| 1 | Excavation For foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preapring the bed for foundation and excluding back filling etc. comp lift up to 0 to 1.5 m |
| 2 | Soft soil - 600 X 0.60 X0.20 =72.00 cum |
| 3 | Hard Murum - 600 X 0.60 X0.25 =90.00 cum |
| 4 | Soft rock - 600 X 0.60 X0.30 =108.00 cum |
| 5 | Providing and supplying in standered length ISI mark Rigid Unplasticised PVC pipes suitable for portable water with solvent cement joints including all local central taxes, transportation fright charges, inspection charges, loading, unloading conveyance to the department stores / site and stacking the same in closed shed duly protected from sun rays and rains including cost of jointing material etc. comp (Selffit type to be jointed with cement solvent) |
| 6 | 75 mm dia/4 kg |
| 7 | Lowering laying and jointing with PVC Pipe and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material except cement solvent, rubber ring giving saatisfactory hydraulic testing as per IS code etc. complete (with cement solvent joint |
| 8 | 75 mm dia/4 kg |
| 9 | Providing double flange sluice valve / non return valve confirming for IS-2906/14846 including worn gear arragements as per pressure stainless steel spindle, caps including all taxex transportain etc. comp |
| 10 | 80MM Dia Sluice valve |
| 11 | 65 mm dia sluice valve |
| 12 | Lowering laying and jointing in position following C.I. D/F reflux valves, Butterfly valves and sluice valves including cost of all labour jointing material including nut bolts and giving satisfactory hydrulic testing etc. complete (Rate for all Class Of Valves |
| 13 | 80 mm dia sluice valve |
| 14 | 65 mm dia sluice valve |
| 15 | providing and construction of B.B. Masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding excluding excavation B.B. Masonry in cm 1:5 proportion precast RCC frame and cove etc. complete as directed by engineer in charge |
| 16 | 100MM x 225 MM |
| 17 | Providing and Laying in situ 1:2:4 (M-150) grade of C.C. of trap/granite /quartzite /gneiss metaal for foundation and bedding including dewatering form work. Compacting and curing finishing etc. complete with initial lift of 1.5 m |
| 18 | CC Road 600 X 0.60 X0.20 =72.00 cum |
| 19 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation surcharging etc complete |
| 20 | net qty = 270.00-72.00 =198.00 cum |
| 21 | Cost of 15 mm service connection for distribution network of any pipe (As per G.R. dt. 30 th june 2020) (A) without road crossing |
| 22 | (A) Without Road Crossing MDPE/UPVC |
| 23 | (A) With Road Crossing MDPE/UPVC |
| 24 | Add 12 % GST |