Design , Development And Supply Of Line Replacement Unit Of Fuel System For Tractor Aircraft With High Wing Mounted Pt6-67A Engine
Tender Overview
Project Description
Design , Development And Supply Of Line Replacement Unit Of Fuel System For Tractor Aircraft With High Wing Mounted Pt6-67A Engine , Fuel Booster , Booster Pump Pressure Switch , Jet Transfer Pump , Booster Pump Non Return Valve , Inward/Outward Relief Valve , Refuel/Defuel Valve , Single Refuel/Defuel Valve Connector , Refuel/Defuel Panel , Motorized Main Fuel Shut-Off Ball Valve , Fuel Filter , Filler Cap And Adapter , Collector Tank Flapper Valve , Capacitance Probes , A ) Probe , Fuel Level , Collector +Lls+Es , B ) Probe , Fuel Level , Wing , Inner , C ) Probe , Fuel Level , Wing , Mid , D ) Probe , Fuel Level , Wing , Outer , Hls , E ) Probe , Fuel Level , Aux , Inner , +Hls , F ) Probe , Fuel Level , Aux , Outer+Es , Valve , Fuel , Drain , Magna Sticks , A ) Magna Stick , Wing , Inner , B ) Magna Stick , Wing , Outer , C ) Magna Stick , Aux , Motorized Cross Feed Shut-Off Valve For Cross Feed ( Line ) , Motive Flow Non-Return Valve , Drain Valves And Collector Dump , Vent Valve , Flame Arrestor , Fuel Flow Transmitter , Vent Tank Flapper Valve , Fuel Control Unit , Protection Boxes , Wet Cables , Mating Connectors , Fittings , For Goods Being Offered From India , Sub-Total:Ex-Works Price , Less: Discount ( If Any ) , Sub-Total: , Less: Buy-Back Price ( If Any ) , Sub-Total:Net Ex-Works Price , Add: Packing & Forwarding Charges ( If Any ) , Add: Transportation Charges ( If Any ) , Add: Insurance Charges ( From Warehouse-To-Warehouse ) ( If Any ) , Total ( A ) : , Installation & Commissioning Charges ( If Any ) , Training Charges ( If Any ) , Total ( B ) : , Bank Charges , If Any , Any Other Charges , If Any , Grand Total ( For Goods Being Offered From India ) , For Goods Being Offered From Abroad ( Fields Below - Mandatory For Foreign Vendors ) , Sub-Total:Ex-Works Price , Less: Discount ( If Any ) , Sub-Total: , Less: Buy-Back Price ( If Any ) , Sub-Total: Net Ex-Works Price , Add: Packing & Forwarding Charges ( If Any ) , Add: Inland Freight Charges ( If Any ) , Sub-Total: Fca/Fob International Gateway Airport , Add: Insurance Charges ( From Warehouse-To-Warehouse ) , Add: Freight Upto Bengaluru Airport , Total ( A ) : Cip/Cif Charges , Training Charges At Manufacturers Facility ( If Any ) , Installation & Commissioning Charges ( If Any ) At Csir-Nal , Training Charges ( If Any ) At Csir-Nal , Sub-Total: , Bank Charges , If Any , Any Other Charges , If Any , Grand Total ( For Goods Being Offered From Abroad )
BOQ
| Name of Work: DESIGN, DEVELOPMENT AND SUPPLY OF LINE REPLACEMENT UNIT OF FUEL SYSTEM as per Tender Specifications & Terms | |||||
|---|---|---|---|---|---|
| Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Fuel Booster | 24 | Nos | |
| 2 | 2 | Booster Pump pressure Switch | 12 | Nos | |
| 3 | 3 | Jet transfer Pump | 6 | Nos | |
| 4 | 4 | Booster Pump Non Return Valve | 24 | Nos | |
| 5 | 5 | Inward/Outward Relief Valve | 12 | Nos | |
| 6 | 6 | Refuel/Defuel Valve | 12 | Nos | |
| 7 | 7 | Single Refuel/Defuel Valve connector | 3 | Nos | |
| 8 | 8 | Refuel/Defuel Panel | 3 | Nos | |
| 9 | 9 | Motorized main fuel shut-off ball Valve | 6 | Nos | |
| 10 | 10 | Fuel Filter | 6 | Nos | |
| 11 | 11 | Filler Cap and Adapter | 12 | Nos | |
| 12 | 12 | Collector tank flapper Valve | 18 | Nos | |
| 13 | 13 | Capacitance Probes | |||
| 14 | 14 | a) Probe, Fuel Level, Collector +LLS+ES | 6 | Nos | |
| 15 | 15 | b) Probe, Fuel Level, Wing, Inner | 6 | Nos | |
| 16 | 16 | c) Probe, Fuel Level, Wing, Mid | 6 | Nos | |
| 17 | 17 | d) Probe, Fuel Level, Wing, Outer, HLS | 6 | Nos | |
| 18 | 18 | e) Probe, Fuel Level, Aux, Inner, +HLS | 6 | Nos | |
| 19 | 19 | f) Probe, Fuel Level, Aux, Outer+ES | 6 | Nos | |
| 20 | 20 | Valve, Fuel, Drain | 36 | Nos | |
| 21 | 21 | Magna sticks | |||
| 22 | 22 | a) Magna stick, Wing, Inner | 6 | Nos | |
| 23 | 23 | b) Magna stick, Wing, Outer | 6 | Nos | |
| 24 | 24 | c) Magna stick, Aux | 6 | Nos | |
| 25 | 25 | Motorized Cross Feed Shut-off Valve for cross feed(line) | 3 | Nos | |
| 26 | 26 | Motive flow Non-Return Valve | 6 | Nos | |
| 27 | 27 | Drain Valves and Collector Dump | 6 | Nos | |
| 28 | 28 | Vent Valve | 6 | Nos | |
| 29 | 29 | Flame Arrestor | 6 | Nos | |
| 30 | 30 | Fuel flow Transmitter | 6 | Nos | |
| 31 | 31 | Vent tank flapper valve | 6 | Nos | |
| 32 | 32 | Fuel Control Unit | 6 | Nos | |
| 33 | 33 | Protection boxes, wet cables, mating connectors, fittings | 3 | Nos | |
| 34 | 34 | For Goods Being Offered From India | |||
| 35 | 35 | Sub-Total:Ex-Works Price | 1 | Nos | |
| 36 | 36 | Less: Discount (if any) | 1 | Nos | |
| 37 | 37 | Sub-Total: | 1 | Nos | |
| 38 | 38 | Less: Buy-back Price (if any) | 1 | Nos | |
| 39 | 39 | Sub-Total:Net Ex-Works Price | 1 | Nos | |
| 40 | 40 | Add: Packing & Forwarding charges (if any) | 1 | Nos | |
| 41 | 41 | Add: Transportation Charges (if any) | 1 | Nos | |
| 42 | 42 | Add: Insurance charges (from warehouse-to-warehouse) (if any) | 1 | Nos | |
| 43 | 43 | Total (A): | 1 | Nos | |
| 44 | 44 | Installation & Commissioning charges (if any) | 1 | Nos | |
| 45 | 45 | Training charges (if any) | 1 | Nos | |
| 46 | 46 | Total (B): | 1 | Nos | |
| 47 | 47 | Bank Charges, if any | 1 | Nos | |
| 48 | 48 | Any other charges, if any | 1 | Nos | |
| 49 | 49 | Grand Total\n(For Goods Being Offered From India) | 1 | Nos | |
| 50 | 50 | For Goods Being Offered From Abroad (fields below - Mandatory for Foreign Vendors) | |||
| 51 | 51 | Sub-Total:Ex-Works Price | 1 | Nos | |
| 52 | 52 | Less: Discount (if any) | 1 | Nos | |
| 53 | 53 | Sub-Total: | 1 | Nos | |
| 54 | 54 | Less: Buy-back Price (if any) | 1 | Nos | |
| 55 | 55 | Sub-Total: Net Ex-Works Price | 1 | Nos | |
| 56 | 56 | Add: Packing & Forwarding charges (if any) | 1 | Nos | |
| 57 | 57 | Add: Inland Freight Charges (if any) | 1 | Nos | |
| 58 | 58 | Sub-Total: FCA/FOB International gateway Airport | 1 | Nos | |
| 59 | 59 | Add: Insurance charges (from warehouse-to-warehouse) | 1 | Nos | |
| 60 | 60 | Add: Freight upto Bengaluru Airport | 1 | Nos | |
| 61 | 61 | Total (A): CIP/CIF Charges | 1 | Nos | |
| 62 | 62 | Training charges at Manufacturer's facility (if any) | 1 | Nos | |
| 63 | 63 | Installation & Commissioning charges (if any) at CSIR-NAL | 1 | Nos | |
| 64 | 64 | Training charges (if any) at CSIR-NAL | 1 | Nos | |
| 65 | 65 | Sub-Total: | 1 | Nos | |
| 66 | 66 | Bank Charges, if any | 1 | Nos | |
| 67 | 67 | Any other charges, if any | 1 | Nos | |
| 68 | 68 | Grand Total\n(For Goods Being Offered From Abroad) | 1 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed