| 1 | 1 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer in-charge within a distance of 60 metres (200 ft.) | | 6 | Cum |
|---|
| 2 | 2 | Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-in-charge within a dislance of 60 metres(200 ft)\n | | 6 | Cum |
|---|
| 3 | 3 | Dismantling doors & windows, including chowkhat with hold fast & including stacking of dismantled materials, as directed by the Engineer-in-charge within a distance of 60 m (200 ft.) | | 12 | Sqm |
|---|
| 4 | 4 | Dismantling existing plaster including disposal of refuse as directed by the Engineer-incharge within a distance of 60 metre (200 ft). | | 310 | Sqm |
|---|
| 5 | 5 | Scraping old white or colour wash including disposal of refuse as directed by Engineer in Charge with in a distance of 60 meters (200 feet) SI 708 | | 550 | Sqm |
|---|
| 6 | 6 | Earthwork in foundation in mixed soil with moorum / kankar in bundelkhand area including lift upto 1.5m and lead upto 30m and including filling, watering and ramming the excavated earth into the space between the building and sides of foundation trenches or in to the plinth and removal and disposal of surplus earth as desired by the Engineer - in - charge upto a distance of 30m from the foundation trenches (SI No.- 252) | | 10 | Cum |
|---|
| 7 | 7 | Stone dust filling in plinth or foundation including ramming and dressing including s/o all material labour T&P etc complete. | | 9 | Cum |
|---|
| 8 | 8 | Plain cement concrete 1:4:8 cement coarse sand 40 mm stone ballast etc. complete. | | 25 | Cum |
|---|
| 9 | 9 | First class brick work in 1:6 cement and fine sand of 1.25 FM mortar in super structure including supply of all material labour and T&P etc complete SI No 303+310 | | 7 | Cum |
|---|
| 10 | 10 | RCC work with cement approved coarse sand and 2 cm (3/4\") gauge approved stone ballast in the proportion of 1:1.5:3 in slab of door and window including sipply of all material, labour T&P etc complete as per required for proper completion of work SI No 288(1) | | 22 | Cum |
|---|
| 11 | 11 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. | | 15 | Qtl |
|---|
| 12 | 12 | 12mm thick cement plaster with 1:4 ratio cement and sand mortar with finishing coat neat cement sturry with supply of all material labour T&P. | | 1000 | Sqm |
|---|
| 13 | 13 | S/F 35 mm sitapur comercial ply wood door shutter as per SI No 470/2 | | 4 | Sqm |
|---|
| 14 | 14 | Painting and varnishing three coat including etc complete required for proper completion of the work SI No 641+642 | | 80 | Sqm |
|---|
| 15 | 15 | Cement Concrete flooring in 1:2:4 cement coarse sand and stone aggregate to size 20 mm laid in one layer finished with flooring coat 665 | | 20 | Sqm |
|---|
| 16 | 16 | PVC water storage tank syntex or equipment 1000 ltr | | 1000 | Per Ltr |
|---|
| 17 | 17 | PVC low level cistern 10 ltr capacity with all internal fitting | | 6 | Per No |
|---|
| 18 | 18 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface of prepare the surface even and smooth complete. DSR 2014 SI No 13.26 | | 780 | Sqm |
|---|
| 19 | 19 | Providing and laying of 8 to 10 mm thick vetrified tiles of 600 mm x 600 mm size in flooring or skirting laid wirh 1:3 cement mortar (1 cement : 3 coarse sand) finishing with cement slurry & with pigment grouting & polishing complete I/c supply of all material labour T&P etc required for proper completion of work | | 80 | Sqm |
|---|
| 20 | 20 | Supply & Fixing of fully glaged aluminium window including grill and all fixers including supply of all material labour T&P etc required for proper completion fo work. | | 15 | Sqm |
|---|
| 21 | 21 | Distemper three coat including etc complete required for proper completion of the work SI No 660+661 | | 650 | Sqm |
|---|
| 22 | 22 | 80mm Interlocking C.C. block laid in stone dust base & fill joint with 2.36 mm stone dust at joint filled with S/D after leveling & dressing base including supply of all material labour and tools and plants etc. required for proper completion of the work. | | 70 | Sqm |
|---|
| 23 | 23 | P/f decorative celling tiles false celling including supply of labour T&P etc. | | 70 | Sqm |
|---|
| 24 | 24 | Providing and applying fiber reinforced elastomeric liquid waterproofing membrane with resilient acrylic polymers having sun reflectivity index (SRI) of 105 on top of concrete roof in three coats.\nOne coat of self - priming of elastomeric waterproofing liquid (Dilution with water of 3:1) and two coats of undiluted elastomeric waterproofing liquid (Dry film thickness if complete application/system not less than 500 microns).\nThe operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, and repairing all the cracks and joints by crack - seal PU sealant | | 100 | Sqm |
|---|
| 25 | 25 | Providing and laying 8 mm thick wooden floor including all fixing, labour, material T&P etc complete. | | 15 | Sqm |
|---|
| 26 | 26 | Providing & Fixing Big Size Gamla with plant including all complete. | | 10 | Nos |
|---|
| 27 | 27 | Providing & Fixing of Superior Quality Curtains including all complete. | | 9 | Nos |
|---|
| 28 | 28 | Random course rubble masonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of material as order by the Engineer-in-charge, labour, T&P etc, required for proper completion of work SI No NI 1 | | 40 | Cum |
|---|