| 1 | 1 | Supply, Testing, Commissioning and handover at site of following Machine Tools for Setting up of a load Test Bay and Stealth Material Workshop at ND (V):- | | | |
|---|
| 2 | 1.01 | Design, Manufacture, supply, erection and commissioning of Civil works for new M36 Test bed building and Fire Protection System equipment/ and all other work as specified in Chapter No 4 of Part II of RFP, complete in all respect with OEM and TPA provision. | a | 1 | Job |
|---|
| 3 | 1.02 | Design, Manufacture, supply, erection and commissioning of all mechanical equipment/ items/ auxiliaries/ systems including control systems for new M-36 GT Test bed for M36 GTs along with laying of all pipelines and all associated auxiliaries as specified in Chapter No 5 of Part II of RFP, complete in all respect with OEM and TPA provision. | b | 1 | Job |
|---|
| 4 | 1.03 | Design ,Manufacture, supply, erection and commissioning of Civil works for Augmentation of Existing M-15 GT Test Bed for M7N.1 GT as specified in Chapter No 4 of Part II of RFP, complete in all respect with OEM and TPA provision. | C | 1 | Job |
|---|
| 5 | 1.04 | Design, Manufacture, supply, erection and commissioning of all electro mechanical equipment/ items/ auxiliaries/ systems including control systems for Augmentation of Existing M-15 GT Test Bed for M7N.1 GT along with laying of all pipelines and all associated auxiliaries as specified in Chapter No 6 & 7 of Part II of RFP, complete in all respect with OEM and TPA provision. | d | 1 | Job |
|---|
| 6 | 1.05 | Design, Manufacture, supply, erection and commissioning of all other miscellaneous work as specified in Chapter No 7 & 8 of Part II of RFP, complete in all respect with OEM and TPA provision. | e | 1 | Job |
|---|
| 7 | 1.06 | Technical Literature / certifications / documentation for Design, Manufacture, supply, erection and commissioning of all electro mechanical equipment/ items/ auxiliaries/ systems including control systems for Augmentation of Existing M-15 GT Test Bed for M7N.1 GT as specified in Chapter No 3 & 7 of Part II of RFP, complete in all respect with OEM and TPA provision. . | f | 1 | Job |
|---|
| 8 | 1.07 | Technical Literature / certifications / documentation for Design, Manufacture, supply, erection and commissioning of all electro mechanical equipment/ items/ auxiliaries/ systems including control systems for Augmentation of new M36 GT test bed as specified in Chapter No 3 & 7 of Part II of RFP, complete in all respect with OEM and TPA provision. | g | 1 | Job |
|---|
| 9 | 1.08 | Acceptance, tests, trials and commissioning of equipment/ items/ auxiliaries/ systems for of Existing M-15 GT Test Bed for M7N.1 as specified in Chapter No 3 of Part II of RFP, complete in all respect with OEM and TPA provision. | h | 1 | Job |
|---|
| 10 | 1.09 | Acceptance, tests, trials and commissioning of equipment/ items/ auxiliaries/ systems for of New M-36 GT Test Bed as specified in Chapter No 3, Part II of RFP, complete in all respect with OEM and TPA provision. | j | 1 | Job |
|---|
| 11 | 1.1 | Any other item such as Standard Accessories, transportation, insurance, freight, packing etc Items 1.01 to 1.09 | k | 1 | Job |
|---|