| 1 | 1 | Scarifying existing bituminous road surface to a depth of 50 mm and disposal of scraified material within all lifts and lead upto 1000 metres. (MORD-301.4(3.1)) | | 3920 | SQM |
|---|
| 2 | 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | | 218 | CUM |
|---|
| 3 | 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | | 498 | CUM |
|---|
| 4 | 4 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.75kg/sqm usingmannual means . | | 2963 | SQM |
|---|
| 5 | 5 | Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom . | | 16364 | SQM |
|---|
| 6 | 6 | Providing and laying dense graded bituminous macadam with 100 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix , transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 507 complete in all respects. | | 409 | CUM |
|---|
| 7 | 7 | Providing and laying bituminious concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects. | | 327 | CUM |
|---|
| 8 | 8 | Cleaning of drain including carting of malwa upto distance of 3 km. etc. all complete. | | 1140.96 | Cum |
|---|
| 9 | 9 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness . | | 7692 | Sqm |
|---|
| 10 | 10 | Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. | | 1364.5 | Cum |
|---|
| 11 | 11 | Removal of existing cement concrete wearing coat including its disposal complete as per Technical Specification without causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000 m | | 5005 | SQM |
|---|
| 12 | 12 | Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. | | 865.35 | Cum |
|---|
| 13 | 13 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level.\n1:5:10 (1 Cement : 6 Coarse Sand (Zone-III) : 10 graded stone aggregate 40 mm (nominal size) as per S.I. No. 4.1.10 | | 102.12 | Cum |
|---|
| 14 | 14 | Brick work with common brunt clay (non modular) brick of class - 150 in cement mortar 1:4 (1 Cement : 4 coarse sand) in superstructure above plinth level and upto floor five level. As per S.I. No. 6.4 | | 709.065 | Cum |
|---|
| 15 | 15 | Stuck Pointing on brick work with cement mortar in 1:3 with consisting of one part cement & 3 part of fine sand including supply of all materials, labours, T&P etc. required proper completion of work (SI No. 13.31.1) | | 2778.1 | Sqm |
|---|
| 16 | 16 | 15mm Cement Plaster on rough side of single or half brick wall of mix : \n1:4 (1 Cement : 4 Coarse Sand) 13.8.1 | | 277.5 | Sqm |
|---|
| 17 | 17 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | | 699.75 | Cum |
|---|
| 18 | 18 | Laying of 80 mm thick pre moulded inter locking paver tiles over 20 cm compected GSB including 4 cm thick coarse sand bed over prepared surface including all labour T&P etc. required for proper completion of work. | | 4665 | Sqm |
|---|
| 19 | 19 | Half brick circular tree guard in bricks, internal diameter 1.25 metre and height 1.2 metre above ground and 0.20 m below ground, bottom two courses laid dry and top three courses in cement mortar 1:6 (1 cement : 6 fine sand) and the intermediate courses being in dry honey comb masonry as per design complete: | | 250 | Nos |
|---|
| 20 | 20 | Details of cost of plantation for 100 Trees/ 200 Shrubs/300 Hedge/ground covers (based on actual observation) Preparation of pits for plantation putting vigorous growth, removing polythene bags/earthen pots/ carefully to avoid breaking of earth, plantation and watering to plant, removal of unserviceable and waste materials from the site | | 250 | Nos |
|---|