Bhopal Municipal Corporation has published Supply , Installation , Testing , Commissioning And Maintenance Of Electromechanical Equipment And Allied Works For Pumping Arrangement For Water Supply System At Various Sites Under Pmay ( Second Call ). Submission Date for this Tender is 07-06-2021. Electromechanical Machinery Tenders in HFA Cell 3rd Floor ISBT Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-Mar-2021 | DATE EXTEND | Date | 03-04-2021 |
2 | 03-Apr-2021 | DATE EXTEND_1 | Date | 12-04-2021 |
3 | 09-Apr-2021 | DATE EXTEND_2 | Date | 19-04-2021 |
4 | 17-Apr-2021 | DATE EXTEND_3 | Date | 26-04-2021 |
5 | 26-Apr-2021 | Date Extend_4 | Date | 04-05-2021 |
6 | 04-May-2021 | Date Extend_5 | Date | 11-05-2021 |
7 | 10-May-2021 | Date Extend_6 | Date | 20-05-2021 |
8 | 20-May-2021 | DATE EXTEND_4 | Date | 31-05-2021 |
9 | 31-May-2021 | DATE EXTEND_7 | Date | 07-06-2021 |
Name of Work: Supply, Installation, Testing, Commissioning & Maintenance of Electromechanical equipment and allied works for Pumping arrangement for water supply system at various sites under PMAY. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Supply, Installation, Testing, Commissioning & Maintenance of Electromechanical equipment and allied works for Pumping arrangement for water supply system at various sites under PMAY. | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | 1000033972-one set of pump\nEach pump flow capacity:34 cum/hr.\nTotal head:50mtr\n4 nos. of pumps, system flow 136 cum/hr. (3w+1s) | BI01010001010000000000000515BI0100001113 | 2 | SET |
3 | 1.02 | 1000033972-one set of pump\nEach pump flow capacity:35 cum/hr.\nTotal head:45mtr\n4 nos. of pumps, system flow 140 cum/hr. (3w+1s) | BI01010001010000000000000515BI0100001114 | 3 | SET |
4 | 1.03 | 1000033972-one set of pump\nEach pump flow capacity:33 cum/hr.\nTotal head:35mtr\n4 nos. of pumps, system flow 132 cum/hr. (3w+1s) | BI01010001010000000000000515BI0100001115 | 1 | SET |
5 | 1.04 | 1000033972-one set of pump\nEach pump flow capacity:35 cum/hr.\nTotal head:45mtr\n3 nos. of pumps, system flow 105 cum/hr. (2w+1s) | BI01010001010000000000000515BI0100001116 | 6 | SET |
6 | 1.05 | 1000033972-one set of pump\nEach pump flow capacity:34 cum/hr.\nTotal head:50mtr\n2 nos. of pumps, system flow 68 cum/hr. (1w+1s) | BI01010001010000000000000515BI0100001117 | 3 | SET |
7 | 1.06 | 1000033972-one set of pump\nEach pump flow capacity:34 cum/hr.\nTotal head:50mtr\n3 nos. of pumps, system flow 102 cum/hr. (2w+1s) | BI01010001010000000000000515BI0100001118 | 1 | SET |
8 | 1.07 | 1000033972-one set of pump\nEach pump flow capacity:23 cum/hr.\nTotal head:45mtr\n3 nos. of pumps, system flow 69 cum/hr. (2w+1s) | BI01010001010000000000000515BI0100001119 | 1 | SET |
9 | 1.08 | 1000033972-one set of pump\nEach pump flow capacity:23 cum/hr.\nTotal head:50mtr\n3 nos. of pumps, system flow 69 cum/hr. (2w+1s) | BI01010001010000000000000515BI0100001120 | 1 | SET |
10 | 1.09 | 1000033972-one set of pump\nEach pump flow capacity:11.3 cum/hr.\nTotal head:25mtr\n2 nos. of pumps, system flow 22.6 cum/hr. (1w+1s) | BI01010001010000000000000515BI0100001121 | 1 | SET |
11 | 1.1 | 1000033973-the prriming sytem for negative suction\ncondition of the hydro - pneumatic fully automatic pumping system, which\nshould create a vaccum in the pumnp suction and in the section hose\nallowing all the air to be removed and the water to be drawm up word\ntwoards the pump the priming system should consist of the following main\ncomponents:\n1-a sutable capacity, vaccum pump (capacity design by the vendor )with\nelectrical motor, sutable to be operate on 415V,3phase AC power supply.\nthe power consumtion of the vaccum pump should not exist 5 KW.THE\ndesign of the vaccum priming system should with such that the priming\ntime should not exist 20sec under all operation conditions. | BI01010001010000000000000515BI0100001122 | 5 | Nos |
12 | 1.11 | 1000033974-SUPPLY AND FIXING OF FOLLOWING\nSIZE\nheavy duty PVC conduit along with accessories complete as required 25mm | BI01010001010000000000000515BI0100001123 | 285 | M |
13 | 1.12 | 1000033975-supplying and installing powder coated\nperforted M.S.MS cable trays with perforation not more than 17.5 %\nrigidly suspended from the ceiling with MS Suspendres at a distance not\nmore than 2.5m and near every/ joint etc complete as required of\nfollowing size\n100MM width X 50MM DEPTH X 1.6MM thickness | BI01010001010000000000000515BI0100001124 | 285 | M |
14 | 1.13 | 1000033976-SUPPLYING AND ERECTING EARTH\nPIT\nOF MINIMUM bore dia 150mm size approved make safe earthing eltrod\nconsisting pipe in pipe tecnology as per IS 3043-1987 made of corriosion\nfree GI pipe heaving outer pipe dia of 50MM heaving 80-200 micron\ngalvanising,iner pipe dia of 25MM heaving 20-250 micron galavinsing,\nconnection triminial dia 12MM WITH constent OHMIC value surronded buy\nhighly conductive compund with high charge disipation suitable for\nefective and maintanence free earthing with 2meter pipe in normal soil 25kg (1bag) back felling compund | BI01010001010000000000000515BI0100001125 | 19 | EA |
15 | 1.14 | 1000033977-SUPPLYING INSTALLITION TESTING\nAND\nCOMMSSIONING OF pressure tank with rubber diaphargm of following\ncapacity as per bellow given details :-\na pre -charged carbon steel/MS epoxy coated diaphargm tank with a non\nmatalic internal coating which shall insure no contact of water with the\nMS oter body,shpould be feted to the discharge pipe with a comtable\nbutyl-rubber diaphargm.it should supply water very low flow to minimies\nfrequend pump start and stock and water hambering. there should be\ncomnplete sepration bettween water and air abd there should be no\ncontact bettween water and tank compund to avoid corrosion. bladdersdiaphargm\nshould be suitable for suffient ellastic city to permit full\nexpension inside the tank insure better performance and longer working\nlife complete in all respect as per tecnical specification and as per\ndirection of engineer in charge. the tank should be either manufactured\nby the HPN manufacture or as per list of approved make.\n450LTR. pressure tank | BI01010001010000000000000515BI0100001126 | 6 | Nos |
16 | 1.15 | b) CI bend 22.5° (250mm dia)1000033977-SUPPLYING INSTALLITION TESTING\nAND\nCOMMSSIONING OF pressure tank with rubber diaphargm of following\ncapacity as per bellow given details :-\na pre -charged carbon steel/MS epoxy coated diaphargm tank with a non\nmatalic internal coating which shall insure no contact of water with the\nMS oter body,shpould be feted to the discharge pipe with a comtable\nbutyl-rubber diaphargm.it should supply water very low flow to minimies\nfrequend pump start and stock and water hambering. there should be\ncomnplete sepration bettween water and air abd there should be no\ncontact bettween water and tank compund to avoid corrosion. bladdersdiaphargm\nshould be suitable for suffient ellastic city to permit full\nexpension inside the tank insure better performance and longer working\nlife complete in all respect as per tecnical specification and as per\ndirection of engineer in charge. the tank should be either manufactured\nby the HPN manufacture or as per list of approved\n300 LTR. pressure tank | BI01010001010000000000000515BI0100001127 | 9 | Nos |
17 | 1.16 | 1000033977-SUPPLYING INSTALLITION TESTING AND\nCOMMSSIONING OF pressure tank with rubber diaphargm of following\ncapacity as per bellow given details :-\na pre -charged carbon steel/MS epoxy coated diaphargm tank with a non\nmatalic internal coating which shall insure no contact of water with the\nMS oter body,shpould be feted to the discharge pipe with a comtable\nbutyl-rubber diaphargm.it should supply water very low flow to minimies\nfrequend pump start and stock and water hambering. there should be\ncomnplete sepration bettween water and air abd there should be no\ncontact bettween water and tank compund to avoid corrosion. bladdersdiaphargm\nshould be suitable for suffient ellastic city to permit full\nexpension inside the tank insure better performance and longer working\nlife complete in all respect as per tecnical specification and as per\ndirection of engineer in charge. the tank should be either manufactured\nby the HPN manufacture or as per list of approved make.\n200LTR. pressure tank. | BI01010001010000000000000515BI0100001128 | 4 | Nos |
18 | 1.17 | 1000033978-SUPPLYING INSTALLITION PRESSURE\nGAUGE\n100MM dia, 0 TO 10KG per square CM feeted with 12/15MM DIA. pad\ncock\nvalve, and nipple, ellbow etc. as per reqirement | BI01010001010000000000000515BI0100001129 | 19 | SET |
19 | 1.18 | 1000033979-PROVIDIMG AND FIXING HEAVY\nDUTY FOOT\nVALVE type as per relivant IS standard suitable above hydro penumatic\nsystem including jointing and testing with cost of jointing material\nsuch as bolds, nuts,rubber insertion etc all complaint\n100MM DIA | BI01010001010000000000000515BI0100001130 | 1 | Nos |
20 | 1.19 | 1000033979-PROVIDIMG AND FIXING HEAVY\nDUTY FOOT\nVALVE type as per relivant IS standard suitable above hydro penumatic\nsystem including jointing and testing with cost of jointing material\nsuch as bolds, nuts,rubber insertion etc all complaint\n150MM DIA | BI01010001010000000000000515BI0100001131 | 4 | Nos |
21 | 1.2 | 1000033980-PROVIDIMG AND FIXING HEAVY\nDUTY STRAINER\nAS PER relivant IS standard suitable above hydro penumatic system\nincluding jointing and testing with cost of jointing material such as\nboats nut,rubber insertion etc all completed\n100 MM DIA | BI01010001010000000000000515BI0100001132 | 5 | Nos |
22 | 1.21 | 1000033980-PROVIDIMG AND FIXING HEAVY\nDUTY STRAINER\nAS PER relivant IS standard suitable above hydro penumatic system\nincluding jointing and testing with cost of jointing material such as\nboats nut,rubber insertion etc all completed\n150 MM DIA | BI01010001010000000000000515BI0100001133 | 13 | Nos |
23 | 1.22 | 1000033983- supply and fixing\nof Heavy duty Brass Ball type Float valve complete including Body ,Ball(+) | BI01010001010000000000000515BI0100001134 | 420 | Nos |
24 | 1.23 | 1000033985-PROVIDIMG AND FIXING BALL\nVALVE {BRASS}\nOF APPROVED QUALITY,HIGH OR LOW PRESSURE, WITH PLASTIC\nFLOATS COMPLETED\n: .\n25 MM DIA | BI01010001010000000000000515BI0100001135 | 672 | Nos |
25 | 1.24 | 1000033987-providing laying and jointing of\ngalvanised iron pipes with special (such as bends ellbows tees etc)\nclass heavy (c"class) including testing of joints cost of pipes,\nspecials and jointing materials all complete pipes and socked conforming\nto is-1239/2004 part-1 and part-2\n100 MM DIA40 | BI01010001010000000000000515BI0100001136 | 40 | RM |
26 | 1.25 | 1000033987-providing laying and jointing of\ngalvanised iron pipes with special (such as bends ellbows tees etc)\nclass heavy (c"class) including testing of joints cost of pipes,\nspecials and jointing materials all complete pipes and socked conforming\nto is-1239/2004 part-1 and part-2\n150MM DIA | BI01010001010000000000000515BI0100001137 | 220 | RM |
27 | 1.26 | 1000033989-PROVIDING AND SUPPLING M.S\nFLANGE FOR following dia of pipe as per ASA#150 standard and as per\nrelevnt IS code duly tested for usage in drinkimg water exclusive of all\nmaterial etc complete as per direction of engineer in charge\nDIA OF PIPE 100MM | BI01010001010000000000000515BI0100001138 | 60 | Nos |
28 | 1.27 | 1000033989-PROVIDING AND SUPPLING M.S\nFLANGE FOR following dia of pipe as per ASA#150 standard and as per\nrelevnt IS code duly tested for usage in drinkimg water exclusive of all\nmaterial etc complete as per direction of engineer in charge\nDIA OF PIPE 150MM | BI01010001010000000000000515BI0100001139 | 160 | Nos |
29 | 1.28 | 1000033991-PROVIDING AND FIXING BUTTERFLY\nVALVE of pn 10 raing cs/alluminium body asses 316 disk/EPDM seat\necluding jointing and testing with cost of jointing material such as\nbolds, nuts and rubber insertion all complete in all respest as per\ntechnuical specification and as per direction of ingineer incharge\nDIA OF PIPE 100MM | BI01010001010000000000000515BI0100001140 | 12 | Nos |
30 | 1.29 | 1000033991-PROVIDING AND FIXING BUTTERFLY\nVALVE of pn 10 raing cs/alluminium body asses 316 disk/EPDM seat\necluding jointing and testing with cost of jointing material such as\nbolds, nuts and rubber insertion all complete in all respest as per\ntechnuical specification and as per direction of ingineer incharge\nDIA OF PIPE 150MM | BI01010001010000000000000515BI0100001141 | 64 | Nos |
31 | 1.3 | 1000033997-PROVIDING AND FIXING\nNON return valve (sandwich type) of PN 10 rating with CI/SGI body ss316\ndisc/EPDM SEAT, COMPLETE IN ALL RESPECT AS PER TECHNICAL\nSPECIFICATION AND AS PER DIRECTION OF ENGINEER IN CHARGE\ndia of pipe 100mm | BI01010001010000000000000515BI0100001142 | 4 | Nos |
32 | 1.31 | 1000033997-PROVIDING AND FIXING\nNON return valve (sandwich type) of PN 10 rating with CI/SGI body ss316\ndisc/EPDM SEAT, COMPLETE IN ALL RESPECT AS PER TECHNICAL\nSPECIFICATION\nAND AS PER DIRECTION OF ENGINEER IN CHARGE dia of pipe\n150mm | BI01010001010000000000000515BI0100001143 | 15 | Nos |
33 | 1.32 | 1000033998-PROVIDING AND INSTALLATION FR\nPVC INSULLATED COPPER conductor single core cable in the existing\nsurface consult steel/PVC conduct/PVC casing caping in approved manner\nasper specification etc where ever required including connection testing\netc. complete of following size.\n3*1.5 square meter | BI01010001010000000000000515BI0100001144 | 275 | M |
34 | 1.33 | 1000033999-RATE FOR COMPREHENSIVE ON SITE\nand offsite maintenance of Electromechanical equipment and\nallied works for Pumping arrangement for water supply system installed a\ns above.\nNote:- After completion of mandatory two years of comprehensive\nmaintenance during the DLP the bidder will have to provide comprehensive\nmaintenance of the system installed by him for another eight years.\nComprehensive maintenance will include all spares, dismantling and\nassembling of the system, labour charges, required transportation to\nworkshop and back etc all completE\nFOR THIRTH YEAR | BI01010001010000000000000515BI0100001145 | 1 | Nos |
35 | 1.34 | 1000033999-RATE FOR COMPREHENSIVE ON SITE\nand offsite maintenance of Electromechanical equipment and\nallied works for Pumping arrangement for water supply system installed a\ns above.\nNote:- After completion of mandatory two years of comprehensive\nmaintenance during the DLP the bidder will have to provide comprehensive\nmaintenance of the system installed by him for another eight years.\nComprehensive maintenance will include all spares, dismantling and\nassembling of the system, labour charges, required transportation to\nworkshop and back etc all complete\nFOR FOURTH YEAR | BI01010001010000000000000515BI0100001146 | 1 | Nos |
36 | 1.35 | 1000033999-RATE FOR COMPREHENSIVE ON SITE\nand offsite maintenance of Electromechanical equipment and\nallied works for Pumping arrangement for water supply system installed a\ns above.\nNote:- After completion of mandatory two years of comprehensive\nmaintenance during the DLP the bidder will have to provide comprehensive\nmaintenance of the system installed by him for another eight yea\nComprehensive maintenance will include all spares, dismantling and\nassembling of the system, labour charges, required transportation to\nworkshop and back etc all complete\nFOR FIFTH YEAR | BI01010001010000000000000515BI0100001147 | 1 | Nos |
37 | 1.36 | 1000033999-RATE FOR COMPREHENSIVE ON SITE\nand offsite maintenance of Electromechanical equipment and\nallied works for Pumping arrangement for water supply system installed a\ns above.\nNote:- After completion of mandatory two years of comprehensive\nmaintenance during the DLP the bidder will have to provide comprehensive\nmaintenance of the system installed by him for another eight years.\nComprehensive maintenance will include all spares, dismantling and\nassembling of the system, labour charges, required transportation to\nworkshop and back etc all complete\nFOR SIXTH YEAR | BI01010001010000000000000515BI0100001148 | 1 | Nos |
38 | 1.37 | 1000033999-RATE FOR COMPREHENSIVE ON SITE\nand offsite maintenance of Electromechanical equipment and\nallied works for Pumping arrangement for water supply system installed a\ns above.\nNote:- After completion of mandatory two years of comprehensive\nmaintenance during the DLP the bidder will have to provide comprehensive\nmaintenance of the system installed by him for another eight year\nComprehensive maintenance will include all spares, dismantling and\nassembling of the system, labour charges, required transportation to\nworkshop and back etc all complete\nFOR SEVENTH YEAR | BI01010001010000000000000515BI0100001149 | 1 | Nos |
39 | 1.38 | 1000033999-RATE FOR COMPREHENSIVE ON SITE\nand offsite maintenance of Electromechanical equipment and\nallied works for Pumping arrangement for water supply system installed a\ns above.\nNote:- After completion of mandatory two years of comprehensive\nmaintenance during the DLP the bidder will have to provide comprehensive\nmaintenance of the system installed by him for another eight y\nComprehensive maintenance will include all spares, dismantling and\nassembling of the system, labour charges, required transportation to\nworkshop and back etc all complete\nFOR EIGHTH YEAR | BI01010001010000000000000515BI0100001150 | 1 | Nos |
40 | 1.39 | 1000033999-RATE FOR COMPREHENSIVE ON SITE\nand offsite maintenance of Electromechanical equipment and\nallied works for Pumping arrangement for water supply system installed a\ns above.\nNote:- After completion of mandatory two years of comprehensive\nmaintenance during the DLP the bidder will have to provide comprehensive\nmaintenance of the system installed by him for another eight years.\nComprehensive maintenance will include all spares, dismantling and\nassembling of the system, labour charges, required transportation to\nworkshop and back etc all complete\nFOR NINTH YEAR | BI01010001010000000000000515BI0100001151 | 1 | Nos |
41 | 1.4 | 1000033999-RATE FOR COMPREHENSIVE ON SITE\nand offsite maintenance of Electromechanical equipment and\nallied works for Pumping arrangement for water supply system installed a s above.\nNote:- After completion of mandatory two years of comprehensive\nmaintenance during the DLP the bidder will have to provide comprehensive\nmaintenance of the system installed by him for another eight years.\nComprehensive maintenance will include all spares, dismantling and\nassembling of the system, labour charges, required transportation to\nworkshop and back etc all complete\nFOR TENTH YEAR | BI01010001010000000000000515BI0100001152 | 1 | Nos |