Design , Development And Supply Of Line Replacement Unit Of Fuel System For Tractor Aircraft With High Wing Mounted Pt6-67A Engine
Tender Overview
Project Description
Design , Development And Supply Of Line Replacement Unit Of Fuel System For Tractor Aircraft With High Wing Mounted Pt6-67A Engine , Fuel Booster , Booster Pump Pressure Switch , Jet Transfer Pump , Booster Pump Non Return Valve , Inward/Outward Relief Valve , Refuel/Defuel Valve , Single Refuel/Defuel Valve Connector , Refuel/Defuel Panel , Motorized Main Fuel Shut-Off Ball Valve , Fuel Filter , Filler Cap And Adapter , Collector Tank Flapper Valve , Capacitance Probes , A ) Probe , Fuel Level , Collector +Lls+Es , B ) Probe , Fuel Level , Wing , Inner , C ) Probe , Fuel Level , Wing , Mid , D ) Probe , Fuel Level , Wing , Outer , Hls , E ) Probe , Fuel Level , Aux , Inner , +Hls , F ) Probe , Fuel Level , Aux , Outer+Es , Valve , Fuel , Drain , Magna Sticks , A ) Magna Stick , Wing , Inner , B ) Magna Stick , Wing , Outer , C ) Magna Stick , Aux , Motorized Cross Feed Shut-Off Valve For Cross Feed ( Line ) , Motive Flow Non-Return Valve , Drain Valves And Collector Dump , Vent Valve , Flame Arrestor , Fuel Flow Transmitter , Vent Tank Flapper Valve , Fuel Control Unit , Protection Boxes , Wet Cables , Mating Connectors , Fittings , For Goods Being Offered From India , Sub-Total:Ex-Works Price , Less: Discount ( If Any ) , Sub-Total: , Less: Buy-Back Price ( If Any ) , Sub-Total:Net Ex-Works Price , Add: Packing & Forwarding Charges ( If Any ) , Add: Transportation Charges ( If Any ) , Add: Insurance Charges ( From Warehouse-To-Warehouse ) ( If Any ) , Total ( A ) : , Installation & Commissioning Charges ( If Any ) , Training Charges ( If Any ) , Total ( B ) : , Bank Charges , If Any , Any Other Charges , If Any , Grand Total ( For Goods Being Offered From India ) , For Goods Being Offered From Abroad ( Fields Below - Mandatory For Foreign Vendors ) , Sub-Total:Ex-Works Price , Less: Discount ( If Any ) , Sub-Total: , Less: Buy-Back Price ( If Any ) , Sub-Total: Net Ex-Works Price , Add: Packing & Forwarding Charges ( If Any ) , Add: Inland Freight Charges ( If Any ) , Sub-Total: Fca/Fob International Gateway Airport , Add: Insurance Charges ( From Warehouse-To-Warehouse ) , Add: Freight Upto Bengaluru Airport , Total ( A ) : Cip/Cif Charges , Training Charges At Manufacturers Facility ( If Any ) , Installation & Commissioning Charges ( If Any ) At Csir-Nal , Training Charges ( If Any ) At Csir-Nal , Sub-Total: , Bank Charges , If Any , Any Other Charges , If Any , Grand Total ( For Goods Being Offered From Abroad )
BOQ
| Name of Work: DESIGN, DEVELOPMENT AND SUPPLY OF LINE REPLACEMENT UNIT OF FUEL SYSTEM as per Tender Specifications & Terms | |||||
|---|---|---|---|---|---|
| Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Fuel Booster | 24 | Nos | |
| 2 | 2 | Booster Pump pressure Switch | 12 | Nos | |
| 3 | 3 | Jet transfer Pump | 6 | Nos | |
| 4 | 4 | Booster Pump Non Return Valve | 24 | Nos | |
| 5 | 5 | Inward/Outward Relief Valve | 12 | Nos | |
| 6 | 6 | Refuel/Defuel Valve | 12 | Nos | |
| 7 | 7 | Single Refuel/Defuel Valve connector | 3 | Nos | |
| 8 | 8 | Refuel/Defuel Panel | 3 | Nos | |
| 9 | 9 | Motorized main fuel shut-off ball Valve | 6 | Nos | |
| 10 | 10 | Fuel Filter | 6 | Nos | |
| 11 | 11 | Filler Cap and Adapter | 12 | Nos | |
| 12 | 12 | Collector tank flapper Valve | 18 | Nos | |
| 13 | 13 | Capacitance Probes | |||
| 14 | 14 | a) Probe, Fuel Level, Collector +LLS+ES | 6 | Nos | |
| 15 | 15 | b) Probe, Fuel Level, Wing, Inner | 6 | Nos | |
| 16 | 16 | c) Probe, Fuel Level, Wing, Mid | 6 | Nos | |
| 17 | 17 | d) Probe, Fuel Level, Wing, Outer, HLS | 6 | Nos | |
| 18 | 18 | e) Probe, Fuel Level, Aux, Inner, +HLS | 6 | Nos | |
| 19 | 19 | f) Probe, Fuel Level, Aux, Outer+ES | 6 | Nos | |
| 20 | 20 | Valve, Fuel, Drain | 36 | Nos | |
| 21 | 21 | Magna sticks | |||
| 22 | 22 | a) Magna stick, Wing, Inner | 6 | Nos | |
| 23 | 23 | b) Magna stick, Wing, Outer | 6 | Nos | |
| 24 | 24 | c) Magna stick, Aux | 6 | Nos | |
| 25 | 25 | Motorized Cross Feed Shut-off Valve for cross feed(line) | 3 | Nos | |
| 26 | 26 | Motive flow Non-Return Valve | 6 | Nos | |
| 27 | 27 | Drain Valves and Collector Dump | 6 | Nos | |
| 28 | 28 | Vent Valve | 6 | Nos | |
| 29 | 29 | Flame Arrestor | 6 | Nos | |
| 30 | 30 | Fuel flow Transmitter | 6 | Nos | |
| 31 | 31 | Vent tank flapper valve | 6 | Nos | |
| 32 | 32 | Fuel Control Unit | 6 | Nos | |
| 33 | 33 | Protection boxes, wet cables, mating connectors, fittings | 3 | Nos | |
| 34 | 34 | For Goods Being Offered From India | |||
| 35 | 35 | Sub-Total:Ex-Works Price | 1 | Nos | |
| 36 | 36 | Less: Discount (if any) | 1 | Nos | |
| 37 | 37 | Sub-Total: | 1 | Nos | |
| 38 | 38 | Less: Buy-back Price (if any) | 1 | Nos | |
| 39 | 39 | Sub-Total:Net Ex-Works Price | 1 | Nos | |
| 40 | 40 | Add: Packing & Forwarding charges (if any) | 1 | Nos | |
| 41 | 41 | Add: Transportation Charges (if any) | 1 | Nos | |
| 42 | 42 | Add: Insurance charges (from warehouse-to-warehouse) (if any) | 1 | Nos | |
| 43 | 43 | Total (A): | 1 | Nos | |
| 44 | 44 | Installation & Commissioning charges (if any) | 1 | Nos | |
| 45 | 45 | Training charges (if any) | 1 | Nos | |
| 46 | 46 | Total (B): | 1 | Nos | |
| 47 | 47 | Bank Charges, if any | 1 | Nos | |
| 48 | 48 | Any other charges, if any | 1 | Nos | |
| 49 | 49 | Grand Total\n(For Goods Being Offered From India) | 1 | Nos | |
| 50 | 50 | For Goods Being Offered From Abroad (fields below - Mandatory for Foreign Vendors) | |||
| 51 | 51 | Sub-Total:Ex-Works Price | 1 | Nos | |
| 52 | 52 | Less: Discount (if any) | 1 | Nos | |
| 53 | 53 | Sub-Total: | 1 | Nos | |
| 54 | 54 | Less: Buy-back Price (if any) | 1 | Nos | |
| 55 | 55 | Sub-Total: Net Ex-Works Price | 1 | Nos | |
| 56 | 56 | Add: Packing & Forwarding charges (if any) | 1 | Nos | |
| 57 | 57 | Add: Inland Freight Charges (if any) | 1 | Nos | |
| 58 | 58 | Sub-Total: FCA/FOB International gateway Airport | 1 | Nos | |
| 59 | 59 | Add: Insurance charges (from warehouse-to-warehouse) | 1 | Nos | |
| 60 | 60 | Add: Freight upto Bengaluru Airport | 1 | Nos | |
| 61 | 61 | Total (A): CIP/CIF Charges | 1 | Nos | |
| 62 | 62 | Training charges at Manufacturer's facility (if any) | 1 | Nos | |
| 63 | 63 | Installation & Commissioning charges (if any) at CSIR-NAL | 1 | Nos | |
| 64 | 64 | Training charges (if any) at CSIR-NAL | 1 | Nos | |
| 65 | 65 | Sub-Total: | 1 | Nos | |
| 66 | 66 | Bank Charges, if any | 1 | Nos | |
| 67 | 67 | Any other charges, if any | 1 | Nos | |
| 68 | 68 | Grand Total\n(For Goods Being Offered From Abroad) | 1 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender