Housing Urban and Rular Development Government Departments Closing in 0 days TDR #27496056

Temporary Electrification Work And Hiring Dg Sets Construction Of Temporary Electrification Of Accommodation Centre For Capf And State Police Force Wrt Ensuing West Bengal Assembly Election 2021 - For 12 ( Twelve ) Nos Schools Under Harirampur P . S .

Issued by Government Departments · Harirampur, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Apr 2021
0 days left
EMD
23900
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Harirampur → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Temporary Electrification Work And Hiring Dg Sets Construction Of Temporary Electrification Of Accommodation Centre For Capf And State Police Force Wrt Ensuing West Bengal Assembly Election 2021 - For 12 ( Twelve ) Nos Schools Under Harirampur P . S . In The District Of Dakshin Dinajpur .

BOQ

Name of Work: Construction of Temporary Electrification of Accommodation Centre for CAPF & State Police Force wrt ensuing West Bengal Assembly Election 2021 - for 12 (Twelve) Nos Schools under Harirampur P.S. in the District of Dakshin Dinajpur as per Annexure-A.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11S & Installation on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. providing inter conection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approve materials).\nIncoming:\n(a) 415 / 220 Volt,63 Amp. TPNIC / DP Main Switch with HRC Fuse - 1(One) No.\n(b) 415 / 220 Volt, 63 Amp. FP / DP Change Over Switch - 1(One) No.\n(c) 415 Volt, 100 Amp. capacity Bus Bar chamber with 4 Nos. Cu / Al Bar - 1 No.\nOut going:\n(a) 415 / 220 Volt, 32 Amp. TPNIC / DP Main Switch with HRC Fuse - 3 (Three) No.\n(b) RYB indicating lamp - 3 Nos.\n(c) E. I. Danger Board - 1 No.\n(d) Volt meter (0 - 600 volt.) with Selector Switch - 1 No.BI01010001010000000000000515BI0100001113
21.01(i) Up to 3 days.BI01010001010000000000000515BI010000111412Nos
31.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 12 Nos x 13 No of Days = 156 Nos)BI01010001010000000000000515BI0100001115156Nos
42S & providing on hire basis 500V/220V, 32A / way, 6 way PDB with isolator on wooden plank board or suitable angle iron frame incl. providing inter coonection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approve materials).BI01010001010000000000000515BI0100001116
52.01(i) Up to 3 days.BI01010001010000000000000515BI010000111736Nos
62.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 36 Nos x 13 No of Days = 468 Nos)BI01010001010000000000000515BI0100001118468Nos
73S & providing on hire basis Main Switch with 1.1 KV grade PVC / A Al cable of folllowing sizes incl. laying in trench / wall with shadding arrangement dismantling the same & mending good the damage at the end of the program (With PWD approve materials).BI01010001010000000000000515BI0100001119
83.01(a) 4 core 16 sq. mm. PVC / A cable.BI01010001010000000000000515BI0100001120
93.02(i) Up to 3 days.\nBI01010001010000000000000515BI0100001121240Mtrs
103.03(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 240 Mtrs x 13 No of Days = 3120 Mtrs)BI01010001010000000000000515BI01000011223120Mtrs
113.04(b) 2 core 4 to10 sq. mm. PVC / A cable.BI01010001010000000000000515BI0100001123
123.05(i) Up to 3 days -BI01010001010000000000000515BI01000011241440Mtrs
133.06(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1440 Mtrs x 13 No of Days = 18720 Nos)BI01010001010000000000000515BI010000112518720Mtrs
144S & drawing on hire basis 2x1.5 sq. mm. / 4 sq. mm PVC Cu. wire incl. dismantling the same at the end of function.BI01010001010000000000000515BI0100001126
154.01(i) Upto 3 Days.BI01010001010000000000000515BI01000011272400Mtrs
164.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 2400 Mtrs x 13 No of Days = 31200 Mtrs)BI01010001010000000000000515BI010000112831200Mtrs
175S & providing on hire basis 4 Ft. 40 watt Single Tube Light (commercial type) fitings with necessary Tube lamp & replacement of fuse lamp.BI01010001010000000000000515BI0100001129
185.01(i) Upto 3 Days.BI01010001010000000000000515BI0100001130480Nos
195.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 480 Nos x 13 No of Days = 6240 Nos)BI01010001010000000000000515BI01000011316240Nos
206S & providing on hire basis LED Bulb with necessary accessories.BI01010001010000000000000515BI0100001132
216.01(i) Upto 3 Days.BI01010001010000000000000515BI0100001133480Nos
226.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 480 Nos x 13 No of Days = 6240 Nos)BI01010001010000000000000515BI01000011346240Nos
237Supplying & Providing on hire basis 200 V AC 1400 mm sweep ceiling fan with down rod as reqd. incl. dismantling the same.BI01010001010000000000000515BI0100001135
247.01(i) Upto 3 Days.BI01010001010000000000000515BI0100001136600Nos
257.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 600 Nos x 13 No of Days = 7800 Nos)BI01010001010000000000000515BI01000011377800Nos
268Distribution wiring with 2 x 1.5 sq.mm. PVC Cu. Wire to light / fan points in alkathine pipe on hire basis & dismantling the same at the end of the program. (Without individual control switch).BI01010001010000000000000515BI0100001138
278.01(i) Upto 3 Days.BI01010001010000000000000515BI01000011391560Pts
288.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1560 Pts x 13 No of Days = 20280 Pts)BI01010001010000000000000515BI010000114020280Pts
299Supplying & Providing on 600 mm sweep Air Circulator.BI01010001010000000000000515BI0100001141
309.01(i) Upto 3 Days.BI01010001010000000000000515BI010000114224Nos
319.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 24 Nos x 13 No of Days = 312 Nos)BI01010001010000000000000515BI0100001143312Nos
3210Supplying & Providing on hire basis ( 3 Nos.) 5 amp plug point on casing board with earthing attachment. (For Mobile Charger and Stand Fan).BI01010001010000000000000515BI0100001144
3310.1(i) Upto 3 Days.BI01010001010000000000000515BI0100001145216Sets
3410.2(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 216 Pcs x 13 No of Days = 2808 Pcs.)BI01010001010000000000000515BI01000011462808Sets
3511S & providing on hire basis 250 watt Metal Hallide fitings with necessary clamping arrangemnt to be fixed on existing wooden / bamboo or on wall incl. gear box & replacement of fuse lamp.BI01010001010000000000000515BI0100001147
3611.01(i) Upto 3 Days.BI01010001010000000000000515BI0100001148120Nos
3711.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 120 Nos x 13 No of Days = 1560 Nos)BI01010001010000000000000515BI01000011491560Nos
3812Earthing the installation with 50 mm. dia G. I. pipe 2.5 Mtr. to 3 Mtr. long & 6 / 8 SWG G. I. wire with bolts, nuts etc.below the GL on hire basis & dismantling the same at the end of the program.BI01010001010000000000000515BI0100001150
3912.01(i) Upto 3 Days.BI01010001010000000000000515BI010000115136Nos
4012.02(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 36 Nos x 13 No of Days = 468 Nos)BI01010001010000000000000515BI0100001152468Nos
4113Hiring & Installation charges for the following capacity DG Sets. incl. All accessories.BI01010001010000000000000515BI0100001153
4213.01(i) 5 KVA DG (Single phase) for 12 Nos School for 16 days. (No of Days 16 x no. of DG 2 x No. of school = 12) = 384 Nos.BI01010001010000000000000515BI0100001154384Nos
4314To and fro Transportation charges incl. loading & unloading.BI01010001010000000000000515BI0100001156
4414.01(i) 5 KVA DG sets and electrical equipments for 12 Nos of School.BI01010001010000000000000515BI010000115724Items
4515Charge of Electrical Supervisor 01 No. for each shift x 3 shift per day for 16 days for each of 12 Nos School. (Qty. = No of shift 3 x No of days 16 x no of School 12 = 576 Shifts)BI01010001010000000000000515BI0100001159576Shifts
4616Fuel consumption for DG Set with during consumption.BI01010001010000000000000515BI0100001160
4716.01(i) For 5 KVA DG Set. @ 2 Ltr./DG/Hr. (Qty. = No. of DG 24 x no of days 16 x no of working hours 4 = 1536 Hrs.).BI01010001010000000000000515BI01000011611536Hrs
4817N.B.:\n1) Rate should be inclusive of all taxes, duties & CESS etc including GST which will not be paid extra (on Item No. 01.00 to 15.00).\n2) Bidders are requested to quote Rate for the Items Sl. Nos. 01.01, 02.01, 03.02, 3.05, 04.01, 05.01, 06.01, 07.01, 08.01, 09.01, 10.01, 11.01, 12.01, 13.01, 14.01, 15.00 & 16.01 as spelt out in the BOQ . The rate for the items Sl. Nos. 01.02, 02.02, 03.03, 3.06, 04.02, 05.02, 06.02, 07.02, 08.02, 09.02, 10.02, 11.02 & 12.02 will be calculated automatically.\n3)The bidder will have to quote the fuel rate based on the market rate on the date of bidding.\n4) The cost of fuel may be charged depending on the actual cost of fuel during the time of execution of work. Log book to be maintained strictly on daily basis.\nBI01010001010000000000000515BI0100001163

AI Tender Summary

OUR REF NO 27496056
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 08-04-2021
Authority
Authority Name Public Works Department
Work Description Temporary Electrification Work And Hiring Dg Sets Construction Of Temporary Electrification Of Accommodation Centre For Capf And State Police Force Wrt Ensuing West Bengal Assembly Election 2021 - For 12 ( Twelve ) Nos Schools Under Harirampur P . S . In The District Of Dakshin Dinajpur .
Basic Detail
Tender No WBPWD/EE/DDED/e-NIQ-25/2020-21
Bidding Type Tender
Location
City Harirampur
State West Bengal
Key Dates
Publish Date 26 Mar 2021
Submission Date 08 Apr 2021
Open Date 10 Apr 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 23900
Exemption Not Available
Document List
EF4D8574-9114-426C-A441-D64A8CD4AA93.html
BOQ_628675.xls
Annexure-A.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 26, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 08, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 10, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

EF4D8574-9114-426C-A441-D64A8CD4AA93.html

xls

BOQ_628675.xls

pdf

Annexure-A.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders