sahib Jammu BI01010001010000000000000515BI0100001263 1 Qtl
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail