Invitation Of Bids For Provision Of Rcc Foundation For Installation Of Ndb Antenna And Assembling , Erection Of Ndb Antenna- Ins Hansa , Dismantling & Handing Over Of Existing Towers And Antenna To The Other Customer At Ins Hansa , Dismantling & Handing Over Of Existing Atu To The Customer At Ins Hansa , Site Clearing , Cutting Of Any Trees , Plants , Unwanted Vegetation Etc . , Assembling Of Tower With All Necessary Components As Per Detailed Drawing At Ins Hansa , Complete All As Specified And Directed By Engr-In-Charge . , Fixing Of Jumper Wire , Guy Wire Ropes With All Necessary Components As Per Detailed Drawing At Ins Hansa , Complete All As Specified And Directed By Engr-In-Charge . , Raising , Erecting And Hoisting Of Assembled Antenna Into Position Required With Mounting Of Solar Panel Into Position And Atu Rack Installation In Position , Including Aviation Lamp Fixing And Laying The Cable Through Steel Flexible Pipe As Per Drawing At Ins Hans , Complete All As Specified And Directed By Engineer In-Charge . , Mounting Of Solar Pannel Into Required Position And Atu Rack Installation In Position , Including Aviation Lamp Fixing And Laying The Cable Through Steel Flexible Pipe Required As Per Drawing At Ins Hansa Complete All As Specified And Directed By Engr-In-Charge . , Fixing And Laying Of Copper Radials In Below Ground Level . , Trenching And Provisioning Of And Laying Of Pvc Pipe For Power Cable Between Transmitter Room And Tower , Provision Of Chemical Earth Pits With Copper Material Including Construction Of Chambers And Cast Iron Covers . , Excavating In Trenches , N . Exc 1 . 5M Wide And N . Exc 1 . 5 In Depth For Foundation Etc , Or For Shafts , Wells , Cesspits , Manholes , Pier Holes , Etc , N . Exc 10 Sqm On Plan And N . Exc 1 . 5 In Depth And Getting Out In Soft/Loose Soil Complete All As Specified And Directed By Engr-In-Charge . , Material And Labour Charge For Hardcore Of Gauge N . Exc 63Mm , Deposited , Spread And Leveled In Layers N . Exc 15Cm Thick , Watered And Rammed To A True Surface Complete All As Specified And Directed By Engr-In-Charge . , Material And Labour For Formwork To Curved Surface Sides Fo Concrete Foundations , Footings , Bases Of Coloums , Raft And Raft Beams , Sides And Soffits ( If Any ) Of Foundation And Plinth Beams , And Similar Work , Vertical Oa To Better With Rough Finished Surface Complete All As Specified And Directed By Engr-In-Charge . , Material And Labour For Rcc 1:1:5:3 Ratio In Foundations , Including Rafts , Footings , Bases For Columns , Etc Mass Concrete Complete All As Specified And Directed By Engr-In-Charge . Note: Water Has To Be Arranged By The Contractor For Civil Work . The Price Quoted In Inclusive Of This . , Returning , Filling In , Including Spreading , Leveling , Watering And Well Ramming In Layers N . Exc 25Cm In Soil Complete All As Specified And Directed By Engr-In-Charge . , Material And Lobour For Tmt Bars 10Mm Dia And Over , Cut To Length , Bent To Shape Required , Including Cranking , Bending Spirally For Hooping For Columns , Hooking Ends And Binding With The Including Mild Steel Wire ( Annealed ) Not Less Than 0 . 9Mm Dia Or Securing With Clips Complete All As Specified And Directed By Engr-In-Charge . , Removing Excavated Material Exc 50M And N . Exc 250M Depositing Where Directed At A Level N . Exc 1 . 5M Above The Starting Point Etc , Complete All As Specified And Directed By Engr-In-Charge .