}

Tender For Electric Motor, Starter Material And Maintenance For Junnar Municipal Council, Junnar- Repairing Work For 100 H.P.V.T. & 75 H.P.V.T. Pump. 2 Dismantling & Erection Of 100 H.P.V.T. Pump Set With Bowl Assembly , Discharge Head Column Pipe,, JUNNAR-Maharashtra

Directorate Of Municipal Administration-DMA has published Tender For Electric Motor, Starter Material And Maintenance For Junnar Municipal Council, Junnar- Repairing Work For 100 H.P.V.T. & 75 H.P.V.T. Pump. 2 Dismantling & Erection Of 100 H.P.V.T. Pump Set With Bowl Assembly , Discharge Head Column Pipe,. Submission Date for this Tender is 31-03-2021. Starter Tenders in JUNNAR Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

27487565
Tender For Electric Motor, Starter Material And Maintenance For Junnar Municipal Council, Junnar- Repairing Work For 100 H.P.V.T. & 75 H.P.V.T. Pump. 2 Dismantling & Erection Of 100 H.P.V.T. Pump Set With Bowl Assembly , Discharge Head Column Pipe,
Open Tender
Indian
Maharashtra
JUNNAR
31-03-2021

Tender Details

Tender For Electric Motor, Starter Material And Maintenance For Junnar Municipal Council, Junnar- Repairing Work For 100 H.P.V.T. & 75 H.P.V.T. Pump. 2 Dismantling & Erection Of 100 H.P.V.T. Pump Set With Bowl Assembly , Discharge Head Column Pipe, Shaft, Bearing Bushing With Vhs Moor S.V. & Reflex Values & Allied Equipments & Transporation From Site To Workshop & Return Etc. Complete ( Old Scrap Material Should Be Taken By Contractor And Cost Of Scrap Shold Deduct And Final Offer Should Quote ) 3 Dismantling & Erection Of 75 H.P.V.T. Pump Set With Bowl Assembly , Discharge Head Column Pipe, Shaft, Bearing Bushing With Vhs Moor S.V. & Reflex Values & Allied Equipments & Transporation From Site To Workshop & Return Etc. Complete ( Old Scrap Material Should Be Taken By Contractor And Cost Of Scrap Shold Deduct And Final Offer Should Quote ) 4 Repairing Of V.T. Pump With Required Following Spares With Skilled Labour Charges Etc. 5 A ) Stuffing Box Bronze Bushing 6 B ) Gland Sleeve S / S Material 7 C ) Top Bowl Repair With Providing & Welding Of M.S. Flange Heavy Duty With Required Sundry .Etc. 8 D ) Column Pipe Repair With Welding If Ribs M.S. Flange With Machining Etc. 9 E ) Rubber Bush 10 F ) Shaft S / S Material ( 4 Mtr ) 11 G ) Column Shaft S / S Material ( 1.5 Mtr ) 12 H ) Shaft Sleeve S / S Material 13 Providing & Fixing Special Strengthening Heavy Duty Nut Bolts 14 A ) Rubber Packing ( Chanmpion ) 15 B ) Neck Ring Brass 16 C ) Bowl Bush Rubber 17 D ) Bowl Bush Brass 18 E ) Bowl Turning & Surface Counter Top & Bottom 19 F ) Impeller 20 G ) Impeller Qualate 21 H ) Impeller Qualate Check Nut 22 I ) Impeller Turning 23 J ) Spider Bushing 24 Bowl Assembly Fitting 25 Tafflon Gland 26 Repairing Work For 100 Hp & 75 Hp Motor Rewinding 27 Complete Rewinding Of 100 Hp Vt Motor Capacity With Qualityf Class Copper Wire Insulation Incluiding Air Drying, Varnishing Incluiding Costskilled Labour, Dismantlingmotor, Transportation Loading, Unloading Erection And Giving Trial And Testing And All Applicable Taxes ( Old Scrap Material Should Be Taken By Contractor And Cost Of Scrap Shold Deduct And Final Offer Should Quote ) 28 Complete Rewinding Of 75Hp Vt Motor Capacity With Qualityf Class Copper Wire Insulation Incluiding Air Drying, Varnishing Incluiding Costskilled Labour, Dismantlingmotor, Transportation Loading, Unloading Erection And Giving Trial And Testing And All Applicable Taxes ( Old Scrap Material Should Be Taken By Contractor And Cost Of Scrap Shold Deduct And Final Offer Should Quote ) 29 Repairing Of V.T. Motorwith Required Following Spares With Skilled Labour Charges Etc. 30 B ) Motor Coling Fan 31 C ) Rotter Balencing 32 D ) Best Quality Greaseap3 33 E ) 40 No. Bearingoil 34 F ) Motor Top Bearing 35 G ) Motor Bottom Bearing 36 H ) Motor Top & Bottom Busing , Turning Oil Seal 37 I ) Oil Seal 38 J ) Motor Lock Ratchet Check Nut Lock Key 39 K ) Brass Pipes & Nipples. 40 L ) Bearing Check -Nut 41 M ) Ratchet Bush Key With Lock Nut 42 P ) Motor Cannection Plate 43 Q ) Motor Cannection Lugs. 44 R ) Cable 1 } 1.1 Kv Pvc Armoured 4 Core Alluminium50 Sq. Mm 45 2 } Pvc 1.1 Kv Armoured 4 Core Alluminium70 Sq. Mm 46 3 } Pvc 1.1 Kv Armoured4 Core Alluminium95 Sq. Mm 47 75Hp, 100 Hp A.T.S. Starter & Distribution Pannelat Junnar 48 Incomer Bus Bar-25 / 10 Mm Alluminium 49 300 A Tp Contactor ( No3 Tf54 ) 50 160 A Tp Contactor ( No3 Tf50 ) 51 O / L Relay-85 A-135 A 52 Ammeter-96 Mm Sq.-0-200A 53 Ct Coil-100 / 5A 54 200 / 5A-5Va Ct+Ct Shortng Links 55 Motor Protection-Mpr-D2 ( Phase Failure+Dryrun+Overload Protection No-3Th30 22-Oa ) 56 On Delay -Timer+Master Timer 57 Control Mcb 5A 250V 58 Lum Push Button-On / Off 59 3 Phase Trip Indication Lamp+Tripping 60 Star-Delta Relay ( No-3Rp1576-1 Np30 ) 61 Relay Main Conctor ( No-3Ua 6230-5 A85 62 Door Switch With No + Nc 63 100 Hp Auto Starter- Transformer Rewinding 64 Current Convertor 2-5 Range ( No S2cts1 / S ) 65 400Afp Mccb + Handle-35Ka 66 Voltmeter+ Ass 0-400A 67 Ammeter+ Ass 0-400A 68 400 / 5A-15Va Ct + Ct Shorting Links 69 R, Y, B, Indicating Lmp Led 70 200A Tp Mccb-For Motor-25Kv 71 100 A Tp Mccb For Capacitor 72 63A Tpn Mcb For Lighting-10Ka 73 32 A Tp Mcb For Aux Supply 74 Capacitor-35Kvar1 Set-Mpp 75 Capacitor- 25Kvar 1 Set-Mpp 76 Control 1Sqmm Copper Wiring -Reparing 77 Compartmental Allumminium Busbar 40*10*2 Run Per Phase For Main 78 Transformer Oil 79 200 Kva Transformer-Lighting Arrestor 80 200Kva Transformer-Gasket Set 81 200 Kva Transformer 82 Contactor Patti Paty ( 300 Amp & 160 Amp ) 83 200 Kva Transformer-Prociline Insulator 84 Incomer Bus Bar-25 / 10 Mm Alluminium 85 5Hp Submersible Pump 86 ?Hdpe Pipe 87 5 Hp Dol Starter 88 5Hp Monoblock Motor Winding - ( Old Scrap Material Should Be Taken By Contractor And Cost Of Scrap Shold Deduct And Final Offer Should Quote ) 89 20 Hpmonoblock Motor Rewinding-Winding ( Old Scrap Material Should Be Taken By Contractor And Cost Of Scrap Shold Deduct And Final Offer Should Quote )

Key Value

Document Fees
INR 1000 /-
EMD
INR 5000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: ?????? ???????? ???? ?????? ?????????? ??? ??? ? ???? ????? ?????? ???????? ??????? ?? ???????? ?? 2021-22 ???? ??????? ? ???? ????.
Sl. No. Item Description
1Repairing work for 100 H.P.V.T. & 75 H.P.V.T. Pump.
2Dismantling & Erection of 100 H.P.V.T. Pump set with bowl assembly ,discharge head column pipe,shaft,bearing bushing with VHS moor S.V. & reflex values & allied equipments & transporation from site to workshop & return etc. complete (old Scrap material should be taken by contractor and cost of scrap shold deduct and final offer should quote)
3Dismantling & Erection of 75 H.P.V.T. Pump set with bowl assembly ,discharge head column pipe,shaft,bearing bushing with VHS moor S.V. & reflex values & allied equipments & transporation from site to workshop & return etc. complete (old Scrap material should be taken by contractor and cost of scrap shold deduct and final offer should quote)
4Repairing of V.T. pump with required following spares with skilled labour charges etc.
5a) Stuffing box bronze bushing
6b) Gland sleeve S/S Material
7c) Top bowl repair with providing & welding of M.S. flange heavy duty with required sundry .etc.
8d) Column pipe repair with welding if ribs M.S. flange with machining etc.
9e) Rubber Bush
10f) Shaft S/S Material (4 mtr)
11g) Column Shaft S/S Material (1.5 mtr)
12h) Shaft sleeve S/S Material
13Providing & fixing special strengthening heavy duty nut bolts
14a) Rubber packing (chanmpion)
15b) Neck ring brass
16c) Bowl bush rubber
17d) Bowl bush brass
18e)Bowl turning & surface counter top & bottom
19f) Impeller
20g) Impeller qualate
21h) Impeller qualate check nut
22i) Impeller turning
23j) spider bushing
24Bowl assembly fitting
25Tafflon Gland
26Repairing work for 100 HP & 75 HP Motor Rewinding
27Complete rewinding of 100 HP VT motor capacity with qualityF class copper wire insulation incluiding Air drying,varnishing incluiding costskilled labour,Dismantlingmotor,transportation loading,unloading erection and giving trial and testing and all applicable taxes(old Scrap material should be taken by contractor and cost of scrap shold deduct and final offer should quote)
28Complete rewinding of 75HP VT motor capacity with qualityF class copper wire insulation incluiding Air drying,varnishing incluiding costskilled labour,Dismantlingmotor,transportation loading,unloading erection and giving trial and testing and all applicable taxes(old Scrap material should be taken by contractor and cost of scrap shold deduct and final offer should quote)
29Repairing of V.T. motorwith required following spares with skilled labour charges etc.
30b) Motor coling fan
31c) Rotter Balencing
32d) Best quality greaseAp3
33e) 40 No. bearingoil
34f) Motor top Bearing
35g) Motor bottom bearing
36h) Motor top & bottom busing , turning oil seal
37i) Oil seal
38j) Motor lock ratchet check nut lock key
39k) Brass pipes & nipples.
40L) Bearing check -nut
41m) Ratchet bush key with lock nut
42p) Motor cannection plate
43q) Motor cannection Lugs.
44r) Cable 1} 1.1 kv pvc armoured 4 core alluminium50 sq. mm
452} pvc 1.1 kv armoured 4 core alluminium70 sq. mm
463} pvc 1.1 kv armoured4 core alluminium95 sq. mm
4775HP,100 HP A.T.S. Starter & Distribution Pannelat Junnar
48Incomer Bus Bar-25/10 MM Alluminium
49300 A TP contactor (No3 TF54)
50160 A TP contactor(No3 TF50)
51O/L Relay-85 A-135 A
52Ammeter-96 MM SQ.-0-200A
53CT Coil-100/5A
54200/ 5A-5VA CT+CT Shortng Links
55Motor protection-MPR-D2 (phase failure+Dryrun+Overload protection No-3TH30 22-OA)
56On Delay -Timer+Master Timer
57Control MCB 5A 250v
58LUM Push Button-ON/OFF
593 phase Trip Indication Lamp+tripping
60Star-Delta Relay(No-3RP1576-1 NP30)
61Relay Main Conctor(No-3UA 6230-5 A85
62Door Switch With NO + NC
63100 HP Auto Starter- Transformer rewinding
64current convertor 2-5 range (No s2CTs1/S)
65400AFP MCCB + HANDLE-35KA
66Voltmeter+ ASS 0-400A
67Ammeter+ ASS 0-400A
68400/5A-15VA CT + CT Shorting Links
69R,Y,B,Indicating Lmp LED
70200A TP MCCB-For MOTOR-25KV
71100 A TP MCCB FOR Capacitor
7263A TPN MCB FOR Lighting-10KA
7332 A TP MCB For Aux Supply
74Capacitor-35KVAR1 SET-MPP
75Capacitor- 25KVAR 1 SET-MPP
76control 1sqmm copper wiring -reparing
77Compartmental Allumminium Busbar 40*10*2 Run Per Phase For Main
78Transformer Oil
79200 kva Transformer-Lighting Arrestor
80200KVA Transformer-Gasket Set
81200 KVA Transformer
82Contactor patti paty (300 amp & 160 Amp )
83200 Kva transformer-prociline insulator
84Incomer Bus Bar-25/10 MM Alluminium
855HP Submersible pump
86?"HDPE Pipe
875 HP DOL starter
885HP Monoblock motor winding -(old Scrap material should be taken by contractor and cost of scrap shold deduct and final offer should quote)
8920 HPMonoblock motor Rewinding-winding(old Scrap material should be taken by contractor and cost of scrap shold deduct and final offer should quote)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail