| 1 | 1 | Providing and placing Cement concrete 1:1 1/2:3 in position & Plastering / patch plastering with C.M (1:3) with adding of \"FOSROC\" plasticizer admixture & water proofing compound material and dosage as per manufacturer specification for top slab edges & bottom and Door , window top & bottom, sides and sunshade where ever necessary including steel reinforcement for outside of LH tower and re-pointing on existing stone work with C.M (1:3) where ever damaged, Repair works to cracks in plastering / masonary / R.C.C. works/ lintels/ beams/ chajjas etc. cutting out cracks in 'V' section , cleaning out wetting, grouting with cement-sand slurry, 1:3( 1 Cement, 3 Sand) at all heights of the outside Lighthouse Tower ( 30.0 m height ) including dismanteling , removal of loose materials, racking, cleaning, wetting, mixing, laying, lift & lead, hoisting, curing etc., at above plinth level and including the plinth edges & sides all as per standard specifications and as directed including cost of all labour, materials, scaffolding, centering & shuttering, water, materials & labour transportation on river, mixing, tools & plants, compaction with vibrator,curing, safety belts, clearing honey bee nests and all other charges etc., complete. (The following items considered approximately are a) C.C (1: 1 1/2 : 3 ) = 1.70 Cum ( at top of LH tower slab 1.10 cum, Lintels 0.5 cum in between 5.0 mtr to 27.0 mtr height , sunshade 0.1 cum at entrance door top level ., b) steel Centering & Shuttering = 5.60 sqm, c) Steel reinforcement = 50.00 Kgs for concrete work, d) Re-pointing on stone work with C.M (1:3) where ever damaged - 20.00 sqm along the outer wall surfaces of 30.0 mtr height LH tower, e) Patch plastering/Plastering in C.M (1:3) = 50.20 sqm along the outer wall surfaces of 30.0 mtr height LH tower for masonry and concrete surfaces and plinth, f) Crack repair - 10.00 Rmt.) | 1 | 1 | Job |
|---|
| 2 | 2 | Applying two or more coats of Synthetic Enamel paint of approved brand (Asian paints Appcolite gloss Premium enamel / Berger Luxol Hi-gloss enamel) , 1st quality, colour, shade on previously painted surfaces of Lighthouse tower at all heights to give an even shade over a coat of primer includinig cleaning the surface from all dirt, dust and other foreign matter, scrapping the surface, remove loose matter and sand papering at all heights ,all as directed at site and as per standard specifications including cost of all labour, materials, loading & unloading, water charges, material & labour transportation on river,tools & plants, scaffolding, bosum chair, and safety measures, clearing honey bee nests and all other charges etc., complete. | 2 | | |
|---|