Mechanical Maintenance Of Shaft Kiln Equipments As Per Nit
Tender Overview
Project Description
Mechanical Maintenance Of Shaft Kiln Equipments As Per Nit- 1 Preventive Maintenance Of Automatic Charging And Discharge Equipment ( Skip Bucket And Winch, Pant Legs, Deviating Flaps, Pneumatic Cylinders. Discharge Tables ) . 2 Preventive Maintenance Of Hydraulic Systems Including Power Pack, Pipe Lines And Cylinders. 3 Preventive Maintenance Of Burner ( Upper, Lower ) Units. 4 Preventive Maintenance Of Vibrating Screens. 5 Preventive Maintenance Of Conveyors. 6 Preventive Maintenance Of Waste Gas Cleaning System ( Wgcs ) Equipments Including Bulk Loading Spouts. 7 Preventive Maintenance Of Driving Air Blower And Suction Air Filter. 8 Preventive Maintenance Of Cooling Air Fan, Booster Fans. 9 Preventive Maintenance Of Automatic Valves. 10 Preventive Maintenance Of Electrical Hoists Cranes. 11 Preventive Maintenance Of Electrical Cranes ( Eot ) . 12 Preventive Maintenance Of Ventilation Systems. 13 Repair Of Skip Guide, Bucket Mechanism. 14 Wire Rope Changing For Skip Including Pulley Repairs. 15 Gear Box Repair / Replacement And Alignment Of Winch. 16 Repair / Replacement Pneumatic Cylinders Of Deviating Flaps, Gates, Changing Cones, Double Clapet Valves, Switching Devices. 17 Repair Of Pneumatic Gate, Deviating Flaps. 18 Replacement Of Burners Hoses / Lances / Parts. 19 Repair And Alignment Of Discharge Tables. 20 Repair And Replacement, Alignment Of Conveyor Gear Box Above 15Kw Motor. 21 Removel, Revisioning And Refixing Of Damaged Conveyor Idlers With Frame. 22 Removel, Revisioning And Refixing Of Damaged Conveyor Impact Idlers With Frame. 23 Preparation And Replacement Of Skirt Board Of All Conveyor Belts. 24 Revisioning Of Two Way Chutes / Switching Devices In Fsb, Kiln Discharge. 25 Vibrating Screen Mats Changing. 26 Vibrating Screen Shaft, Exiter Changing. 27 Repair / Replacement And Alignment Of Driving Air Blowers. 28 Replacement, Alignment Of Impeller For Wgcs Fans. 29 Replacement, Alignment Of Impeller For Booster / Cooling Air Fans. 30 Repair And Replacement Dampers Of Fans. 31 Replacement, Alignment Of Damaged Coupling Of Booster / Wgcs Fan. 32 Repair Of Screw Conveyors. 33 Cleaning And Fixing Of Bags Of Waste Gas Systems. 34 Repair / Revisioning Of Electrical Cranes / Hoists. 35 Repair / Replacement Of Utility Lines Valves. 36 Modification And Chute Repair / Fabrication / Cutting And Welding Of Retainer Plates For Refractory Lining Jobs.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender