Reconstruction Of Vrb ( Box Culvrt ) At Km 3 . 800 On Mansoorganj Dy Reconstruction Of Vrb ( Box Culvrt ) At Km 3 . 800 On Mansoorganj Dy
Tender Value
Ref. Documents
Estimated cost
Bid Submission
10 Mar 2021
0 days left
EMD
61000
Bank guarantee accepted
Document Fee
854
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
mahrajganj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Reconstruction Of Vrb ( Box Culvrt ) At Km 3 . 800 On Mansoorganj Dy
BOQ
| Name of Work:- Reconstruction of (Box Culvert) VRB at km 3.800 on Mansoorganj Dy. (LOT-6) | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. | 260.67 | Cum | |
| 2 | 2 | Earth work for making Ramp and correction of bank, Diversion and making jeepable service road and removing the diversion after work including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 192.71 | Cum | |
| 3 | 3 | Laying C.C. 1:4:8 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and old brick ballast and usable malba ( Collected from dismantaling of old DRB/VRB) including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 27.78 | Cum | |
| 4 | 4 | Laying C.C. 1:3:6 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work. | 9.85 | Cum | |
| 5 | 5 | Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work. | 251.53 | Sqm | |
| 6 | 6 | Bending, binding cutting placing in position rainforcement steel including cost of binding wire and tack wilding with material. and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | 10.76 | MT | |
| 7 | 7 | Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | 125.37 | Cum | |
| 8 | 8 | Laying C.C. work in M-25 sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) Bearing coat 75mm thick top of the slab and parapet. including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge. | 3.59 | Cum | |
| 9 | 9 | Laying R.C.C. work in 1:1.5:3 (M-25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | 16.9 | Cum | |
| 10 | 10 | Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work. | 11.52 | Sqm | |
| 11 | 11 | Dismelting of old V.R.B. and proper disposal including all cost of materials,T&P and labours etc. | 6.21 | Cum | |
| 12 | 12 | Runnig of 5 H.P. genrater set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work. | 336 | Per Hour | |
| 13 | 13 | Boring with 150 mm dia casing pipe including lowering and extension of assembly loading unloading and carraige including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge. | 24 | RM | |
| 14 | 14 | Dry brick on Edge Pitching including prepration of sub-grade to prescrib Slop ,filing joint with mortor T&P etc. | 138.9 | Sqm | |
| 15 | 15 | Fixing wheel guard stone including cost of all material ,labour, t&p etc. required for proper completion of work | 4 | Nos. | |
| 16 | 16 | Sing borad at site for notice both side including cost of all material ,labour, t&p etc. required for proper completion of worK. | 2 | Job |
AI Tender Summary
Tender Timeline
Mar 05, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedMar 10, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 10, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender