Military Engineer Services-MES has published Repair/ Replacement Of Ceiling Fans Exhaust Fans And Summer Appliances With Connected Items At Vrc 10 Jak Li Dgis Cams 1 Cbpo Ihq Mod ( Army ) Camp And Khyber Line Under Age E/M ( S ) Ge ( South ) Delhi Cantt-10. Submission Date for this Tender is 13-04-2021. Air Conditioner Tenders in Garrison Engineer South Delhi Cantt 110010 Delhi. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-Mar-2021 | Corrigendum 01 | Other | 06-04-2021 |
2 | 06-Apr-2021 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 13-04-2021 |
Name of Work: REPAIR/ REPLACEMENT OF CEILING FANS, EXHAUST FANS AND SUMMER APPLIANCES WITH CONNECTED ITEMS AT VRC, 10 JAK LI, DGIS, CAMS, 1 CBPO, IHQ MoD (ARMY) CAMP AND KHYBER LINE UNDER AGE E/M (S) OF GE (SOUTH) DELHI CANTT-10. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Taking down of ceiling fan/ exhaust fan dismantling of blades, transportation to work shop and carrying out rewinding, transportation to site, reinstallation and testing complete all as specified and directed by Engineer-in-charge. \nNote:- Rewinding will be measured and paid separately. | 2350 | Each | |
2 | 2 | M&L for Rewinding of ceiling fan 1200/1400 mm sweep by dismantling of fan motor cutting and removing of burnt windings, cleaning, winding with supper enameled copper wire of superior quality, same gauge of wire, same Nos of turns, provn of insulation paper applying of varnish drying of varnish and assembling of fan including replacement gun metal bush, ball bearing where ever required complete all as specified and directed by Engr-in-Charge. | 2120 | Each | |
3 | 3 | All as per item No. 2 but here-in-before exhaust fan 450 mm sweep | 50 | Each | |
4 | 4 | All as per item No. 2 but here-in-before exhaust fan 230/300 mm sweep | 180 | Each | |
5 | 5 | Supply only upper and lower Gun metal bush for fans complete all as specified and directed by Engineer-in-charge. | 2120 | Set of 2 | |
6 | 6 | Supply only ceiling fan Ball bearing of suitable size & model complete all as specified and directed by Engineer-in-charge. Make:- NBC/ SKF | 2350 | Each | |
7 | 7 | S&F in replacement fan shaft with pin for ceiling fans of 1200/1400mm sweep complete all as specified and directed by Engineer-in-charge. | 1900 | Each | |
8 | 8 | S&F in replacement clamp with rubber real for hanging ceiling fans of 1200/1400mm sweep complete all as specified and directed by Engineer-in-charge. | 2120 | Each | |
9 | 9 | S&F in replacement of ceiling fan capacitor of 2.5 mfd with complete all as specified and directed by Engineer-in-charge. Make : TIBCON/AE/EPCOS/Havells | 2120 | Each | |
10 | 10 | S&F in replacement of fan regulator electronic, stepped type, Switch type, suitable for ceiling fan 1200/1400mm sweep complete all as specified and directed by Engineer-in-charge.\n | 750 | Each | |
11 | 11 | Dismantling, collecting and transporting of desert coolers from MES store yard/user bldgs to work shop and overhauling of fan motar, oiling to vertical pump including replacement of unserviceable bolts and nuts with washers, clamps etc.complete and returning back to MES store yard/user locations and reinstallation at pre position complete all as specified and directed by Engineer-in-charge.\nNote: Parts except nut/bolt/washers to be replaced and be measured & paid separately under respective items) | 120 | Each | |
12 | 12 | S&F in repair submersible water lifting pump,single phase suitable for desert coolers complete all as specified and directed by Engineer-in-charge. \nMake Turbo/vijay / Hindustan/Meghdoot /Sumerking. | 172 | Each | |
13 | 13 | S&F in repair fan motor 1/7 HP or any HP 230 volt,50Hz cycles complete all as specified and directed by Engineer-in-charge.\nMake:- Summer Cool/ Hindustan /Havells | 20 | Each | |
14 | 14 | S&F in repair capacitor, 4 mfd rating complete all as specified and directed by Engineer-in-charge.\nMake:- Asian/ Univarsal | 140 | Each | |
15 | 15 | S&F in repair fan blade of 300/450 mm seep suitable for desert coolers complete all as specified and directed by Engineer-in-charge. | 60 | Each | |
16 | 16 | S&F in replacement of plug top, 5 Amps, 230 Volts, 50 Hz, complete all as specified and directed by Engineer-in-charge. | 100 | Each | |
17 | 17 | S&F in repair Nylon pipe, heavy duty, best quality of 15mm bore complete all as specified and directed by Engineer-in-charge. | 120 | RM | |
18 | 18 | S&F in repair wood wool pad (set of 3) size 95x95 cm of good quality complete all as specified and directed by Engineer-in-charge. | 172 | Set of three | |
19 | 19 | S&F in replacement side Panels made out with 2mm thick MS sheet as per existing size and sample for desert cooler complete all as specified and directed by Engineer-in-charge. | 40 | Set of three | |
20 | 20 | S&F in repairs Relay assembly suitable for water cooler of capacity 150/80/60 Ltrs complete all as specified and directed by Engineer-in-Charge. \nMake Shri Ram/ Renutral/ Microtech. | 4 | Each | |
21 | 20.01 | S&F in repairs Over load protector for water cooler of capacity 150/80/60 Ltrs complete all as specified and directed by Engineer-in-Charge. Make Shri Ram/Renutral/Microtech. | 4 | Each | |
22 | 20.02 | S&F in repairs Starting capacitor for water cooler of capacity 150/80/60 Ltrs complete all as specified and directed by Engineer-in-Charge. Make- Usha/Taslla/Universal. | 3 | Each | |
23 | 20.03 | S&F in repairs Running capacitor for water cooler of capacity 150/80/60 Ltrs complete all as specified and directed by Engineer-in-Charge. Make- EPCOS/Asian. | 3 | Each | |
24 | 20.04 | S&F in repairs Thermostatic switch for water cooler of capacity 150/80/60 Ltrs complete all as specified and directed by Engineer-in-Charge. Make Indfoss or its equivalent as sample approved by Engr-in-charge. | 4 | Each | |
25 | 21 | S&F in repair chromium plated push cock, self closing, spring loaded type 15mm dia, with water waste tray for water coolers complete all as specified and directed by Engineer-in-charge.\nMake:- JAYCO/TYNCO | 12 | Each | |
26 | 22 | S&F commissioning and testing blower motor as per sample of water cooler of capacity 150/80/60 Ltr complete all as specified and directed by Engineer-in-charge. | 6 | Each | |
27 | 23 | M&L complete servicing of water cooler by cleanning of coils with caustic soda, removal of rust from sheet metal frame, cleaning of tank and checking of water connection and fixing in original position complete all as specified and directed by Engineer-in-charge. | 20 | Each | |
28 | 24 | M&L for detecting the gas leakage, rectifying the defects vacumizing and charging fresh Gas and commissioning and testing the Water cooler of 80/150 Liters Capacity complete all as specified and directed by Engineer-in-charge. | 24 | Kg | |
29 | 25 | All as per item No. 24 Above but here-in-before 425 Ltrs Deep Freezer | 8 | Kg | |
30 | 26 | Supply, fixing & testing fan blade of motor for Water Cooler of 60/120 Ltrs Capacity including removing old fan blade (As per sample of the existing water cooler blade) complete all as specified and directed by Engineer-in-charge. | 7 | Each Job | |
31 | 27 | Supply & lay flexible PVC insulated 3 core 4 Sqmm with copper conductor cable suitable for indoor unit to outdoor unit for deep freezer, water cooler, Desert cooloer complete all as specified and directed by Engineer-in-charge. | 180 | RM | |
32 | 28 | S&F PVC connecting pipe of dia 12 mm with brass nuts and washers at both ends of length not exc. 60 cms for connection of water coolers complete all as specified and directed by Engineer-in-charge. | 32 | Each Job | |
33 | 29 | Earthing complete with galvanised earth plate electrode 60 cmx 60 cmx 6.3 mm thick burried directly in ground (earth pit not less than 2.25 mtr deep below GL) with top edge of the plate not less than 1.5M below normal ground level connected to GI wire 4mm as earthing lead by means of nut,bolts and check nut and washer,GI light grade protection pipe 15 mm dia. upto 7.5 m,GI watering pipe 20 mm dia,RCC cover with funnel,excavation in any type of soil,PCC pit charcoal ,salt all as shown in electrical plate No 3 of SSR Part I, including earth test point up to pannel board, including testing on completion, complete all as specified and directed by Engr-in-Charge. | 40 | Each | |
34 | 30 | M&L Earth continuity conductor or main earthing lead fixed on wall/ceiling in batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed on poles or any other indicated situation for loop earthing etc as required 4mm dia galvanised iron or steel wire complete all as specified and directed by Engineer-in-charge. | 260 | RM | |
35 | 33 | Note:- The contract sum shall be after deducting the amount of Credit shown in Credit Schedule of this Tender. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail