Incinerator Package For Iocl Paradip Sru Project Procurement Of Incinerator Package Including Supply, Spares, 3D Modelling In Pdms, Supply And Application Of Refractory At Site And Site Supervision For Standby Sulphur Recovery Unit ( Sru ) Train Of 525 Tpd For Iocl Paradip Refinery, Odisha , Supply Of Incinerator Pkg For Iocl Supply Of Complete Incinerator Package Covering Project Management, Complete Design & Engg. ( I.E. Process, Thermal, Hydraulic, Mechanical, Refractory & Insulation Etc. ) , Raw Material & Bought Out Procurement, Manufacture / Fabrication, Assembly, Testing, Inspection, Painting Etc. Of Incinerator Burner, Incinerator Chamber, Waste Heat Exchanger Along With Steam Drum, Mud Drum, Hp Steam De-Super Heater, Incinerator Stack, Incinerator Combustion Air Fans, Bellows, Tsp Dosing System Etc. The Incinerator Package Shall Also Include Supply Of Ducting & Supports, Piping, Valves & Fittings, Instrumentation &Controls, Electrical ( As Per Marked Up P&Id Attached ) , Refractory, Equipment / System Specific Structure, Platform & Ladders Etc. As Per Mr. Spares For Assembly, Erection, Pre-Commissioning & Commissioning As Per Mr. Participation In Hazop & Sil Study & Implementation Of Report. Packing & Forwarding, Transportation ( As Per Commercial Section Of Mr ) , From Vendors Works / Shop To Actual Site For The Complete Incinerator Package Including All Bought Outs As Per Data Sheets, P & Ids, Standards, Specifications, Instructions To Bidder Etc. Drawings And Documents As Per Attached Vendor Data Requirement For All Supplies And Services As Per Mr. Routing & Stress Analysis ( As Applicable ) Of Piping From Equipment Flange Up To Package Terminal Point. Conductance Of Performance Guarantee Test Of Incinerator Package; Mechanical Design & Workmanship Guarantee As A Single Point Responsibility Vendor. Site Training To The Owners Operation &Maintenance Personnel. For Site Training Of Owners Operation & Maintenance Personnel ( Total 07 Man-Days Shall Be Considered For Evaluation. ) All The Items Of This Package Strictly As Per Mr. As Per Mr No.: B366-090-Fi-Mr-7440 Project: Sulphur Recovery Unit For Iocl Paradip , Supply Package Part To Be Quoted In Inr , Supply Package Part To Be Quoted In Usd Subject To Fulfilling Clauses Given In Cl. 3 And 23 Of Special Terms And Conditions. , Mandatory Spares Forincinerator Pkg ---------------------------------------------------------------------------- Mandatory Spares As Per Mr As Per Mr No.: B366-090-Fi-Mr-7440 Project: Sulphur Recovery Unit For Iocl Paradip , 3D Modelling For Incinerator Pkg ---------------------------------------------------------------------------- Creation Of 3D Model Of The Entire Incinerator Package In Pdms. Project: Sulphur Recovery Unit For Iocl Paradip , Application Of Refractory Of Incinerator Package ---------------------------------------------------------------------------- Application And Dry Out Of Refractory At Site As Per Enclosed Requisition Requirements. As Per Mr No.: B366-090-Fi-Mr-7440 Project: Sulphur Recovery Unit For Iocl Paradip , Supervision Of Erection Of Incinerator Package ---------------------------------------------------------------------------- Supervision Of Site Assembly & Erection, Pre Commissioning & Commissioning Of Complete Incinerator Package As Per Requisition Requirements. For Supervision Of Site Activities Total 90 Man-Days Shall Be Considered For Evaluation. Per Diem Charges Shall Include Travel, Lodging And Boarding Charges. As Per Mr No.: B366-090-Fi-Mr-7440 Project: Sulphur Recovery Unit For Iocl Paradip